ML17292A799
| ML17292A799 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/11/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292A800 | List: |
| References | |
| EA-97-105, NUDOCS 9704170074 | |
| Download: ML17292A799 (9) | |
See also: IR 05000397/1997004
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9704170074
DOC.DATE: 97/04/11
NOTARIZED: NO
FACIL:50-397 WPPSS Nuclear Project,
Unit 2, Washington Public
Powe
- AUTH.NAME
AUTHOR AFFILIATION
YNN,T.P.
Region
4 (Post
820201)
ECIP.NAME
RECIPIENT AFFILIATION
ARRISH,J.V.
Washington 'Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/97-04
on 970210-14
& notice of
violation.
DOCKET ¹
05000397
RECI'P IENT .
ID CODE/NAME
PD4-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
COLBURNFT
COPIES
LTTR ENCL
'1.
1,
DISTRIBUTION CODE: IEOIF
COPIES
RECEIVED:LTR Q ENCL g
SIZE: X+/
TITLE: General
(50 Dkt,)-Insp Rept/Notice of Violation Response
NOTES:
T
F
INTERNAL: ACRS
LE Cg
NRR DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
2
2
1
1
1
1
1
1
1
1
1
1
1
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT.
OGC/HDS3
1
1
1
1
1
1
1
1
.1
1
1
1
E
ERNAL: LITCO BRYCEFJ
H
NRC PDR'
1
1
'1
NOAC
NUDOCS FULLTEXT
1
1
1
1
D
, <go~~
'eggy
ssgy
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
. pp RECII
gC
"r
EA 97-105
UNIT E D STAT ES
NUCLEAR REGULAT
". "~;. "'S..~
REGION IV
611 RYAN PLAZA DRIVE, SLIITE 400
AR LIN G TON, T E XAS 76011 8064
APR
l
f
I997
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
SUBJECT:
NRC SPECIAL INSPECTION REPORT 50-397/97-04 AND NOTICE OF
~
VIOLATION
Dear Mr. Parrish:
An NRC special inspection was conducted
February 10-14, 1997, at your Washington
Nuclear Project-2 facility, with a preliminary exit on February 14, 1997, and in-office
review through March 14, 1997.
A final exit meeting was conducted
on March 19; 1997.
The enclosed report presents the scope and results of that inspection.
Two violations of NRC requirements
were identified during this inspection.
The first
violation concerns nonconservative
.assumptions
and errors made during the analysis of
instantaneous
overcurrent relay setpoints for safety-related
pump. electrical breakers.
The
second violation concerns the failure to perform an evaluation of safety-related substitute
pressure switches, which should have ideritified a,difference
in component configuration.
'I
These violations are cited in the enclosed Notice of. Violation (Notice) and the
circumstances
surrounding them are described
in detail in the enclosed report.
You are
required to respond to Violation A of the notice.
In preparing youV response,
you should
follow the instructions specified in the enclosed Notice.'he NRC will use your response,
in part, to determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
The NRC has concluded that information regarding the reason for Violation B and the
corrective actions taken and planned to correct the violation and prevent recurrence
are
already adequately
addressed
in the enclosed report.
Therefore, you are not required to
respond to Violation B unless the description therein does hot accurately reflect your
corrective aetio."Is or your position.
In that case, or if you choose to provide additional
information, you should follow the instructions specified in the enclosed
Notice.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter,
its enclosures,
and your response
will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response
should not include any personal privacy, proprietary,
or safeguards
information so that it can be placed in the PDR without redaction.
9704i70074 9704ii
ADQCK 05000397
6,
'PDR
IIHHIIIIIIIIllllillllllllllllllKIIIHIIIII
Washington Public Power Supply System
-2-
Should you have any questions
concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Docket No.: 50-397
License No.:
omas P. Gwy n, D re tor
Division of Rea tor o'ts
I
Enclosures:
1.
2.
NRC Inspection Report
50-397/97-04
cc w/enclosuresi
Frederick S. Adair, Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Paul R. Bemis (Mail Drop PE20)
Vice President, .Nuclear Operations
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President,
Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Washington Public Power Supply System
-3-
Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power, Supply System
P.O. Box 968
Richland, Washington
99352-0968
Ms. Lourdes C. Fernandez
(Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
.
Mr. Malcolm H. Phillips, Jr., Esq.
Winston 5 Strawn
1400 L Street, N.W.
D.C. 20005-3502
Washington Public Power Supply System
-4-
APR
l
I
j997
E-Mail report to T. Boyce (THB),
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD'(IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO,. WCFO)
WCFO File
DOCUMENT NAME: R:i WN2iWP704RP.GWJ
To receive copy of document,
Indicate ln box: "C" = COpy without encl
ures
"E" = Copy with enclosures
"N" = No copy
RIV:PI:DRP/E
C:DRP/E
D:DRP
GWJohnston
HJWong ~
TPGwynn
03
/97
fry 03~97
/ /97
OF ICIAL RECORD COPY
'ashington
Public Power Supply System
-4-,
APR
j
j
j997
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
'cc to DCD (IE01)
bcc distr'ib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
~
WCFO File
DOCUMENT NAME: R:i WN2iwp704RP.GWJ
To receive copy of document,
Indicate In box: "C" = Copy without enciosures
"E" = Copy with enclosures
"N" = No copy
RIV:PI:DRP/E
C:DRP/E
D:DRP
GWJohnston
~
HJWong ~
TPGwynn
03
/97
fr y 03+97
/
97
OFFICIAL RECORD COP.Y