ML17317B501

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Suppl 1, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML17317B501
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/15/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 7908300262
Download: ML17317B501 (1)


Text

Docket No. 50-315 Docket No. 50-316 g

erican Electric Power Service

~Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin. If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

Supplement IE Bulletin No. 79-14 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission

.tizens for a Better Environment RIII He'man/bk 8/14/79 RIII Keppler s/~-

'I

~ ~088 OP ye~