ML17317B503

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Action Required
ML17317B503
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/26/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 7908300385
Download: ML17317B503 (2)


Text

JUL 86 1979 locket No. 50-315 Rocket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan, Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Bulletin No. 79-17 is forwarded to you for action.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 79-17 cc w/encl:

Mr. D. V. Shaller, Plant Manager Central Files

Director, NRR/DPM
Director, NRR(DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment RIII RIII He s an/blk p ler 7/25/79 A2

>908s oq gp~

t (f'f)t(

'(