Text
,* h '*!*
. f****
Docket No. 50-255 Consumers Power Company ATTN:
David P. Hoffman Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:
JUL G 8 "1988 This is to acknowledge receipt of your letter of May 19, 1988, which transmitted changes to the Palisades Site Emergency Plan.
These revisions were received in this office on May 26, 1988.
The revisions included Revision 9 to Section 4, Emergency Conditions; and Revision 6 to Figure"'tL-1,:*Em.ergency Facilities, which is part of Section 7, Emergency Facilities and Equipment.
We have completed our review of the Palisades Emergency Plan including those sections listed above., In Section 4 plan changes consisted of revision of certain Emergency Action Levels (EALs) which were previously discussed between Messrs. Brunet, Frigo, and Malone of your staff and Messrs. Patterson and Foster of my staff in a teleconference on March 9, 1988.
Our review of these finalized EALs in Section 4 of the plan has determined that they are satisfactory and the revisions will not decrease the effectiveness of the plan.
The change to Figure 7-1 which now includes the Maintenance Support Center in the communication links for onsite emergency response facilities is also acceptable.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan.
However, if your.
safety review indicates no decrease in emergency preparedness effectiveness, then changes can be made without prior NRC approval.
In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).
Also., changes to the Emergency Plan Implementing Procedures should be mad~ in a'ccordance with the requirements of 10 CFR, Part 50, Appendix E, §~ction V (Implementing Procedures).
.. *,:_ ~..-
In accordand~~*,~i:th 10 CFR 2.790 of the Commission's regulations, a copy of this letter w'ill be placed in the NRC's Public Document Room.
8807190147 ~~~55 PDR ADOCK pNU F
Consumers Power Company 2 JUL 0 8 1988 If you have any questions concerning this letter, please contact Mr. James Patterson of my staff at (312) 790-5536.
Sincerely,
- Original signed by W.D. Sbai'er" cc:
Mr. Kenneth W. Berry, Director Nuclear Licensing Gerald B. Slade, General Manager DCD/DCB (RIDS)
Licensing Fee Management Branch Resident Inspctor, RIII Ronald Callen, Michigan Public Service Commission Michigan Department of Public Hea 1th W. Travers, EPB, NRR W. Weaver, FEMA RV R. LaFreniere, RIII rt,J W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch RIII
~
lr-\\~S Ph'tters n/ Jaw ye.r RIII