ML18054A437

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1988 for Palisades Nuclear Plant
ML18054A437
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/30/1988
From: Goralski G, Packard G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8812140261
Download: ML18054A437 (5)


Text

1:...

OPERATING DATA REPORT DOCKET NO 50-255 *..

DATE 12-05-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 OPERATING STATIJS NOTES

1.

Unit Name: Palisades

2.

Reporting Period:

881101-881130

3.

Licensed '11\\ermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Mazimum Dependable Capacity (Cross MWe): **770

7.

Muimum Dependable Capacity (Net MWe):

    • 730
8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10. Reasons for Restriction1, if any: -----------------------

'11\\is Month Yr-to-Date ll. Hours In Reporting Period 720.0 81040.0

12. Number of Hours Reactor Was Critical 123.1 41 711.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 41.3 41589.2
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 291640.0 1019081744
17. Gross Electrical Energy Generated (MWH) 61800.0 314871585
18.

Net Electrical Energy Generated (MWH) 41430.0 313021309

19. Unit Service Factor 5.7 57.l
20. Unit Availability Factor 5.7 57.l
21. Unit Capacity Factor (U1ing MDC Net) 0.8 56.3
22. Unit Capacity Factor (U1ing DER Net) 0.8 51.0
23. Unit Forced Outage Rate o.o 14.0
24.

Shutdowns Scheduled Over Next Six Month* (Type, Date and Duration of

25. If Shut Down at End of Report Period, E1timated Date of Start Up:
26. Unit* in Test Statu1 (Prior to Coaaercial Operation):

INI'!'IAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast

    • Baaed on conden1er backpre1sure
  • Weighted Average (635 MWe u1ed a1 MDC Net prior to October 1985)

OC0185-0001B-OP03 as 1214<)261 ~~6b~~55 PDR ADOCK PI*C:

R Cumulative 1481599.0 78 1728.o 741855.4 15810961661 4914011105 4615191343 50.4 50.4

  • 48.2 38.9 34.9 Each):

Achieved

A.RAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 12-05-88 COMPLETED BY CCPacka.rd TELEPHONE (616)764-8913 MONTH _

__.N"""'O""'"V""'EH;.;.;B;;.;;E;.;;.R;......;;;.l.;;..98;;;.;8;;.._... __

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)

(HWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

. 21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 9

13 0

29 15 14 0

30 161 15 0

16 0

IBSTllUCTI OHS:

On thi1 format, li1t the average daily unit power level in MWe-Bet for each day in the reporting month.

Compute to the neare1t whole megawatt.

OC0185-0001C-OP03

REPORT MONTH __

.;..;.NO;;..;.V~EMB~ER_;_.,;;..19;;_;;88=---

No.

Date Typel Duration Reason2 20 880808 s

21 882811 s

1.
2.

F: Forced S: Scheduled OC0185-0001D-OP03 (Hours) 661.8 c

16.9 B

Reason:

A-EquipMtnt Failure (Explain)

B-Maintenance or Test C-Refue11ng D-Regulatory Restriction E-Operator Training & License Exui net ion F-Adlllinistrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report I 1

4

3.

Method:

1-Manual 2-Manual Scr1111 3-AutOIDatic Scru 4-0ther (Explain)

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

I, DOCKET NO. -----

5::..::0c...;-2::..::5:..::.5 UNIT NAME ____

P"'"al_i..;;;.s"'"ad""'e~s DATE -----=1=2-....:0;.;;..5.....:-88=

COMPLETED BY ----=G=CPc..::a:.:oc.:..:.;ka::.;.r.=d TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Scheduled refueling Main Turbine Overspeed Testing

5.

Exhibit. I - Same Source

.O:.

\\

'~

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1988 The reactor went critical for the first time on November 25, 1988 at 205~

hours and was placed online on November 28, 1988 at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br />.

The unit was taken offline at 2329 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.861845e-4 months <br /> to perform main turbine overspeed testing.

On November 29, at 1623 hours0.0188 days <br />0.451 hours <br />0.00268 weeks <br />6.175515e-4 months <br />, the unit was placed online and escalated to 35% power for a boric acid soak of the steam generators and remained at this power level through the end of the reporting period.

OC0185-0001E-OP03

lj l'llWERINli llllCHlliAN"S PROliRESS Paliudes Nuclear Plant: 2neo Blue Ster Memorial Highway, Coven. Ml 49043 December 5, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTifLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Sumnary of Operating Ezperience for the Palisades Nuclear Plant for the month of November, 1988.

~~.e.i*

George Goralski Reactor Engineer CC: DPHoffman, P26-117B ICMHaas, Pali*ades ABDavia, USNRC KWBerry, P24-614B CSKozup, Palisades Resident Inspector, Palisades DI.Hackett, Pll-4208 CWBruckmann, Div of Radiological Health Services, Lansing, Michigan SI.Hall, Michigan Dept of Labor RCallen, Michigan Public Service Coamission Records Center, IHPO, Atlanta, GA 1"1'aylor, CE, Palisades AAAlatalo, Pali,ades LLBumb, P21-324 GBSzczotk.a, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L CCP88*036 OC0185-0001A-OP03