ML17317B468

From kanterella
Jump to navigation Jump to search
Forwards Updated LERs 78-065/03X-1,79-022/03X-1, 79-030/03X-1,79-038/03L-0 & 79-039/03L-0
Date released: 09/20/2019 Download: ML17317B468


Updated LER 79-038/03L-0 on 790717:engineering Review in Progress to Determine Cause of Recurring Problem of Indicated Position of Control Rods N-13 & H-6 Exceeding Tech Specs
ML19249A279
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/15/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19249A279 (2)
Updated LER 79-039/03L-0 on 790720:control Sys Repaired to Deliver Larger Quantity of Acid to Rcs.No Further Action Planned
ML17317B475
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/15/1979
From: Chadwell H
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B475 (4)
Updated LER 79-030/03X-1 on 790417:design Change Coupled W/Relay Degradation Caused Relay to React Slower During Sequence.Design Change RFC-DC-12-2384 Installed as Preventive Measure
ML17317B474
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/15/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B474 (2)
Updated LER 79-022/03X-1 on 790323:to Prevent Recurrence of Nearly Simultaneous Bus Failures,Battery Equalizing Charge Has Been Reduced from 280 to 275 Volts.Addl Design Change Requested to Provide Overvoltage Alarm to Alert Operators
ML17317B473
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/15/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B473 (2)
Updated LER 78-065/03X-1 on 781229:previous Rept of Inoperable Pressurizer Level Channel Is No Longer Considered RO Due to Recent Tech Spec Change Deleting All Pressurizer Low Level Operability Requirements
ML17317B471
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/15/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B471 (2)
Forwards Updated LERs 78-065/03X-1,79-022/03X-1, 79-030/03X-1,79-038/03L-0 & 79-039/03L-0
ML17317B467
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/15/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B467 (17)