EN-96-084A:on 961121,notice of Proposed Imposition of Civil Penalty in Amount of $100,000 Issued to Licensee.Action Based on Several Instances of Required Surveillances Not Performed
ML17292A778
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/14/1997
From: Lieberman J, Satorius M
NRC OFFICE OF ENFORCEMENT (OE)
To:
References
EA-96-327, EN-96-084A, EN-96-84A, NUDOCS 9704070358
Download: ML17292A778 (2)


Text

CATEGORY REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9704070358 DOC.DATE: 97/02/14 NOTARIZED: NO

'OCKET FACIL:M-39'0 WPPSS Nuclear Project, Unit 2, Washington Public Pose 05000397 AUTH.NAME AUTHOR AFFILIATION SATORIUS,M.

Ofc of Enforcement (Post 870413)

LIEBERMAN,J.

Ofc of Enforcement (Post 870413)

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

EN-96-084A:on 961121,notice of proposed imposition of civil penalty in amount of

$100,000 issued to licensee. Action based on several instances required surveillances not performed.

DISTRIBUTION CODE: IE33F COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Enforcement Notice (EN)

NOTES:

RECIPIENT ID CODE/NAME INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB NUDOCS FULL TXT OE FILE Ol EXTERNAL: LITCO BRYCEiJ H NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME FILE CENTER RB OE DIR NOAC COPIES LTTR ENCL 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST!

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO1 DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL 10

February 14.

1997 EN 96-84A OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

Washington Public Power Supply System (EA 96-327)

Washington Nuclear Project, Unit 2 (WNP-2 Docket No.

50-397

~Sub'ect:

IHPOSITIOM OF CIVIL PENALTY -

$100,000 By EN 96-084 dated November 21, 1996, the Commission was notified of the intent of OE to issue a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $100,000 to Washington Public Power Supply System.

The action was based on several instances in which required surveillances were not performed.

In some cases, mode changes were made without assurance that required equipment was operable, and in one case, a mode change was made with one train of the control room emergency filtration system inoperable.

The violations were collectively characterized as a Severity Level III problem.

Although credit was warranted for both the factors of identification and corrective action, the root causes of the violations were similar to previous violations that were part of a Severity Level III problem and proposed

$50.000 civil penalty issued in August 1995 (EA 9F 096).

Thus, to emphasize the failure of the licensee's previous corrective actions to preclude similar violations from occurring, and to emphasize the fundamental importance of having an effective program for assuring that survei llances are performed as

required, the staff exercised discretion under VII.A.1 of the Enforcement Policy and proposed a

$100,000 civil penalty.

The licensee responded to the Notice in a letter dated December 23.

1996.

In that letter the licensee admitted the violations, but requested reconsideration of the penalty.

After careful consideration of the licensee's

response, the staft has concluded that the licensee did not provide an adequate basis for mitigation of the civil penalty.

Accordingly, an Order Imposing Civil Honetary Penalty in the amount of

$100.000 has been issued today.

Under the terms'f the Order, the licensee may within 30 days of the.date of the Orders pay the civi 1 penalty or request a hearing.

Contacts:

H. Satorius, OE, 415-2747 J.

Lieberman, OE. 415-2741 Distribution OWFN OWFN Chairmaan acFson EOO Comm.

Rogers DEDR Comm.

Dicus DEDO Comm.

Diaz OE Comm. HcGaffigan OGC SECY NRR OCA OI PA SP IP OC AEOD OP CTR NHSS IRH OIG RES ACRS Regional Offices RI RIV RII WCFO RIII HAIL NUDOCS PUBLIC PRELIMINARY INFORHATION -

NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION 9704070358 9702i4 PDR ISE EN-96-08@A PDR a

Oi