Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317B463 + (ML17317B463)
- ML17317B464 + (ML17317B464)
- 05000316/LER-1979-026, Forwards LER 79-026/03L-0 & Corrected Copy of LER 79-025/03L-0 + (ML17317B465)
- ML17317B466 + (ML17317B466)
- ML17317B467 + (ML17317B467)
- ML17317B468 + (ML17317B468)
- IR 05000461/2017502 + (ML17317B469)
- 05000315/LER-1978-065, Updated LER 78-065/03X-1 on 781229:previous Rept of Inoperable Pressurizer Level Channel Is No Longer Considered RO Due to Recent Tech Spec Change Deleting All Pressurizer Low Level Operability Requirements + (ML17317B471)
- 05000316/LER-1979-025, /03L-0 on 790723,previously Issued as LER 79-025/03L-0:while Reviewing Computer Printout,Discovered K 0900 Address Not Reset to 0 Prior Ro Scanning Core.Temporary Change Sheet Issued + (ML17317B472)
- 05000315/LER-1979-022, Updated LER 79-022/03X-1 on 790323:to Prevent Recurrence of Nearly Simultaneous Bus Failures,Battery Equalizing Charge Has Been Reduced from 280 to 275 Volts.Addl Design Change Requested to Provide Overvoltage Alarm to Alert Op + (ML17317B473)
- 05000315/LER-1979-030, Updated LER 79-030/03X-1 on 790417:design Change Coupled W/Relay Degradation Caused Relay to React Slower During Sequence.Design Change RFC-DC-12-2384 Installed as Preventive Measure + (ML17317B474)
- 05000315/LER-1979-039, Updated LER 79-039/03L-0 on 790720:control Sys Repaired to Deliver Larger Quantity of Acid to Rcs.No Further Action Planned + (ML17317B475)
- ML17317B476 + (ML17317B476)
- ML17317B481 + (ML17317B481)
- ML17317B483 + (ML17317B483)
- ML17317B484 + (ML17317B484)
- ML17317B486 + (ML17317B486)
- ML17317B487 + (ML17317B487)
- ML17317B488 + (ML17317B488)
- ML17317B489 + (ML17317B489)
- ML17317B492 + (ML17317B492)
- ML17317B493 + (ML17317B493)
- 05000315/LER-1979-040, Forwards LER 79-040/03L-0 + (ML17317B494)
- ML17317B495 + (ML17317B495)
- 05000315/LER-1979-040-03, /03L-0 on 790726:during Moderator Coefficient Test,Reactor Power Decreased from 79% to 58% in 43 Minutes. Iodine Isotopic Analysis Not Performed in Required Time. Caused by Poor Communication Between Operator & Supervisor + (ML17317B496)
- ML17317B497 + (ML17317B497)
- ML17317B499 + (ML17317B499)
- ML17317B500 + (ML17317B500)
- ML17317B501 + (ML17317B501)
- ML17317B503 + (ML17317B503)
- ML17317B505 + (ML17317B505)
- ML17317B506 + (ML17317B506)
- ML17317B507 + (ML17317B507)
- ML17317B508 + (ML17317B508)
- ML17317B509 + (ML17317B509)
- ML17317B512 + (ML17317B512)
- IR 05000315/1979017 + (ML17317B513)
- ML17317B514 + (ML17317B514)
- ML17317B515 + (ML17317B515)
- ML17317B516 + (ML17317B516)
- 05000316/LER-1979-028, Forwards LER 79-028/03L-0 + (ML17317B518)
- ML17317B519 + (ML17317B519)
- ML17317B520 + (ML17317B520)
- ML17317B521 + (ML17317B521)
- ML17317B524 + (ML17317B524)
- IR 05000315/1979018 + (ML17317B526)
- 05000315/LER-1979-041-03, /03L:on 790814,ground Was Discovered on Boron Injection Tank Train B Heaters.Heater Train Removed from Svc & Required Action Items of Tech Specs 3.5.4.2 Were Followed.Caused by Natural End of Life + (ML17317B532)
- ML17317B534 + (ML17317B534)
- ML17317B536 + (ML17317B536)
- ML17317B537 + (ML17317B537)
- ML17317B539 + (ML17317B539)