ML17317B524

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/79-18 & 50-316/79-14 on 790601-30.No Noncompliance Noted
ML17317B524
Person / Time
Site: Cook  
Issue date: 07/19/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17317B525 List:
References
NUDOCS 7909120132
Download: ML17317B524 (2)


See also: IR 05000315/1979018

Text

gD8 RECy

(4

~o

co

0

t

e

~O

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOIS60137

JUL 19

1979

CENTRa

Docket No. 50-315jP"/$

Docket'o.

50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

and Construction

2 Broadway

New York,,NY

10004

Gentlemen:

This refers to the inspection

conducted

by Mr. R. E. Masse of this office

on June

1-30,

1979, of activities at Donald C.

Cook Nuclear Power Plant,

Units

1 and 2, authorized

by NRC Operating Iicenses

No. DPR-58 and No.

DPR-74 and to the discussion of our findings with Mr. D. Shaller

and

others of your staff at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined

during the inspection.

Within these

areas,

the inspection consisted

of a

selective

examination of procedures

and representative

r'ecords,

observa-

tions,

and interviews with personnel.

No items of noncompliance with NRC requirements

were identified during

the course of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal Regulations,

a copy of this letter and the

enclosed

inspection report will be placed in the NRC's Public Document

Room, except

as follows. If this report contains information that you or

your contractors

believe to be proprietary,

you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure.

The application must include

a

full statement of the reasons

for which the information is considered

proprietary,

and should be prepared

so that proprietary information

identified in the application is contained in an enclosure to the

application.

American Electric Power

Service Corporation

Indiana

and Michigan

Power

Company

JUL 19 1979-

We will gladly discuss

any questions

you have concerning this

inspection.

Sincerely,

Enclosure:

IE Inspection

Reports

No. 50-315/79-18

and No. 50-316/79-14

R. F. Heishman,

Chief

Reactor Operations

and

Nuclear Support Branch

cc w/encl:

Mr. D. V. Shaller,

Plant Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local

PDR

NSIC

TIC

Ronald Callen,

Mi'chigan Public

Service

Commission

Citizens for a Better Environment

RII

RI~II

P

RIII

p'asse

Boyd

Heishman

~ if ">

-iiffi

7/17/79

q/f