ML17317B521

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-02,Revision 1,Suppl 1, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. No Action Required
ML17317B521
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/20/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 7909070176
Download: ML17317B521 (1)


Text

Docket No. 5p 3Ig 0 316 kaecican Electric Power Service Corporation Zndiana and Mfcldgan Power Company ATTN'r. John E. Dolan Vice Chaiaaan tngineering and Construction 2 Broachray See York, SY I0004 AUG2 0 1979 Oentleaen:

Enclosed is ZE Bulletin Ho. 79-02, Revision I~ Supplement Ho. I~

which clarifies XRC positions on actions requested with regard to your power reactor facilities with an operating license.

Should you have <<ny questions regarding this Su11etin or the actions required by you, please contact this office.

Sincerely, James G. Keppler Director Bnciosure o

IR Suiletin Mo ~2 Revi<<ion Mo. I (Suppl~t Ro. I) cc r/encl:

Ãt. D V

Shaller, Plant Manager Central Files
Director, HRR/DPM Director, XRR/D0R PDR Local PDR NSXC TlC Ronald Callen, Bichig<<n Public Service Ccmuniasion g909PVOL ~

Po OFFICE SURNaME1 net'EI BIXI.

Heis n/gc 8/17/j9 igloo