Forwards IE Insp Repts 50-315/79-10 & 50-316/79-07 on 790521-24 & Notice of Violation
ML17317B497
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/03/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17317B498 List:
References
NUDOCS 7908290520
Download: ML17317B497 (4)


See also: IR 05000315/1979010

Text

~D,R RECII

~c,~

ip

~O

+w*w+

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOIS60137

JUL 3

1979

Docket No. 50-315/~ I-l0

Docket No. 50-316

UNITED STATES

NUGLEAR REGULATQRYcoMMlssloN

CEIIITIIIILFILES

REGION III

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman,

Engineering

and Construction

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the inspection

conducted

by Mr. W. J.

Key of this office

on May 21-24,

1979, of activities at D.

C.

Cook Nuclear Power Plant,

Units

1 and 2, authorized

by NRC Operating Licenses

No. DPR-58 and

No. DPR-74 and to the discussion of our findings with Mr. D. Shaller

and

others of your staff at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined

during the inspection.

Within these

areas,

the inspection consisted

of a

selective

examination of procedures

and representative

records,

observations,

and interviews with personnel.

During this inspection,

certain of your activities appeared

to be in

noncompliance with NRC requirements,

as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires

you to submit to this office within twenty days of

your receipt of this notice

a written statement

or explanation in reply,

including for each item of noncompliance:

(1) corrective action taken

and

the results

achieved;

(2) corrective action to be taken to avoid further

noncompliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal Regulations,

a copy of this letter,

the

enclosures,

and your response

to this letter will be placed in the NRC's

Public Document

Room, except

as follows. If the enclosures

contain

information that you or your contractors believe to be proprietary,

you

must apply in writing to this office, within twenty days of your receipt,

of this letter, to withhold such information from public disclosure.

The

application must include

a full statement

of the reasons

for which the

F9082 905~

l

e

OYE

l

American Electric Power

Service Corporation

"2-

.JUL 3

1979

information is considered proprietary,

and should be prepared

so that

proprietary information identified in the application is contained in an

enclosure

to the application.

We will gladly discuss

any questions

you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction

and

Engineering

Support Branch

No. 50-315/79-10

No. 50"315/79-07

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

and

cc w/encls.

Mr. D. V. Shaller, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service

Commission

Executive Director, Citizens

for a Better Environment

RIII

Key/s

6/2 /79

RIII

an>.e

son

(p/%g

RIII p,g

RIII

P6 jC

Fiorelli

Masse