Forwards Corrective Actions Insp Rept 50-397/96-202 on 970128-0206.No Violations Noted.Insp Found That No Deficient Root Cause Analyses & Corrective Actions Were Contributing Factors to Recurrence of Events
ML17292A822
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/23/1997
From: Gallo R
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A823 List:
References
NUDOCS 9704250240
Download: ML17292A822 (10)


See also: IR 05000397/1996202

Text

i>>

(

. -i

8 AEGIS~

0%I

'0p0

Cy

>>C,

I

nO

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON> D.C. 2055&4001

Apx'il 23,

1997

Mr. J.

V. Parrish,

Chief Executive Officer

Washington Public

Power

Supply System

3000 George

Washington

Way

P.O.

Box 968,

ND 1023

Richland,

WA 99352

SUBJECT:

NRC

INTEGRATED CORRECTIVE ACTIONS INSPECTION 50-397ir'96-202

Dear Nr. Parrish:

During the period from January

28 through February 6,

1997,

The Special

Inspection

Branch of the Office of Nuclear Reactor

Regulation

(NRR) conducted

an inspection of the corrective action program at Washington Nuclear Project

2

(WNP-2).

The enclosed

report presents

the results of that inspection.

The inspection

found the problem identification process

generally effective.

Tracking of issues

and trending problems

using cause

codes

are strengths

and

help to identify adverse

trends.

The inspection

found that deficient root cause

analyses

and corrective actions

were contributing factors to recurrence of events.

Your corrective action

process

is effective in evaluating

and correcting

immediate

equipment

problems

and resolving significant issues,

but not in evaluating

and correcting

causes

of problems.

This was reflected in our review of root cause

analyses,

although

some root cause

analyses

were comprehensive

and appropriate

in depth.

Corrective actions

were sometimes limited to individual problems

and not

applied to related

equipment or human performance

issues.

Your 1995

and

1996

performance

self-assessments

identified human performance

issues

as

an

important contributor to unexpected

events.

The cause of this general

issue

has riot been identified and corrected.

We recognize that you have invested

considerable

resources

in such initiatives as the Business

Plan,

the Peer

Review Process,

the Corrective Action Review Board,

"Timeouts,"

and other

'nitiatives to improve

human per.ormance.

No response

to this letter is required.

The

NRC Region

IV staff will issue

any enforcement

actions that

may result from this inspection.

9704250240

97042$

PDR

ADOCK 05000397

8

PDR

r

pl'I I

JgQW

I

I

Mr. J.

V. Parrish

~

~

~

~

In accordance

with 10 CFR 2.790,

a copy of this letter and its enclosures will

be placed in the

NRC Public Document

Room (PDR).

Should you have

any

questions

concerning this inspection,

please

contact

me at (301) 415-2967.

S'erely

Robert

M. Gallo, Chief

Special

Inspection

Branch

Division of Inspection

and Support

Programs

Office of Nuclear Reactor Regulation

Docket No.: 50-397

Enclosure:

Inspection

Report 50-397/96-202

cc:

See next page,

~

~

~

~

~

~

~

Mr. J.

V. Parrish

-2-

In accordance

with 10 CFR 2.790,

a copy of this letter and its enclosures will

be placed in the

NRC Public Document

Room (PDR).

Should you have

any

questions

concerning this,inspection,

please

contact

me at (301) 415-2967.

Sincerely,

ORIGINAL SIGNED BY

Robert

M. Gallo, Chief

Special

Inspection

Branch

Division of Inspection

and Support

Programs

Office of Nuclear Reactor Regulation

Docket No.: 50-397

Enclosure:

Inspection

Report 50-397/96-202

cc:

See next page

  • See previous concurrence

DOCUMENT NAME: A:iFOLEY.RPT

To receive a copy of this document, indicate in the box: "C" ~ Copy without enciosures

"E" ~ Copy with enclosures"

" ~ No copy

OFFICE

PSIB:DISP

PSIB'DISP

PDIV-2:NRR

PS

B DIS

C.

Re ion IV

NAME

DATE

TFol e

04/21/97*

DPNorkin

04/1/97*

WHBateman

04/2>/97

OFFICIAL RECORD

COPY

RM

o

04

3/97

TPruett

4/1/97 (E-mail )

Mr. J.

V. Parrish

In accordance with 10 CFR 2.790,

a copy of this letter and its enclo

res wi 11

be placed in the

NRC Public Document

Room (PDR).

Should you have

a

questions

concerning this inspection,

please contact

Thomas Foley t

(301) 415-1036.

Sincerely,

Robert

M. Gallo, Chief

Special

Inspection

Branch

Division of Inspection p'nd Support

Programs

Office of Nuclear

Rea tor Regulation

Docket No.: 50-397

Enclosure:

Inspection Report 50-397/96-202

cc:

See next page

DOCUMENT NQ

To receive a copyof this,document, indicate in the box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

OFFICE

PSIB: DISP

TFole

044~/97

PSIB:DISP

DPNorkin

04/g~/97

PDI -2 NRR

04/2(/97

PSIB:DISP

RMGallo

04/

/97

Region

IV

TPruet

4/1/97

(E-mail

)

J.

V. Parrish

CC:

Hr. Greg 0. Smith (Hail Drop 927M)

WNP-2 Plant General

Manager

Washington Public Power Supply

System

P.O.

Box 968

Richland,

Washington

99352-0968

Hr. Al E. Houncer (Hail Drop 396)

Chief Counsel

Washington Public Power Supply

System

P.O.

Box 968

Richland,

Washington

99352-0968

-3-

Hr. Rodney L. Webring (Mail Drop PE08)

Vice President,

Operations

Support/PIO

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Ms. Lourdes .C. Fernandez

(Hail Drop PE20)

Manager,

Licensing

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Mr. Frederick

S. Adair, Chairman

Energy Facility Site Evaluation Council

P. 0.

Box 43172

Olympia, Washington

98504-3172

Mr. David A. Swank (Hail Drop PE20)

Manager,

Regulatory Affairs

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Hr. Paul

R.

Bemis (Hail Drop PE20)

Vice President,

Nuclear Operations

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Regional. Administrator,

Region

IV

U.S. Nuclear Regulatory

Commission

Harris Tower

8 Pavilion

611

Ryan Plaza Drive, Suite 400

Arlington, Texas

76011-8064

Chairman

Benton County Board of Commissioners

P.O.

Box 69

Prosser,

Washington

99350-0190

Senior Resident

Inspector

U.S. Nuclear Regulatory

Commission

P.O.

Box 69

Richland,

Washington

99352-0968

H.

H. Philips, Jr.,

Esq.

Winston

& Strawn

1400

L Street,

N.W.

Washington,

DC

20005-3502

1

)

Distribution:

~Docket

Fil~es

PSIB R/F

FPGillespie,

NRR

RHGallo,

NRR

DPNorkin,

NRR

CERossi,

AEOD,

GDReplogle,

RIV

JRoe

WBateman

MEPoteat

Regional Administrators

Regional Division Directors

Inspection

Team

PUBLIC

ACRS (3)

OGC (3)

IS Distribution

l

I

0