ML17317B495

From kanterella
Jump to navigation Jump to search
Forwards LER 79-040/03L-0
Date released: 05/31/2018 Download: ML17317B495


LER 79-040/03L-0 on 790726:during Moderator Coefficient Test,Reactor Power Decreased from 79% to 58% in 43 Minutes. Iodine Isotopic Analysis Not Performed in Required Time. Caused by Poor Communication Between Operator & Supervisor
ML17317B496
Person / Time
Site: Cook 
Issue date: 07/26/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B496 (2)
Forwards LER 79-040/03L-0
ML17317B494
Person / Time
Site: Cook 
Issue date: 08/22/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B494 (4)