Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17292A767 + (ML17292A767)
- ML17292A769 + (ML17292A769)
- ML17292A770 + (ML17292A770)
- GO2-97-060, Forwards Figures 1-6,inadvertently Omitted from Ltr + (ML17292A773)
- IR 05000397/1997099 + (ML17292A776)
- ML17292A778 + (ML17292A778)
- GO2-97-061, Submits Info to Be Added to Initial Evaluation Re TS Response Time Testing + (ML17292A779)
- GO2-97-063, Provides Addl Description of Exigent Circumstances for 970322 Request for Amend Re TS Response Time Testing + (ML17292A781)
- ML17292A782 + (ML17292A782)
- GO2-97-067, Forwards Rev 25 to Operational QA Program Description (WPPS-QA-004) + (ML17292A784)
- ML17292A785 + (ML17292A785)
- ML17292A786 + (ML17292A786)
- RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks + (ML17292A788)
- L-2017-188, Supplemental Information for License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications to Licensee Controlled Documents + (ML17292A789)
- GO2-97-065, Forwards Response to RAI Re Response Time Testing + (ML17292A790)
- ML17292A791 + (ML17292A791)
- GO2-97-068, Ro:On 970327,reactor Scrammed.Evaluation Results,Conclusions & Corrective Actions Will Be Shared W/Nrc Prior to Plant Startup from Maint & Refueling Outage + (ML17292A792)
- ML17292A794 + (ML17292A794)
- IR 05000397/1996009 + (ML17292A796)
- ML17292A797 + (ML17292A797)
- ML17292A798 + (ML17292A798)
- ML17292A799 + (ML17292A799)
- ML17292A801 + (ML17292A801)
- ML17292A803 + (ML17292A803)
- ML17292A804 + (ML17292A804)
- ML17292A806 + (ML17292A806)
- GO2-97-071, Forwards Response to RAI Related to Response Time Testing. W/Related Info + (ML17292A807)
- ML17292A808 + (ML17292A808)
- ML17292A809 + (ML17292A809)
- ML17292A810 + (ML17292A810)
- ML17292A811 + (ML17292A811)
- ML17292A812 + (ML17292A812)
- IR 05000397/1997008 + (ML17292A814)
- ML17292A816 + (ML17292A816)
- GO2-97-070, Monthly Operating Rept for Mar 1997 for WNP-2 + (ML17292A817)
- ML17292A818 + (ML17292A818)
- ML17292A819 + (ML17292A819)
- IR 05000397/1996201 + (ML17292A821)
- ML17292A822 + (ML17292A822)
- IR 05000397/1996202 + (ML17292A824)
- 05000397/LER-1997-003, :on 970320,notification of Noncompliance W/Ts as TS SRs for Response Time Testing Were Not Being Met for Specified Instrumentation in Rps,Pcis & Eccs.Requested Enforcement Discretion for One Time Exemption + (ML17292A825)
- ML17292A826 + (ML17292A826)
- ML17292A827 + (ML17292A827)
- GO2-97-077, Forwards WNP-2 RPV Surveillance Matls Testing & Analysis, Rept,Iaw 10CFR50,App H.Util Evaluated Surveillance Matl Test Results to Determine Whether Analyses in NEDO-32205 Are Applicable to WNP-2 Reactor Vessel Matl + (ML17292A828)
- ML17292A829 + (ML17292A829)
- 05000397/LER-1997-005, :on 970327,valid Reactor Scram Signal Received Due to Low Water Level Condition During Preparations for SRV Testing.Caused by Risks & Consequences of Decisions Not Completely Identified.Restored Water Level + (ML17292A831)
- GO2-97-080, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-03.Corrective Actions:Operations Manager Issued Night Order Stressing Importance of Reviewing Impact Statement Prior to Removing Equipment from Svc + (ML17292A832)
- GO2-97-085, 1996 Annual Radiological Environ Operating Rept + (ML17292A834)
- ML17292A835 + (ML17292A835)
- GO2-97-083, Forwards Audit 297-005, WNP-2 Emergency Preparedness Program. Three Problem Evaluation Requests & 10 Recommendations for Improvement Issued as Result of Audit Activities + (ML17292A837)
- ML17292A838 + (ML17292A838)