NUCLEAR REGULATORY COMMISSION
WASHINGTON> D.C. 2055&4001
Apx'il 23,
1997
Mr. J.
V. Parrish,
Chief Executive Officer
Washington Public
Power
Supply System
3000 George
Way
P.O.
Box 968,
Richland,
WA 99352
SUBJECT:
NRC
INTEGRATED CORRECTIVE ACTIONS INSPECTION 50-397ir'96-202
Dear Nr. Parrish:
During the period from January
28 through February 6,
1997,
The Special
Inspection
Branch of the Office of Nuclear Reactor
Regulation
(NRR) conducted
an inspection of the corrective action program at Washington Nuclear Project
2
(WNP-2).
The enclosed
report presents
the results of that inspection.
The inspection
found the problem identification process
generally effective.
Tracking of issues
and trending problems
using cause
codes
are strengths
and
help to identify adverse
trends.
The inspection
found that deficient root cause
analyses
and corrective actions
were contributing factors to recurrence of events.
Your corrective action
process
is effective in evaluating
and correcting
immediate
equipment
problems
and resolving significant issues,
but not in evaluating
and correcting
causes
of problems.
This was reflected in our review of root cause
analyses,
although
some root cause
analyses
were comprehensive
and appropriate
in depth.
Corrective actions
were sometimes limited to individual problems
and not
applied to related
equipment or human performance
issues.
Your 1995
and
1996
performance
self-assessments
identified human performance
issues
as
an
important contributor to unexpected
events.
The cause of this general
issue
has riot been identified and corrected.
We recognize that you have invested
considerable
resources
in such initiatives as the Business
Plan,
the Peer
Review Process,
the Corrective Action Review Board,
"Timeouts,"
and other
'nitiatives to improve
human per.ormance.
No response
to this letter is required.
The
NRC Region
IV staff will issue
any enforcement
actions that
may result from this inspection.
9704250240
97042$
ADOCK 05000397
8
r
pl'I I
JgQW
I
I
Mr. J.
V. Parrish
~
~
~
~
In accordance
with 10 CFR 2.790,
a copy of this letter and its enclosures will
be placed in the
NRC Public Document
Room (PDR).
Should you have
any
questions
concerning this inspection,
please
contact
me at (301) 415-2967.
S'erely
Robert
M. Gallo, Chief
Special
Inspection
Branch
Division of Inspection
and Support
Programs
Office of Nuclear Reactor Regulation
Docket No.: 50-397
Enclosure:
Inspection
Report 50-397/96-202
cc:
See next page,
~
~
~
~
~
~
~
Mr. J.
V. Parrish
-2-
In accordance
with 10 CFR 2.790,
a copy of this letter and its enclosures will
be placed in the
NRC Public Document
Room (PDR).
Should you have
any
questions
concerning this,inspection,
please
contact
me at (301) 415-2967.
Sincerely,
ORIGINAL SIGNED BY
Robert
M. Gallo, Chief
Special
Inspection
Branch
Division of Inspection
and Support
Programs
Office of Nuclear Reactor Regulation
Docket No.: 50-397
Enclosure:
Inspection
Report 50-397/96-202
cc:
See next page
- See previous concurrence
DOCUMENT NAME: A:iFOLEY.RPT
To receive a copy of this document, indicate in the box: "C" ~ Copy without enciosures
"E" ~ Copy with enclosures"
" ~ No copy
OFFICE
PSIB:DISP
PSIB'DISP
PDIV-2:NRR
PS
B DIS
C.
Re ion IV
NAME
DATE
TFol e
04/21/97*
DPNorkin
04/1/97*
WHBateman
04/2>/97
OFFICIAL RECORD
COPY
o
04
3/97
TPruett
4/1/97 (E-mail )
Mr. J.
V. Parrish
In accordance with 10 CFR 2.790,
a copy of this letter and its enclo
res wi 11
be placed in the
NRC Public Document
Room (PDR).
Should you have
a
questions
concerning this inspection,
please contact
Thomas Foley t
(301) 415-1036.
Sincerely,
Robert
M. Gallo, Chief
Special
Inspection
Branch
Division of Inspection p'nd Support
Programs
Office of Nuclear
Rea tor Regulation
Docket No.: 50-397
Enclosure:
Inspection Report 50-397/96-202
cc:
See next page
DOCUMENT NQ
To receive a copyof this,document, indicate in the box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
OFFICE
PSIB: DISP
TFole
044~/97
PSIB:DISP
DPNorkin
04/g~/97
04/2(/97
PSIB:DISP
RMGallo
04/
/97
Region
IV
TPruet
4/1/97
)
J.
V. Parrish
CC:
Hr. Greg 0. Smith (Hail Drop 927M)
WNP-2 Plant General
Manager
Washington Public Power Supply
System
P.O.
Box 968
Richland,
99352-0968
Hr. Al E. Houncer (Hail Drop 396)
Chief Counsel
Washington Public Power Supply
System
P.O.
Box 968
Richland,
99352-0968
-3-
Hr. Rodney L. Webring (Mail Drop PE08)
Vice President,
Operations
Support/PIO
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Ms. Lourdes .C. Fernandez
(Hail Drop PE20)
Manager,
Licensing
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Mr. Frederick
S. Adair, Chairman
Energy Facility Site Evaluation Council
P. 0.
Box 43172
Olympia, Washington
98504-3172
Mr. David A. Swank (Hail Drop PE20)
Manager,
Regulatory Affairs
Washington Public Power Supply System
P.O.
Box 968
Richland,
99352-0968
Hr. Paul
R.
Bemis (Hail Drop PE20)
Vice President,
Nuclear Operations
Washington Public Power Supply System
P.O.
Box 968
Richland,
99352
Regional. Administrator,
Region
IV
U.S. Nuclear Regulatory
Commission
Harris Tower
8 Pavilion
611
Ryan Plaza Drive, Suite 400
Arlington, Texas
76011-8064
Chairman
Benton County Board of Commissioners
P.O.
Box 69
Prosser,
99350-0190
Senior Resident
Inspector
U.S. Nuclear Regulatory
Commission
P.O.
Box 69
Richland,
99352-0968
H.
H. Philips, Jr.,
Esq.
Winston
& Strawn
1400
L Street,
N.W.
20005-3502
1
)
Distribution:
~Docket
Fil~es
PSIB R/F
FPGillespie,
RHGallo,
DPNorkin,
CERossi,
AEOD,
GDReplogle,
RIV
JRoe
WBateman
MEPoteat
Regional Administrators
Regional Division Directors
Inspection
Team
PUBLIC
ACRS (3)
OGC (3)
IS Distribution
l
I
0