Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) RC-99-0066, Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.751999-03-31031 March 1999 Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.75 ML20205B9981999-03-29029 March 1999 Informs That Authority & Sce&G Has Ownership Interests of one-third & two-thirds,respectively in VC Summer Nuclear Station.Operating License Scheduled to Expire in 2022.Rept Addresses Decommissioning Cost Estimates & Financing RC-99-0054, Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)1999-03-22022 March 1999 Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii) RC-99-0053, Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 121999-03-22022 March 1999 Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 12 RC-99-0048, Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info1999-03-10010 March 1999 Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info ML20207J5661999-02-16016 February 1999 Requests That Proprietary Rev 1 to WCAP-14932 Re Rv Closure Head Penetrations Integrity for VC Summer Nuclear Plant,Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4) RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear1999-02-0505 February 1999 Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear RC-99-0023, Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed1999-02-0101 February 1999 Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed 05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated1999-01-28028 January 1999 Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated RC-99-0015, Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl1999-01-22022 January 1999 Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations1999-01-15015 January 1999 Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations RC-98-0225, Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl1998-12-14014 December 1998 Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl1998-12-14014 December 1998 Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl RC-98-0216, Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response1998-12-0404 December 1998 Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response RC-98-0189, Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f1998-11-24024 November 1998 Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f RC-98-0207, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment1998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment RC-98-0177, Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.71998-11-0909 November 1998 Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.7 RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs1998-11-0202 November 1998 Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1998-10-30030 October 1998 Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions RC-98-0186, Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance1998-10-26026 October 1998 Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance RC-98-0185, Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 11998-10-0909 October 1998 Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 1 RC-98-0182, Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs1998-10-0808 October 1998 Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs RC-98-0178, Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes1998-10-0505 October 1998 Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes 1999-09-28
[Table view] |
Text
. - - - .-
South Cir lina Electric & G:s C:mpany Gary J. Taylor P.o. Box 88 Vice Pr:sident Jenkinsville, SC 29065 Nuclear operations (803) 345-4344 SCE&G Ascaucamey l
February 17, 1997 RC-97 0030 Ms. Mary Drouin Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission MS T10E50 Washington, DC 20555
Dear Ms. Drouin:
4
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 COMMENTS ON DRAFT NUREG 1560; INDIVIDUAL PLANT EXAMINATION PROGRAM: PERSPECTIVES ON REACTOR SAFETY AND PLANT PERFORMANCE; VOLUMES 1 AND 2 This letter provides comments on the Nuclear Regulatory Commission's DRAFT i
NUREG - 1560 which documents the insights gained through review of Individual Plant Examination (IPE) submitted by plants in response to Generic Letter 88-20.
South Carolina Electric & Gas Company (SCE 3) has reviewed Volume 1, Part 1 and Volume 2, Parts 2 - 5. In Volume 2, Part 5, Chapter 17, page 17-11, the summarization statement for Table 17.5 (last paragraph, third sentence) is in error. The statement
"(i.e., two of three EDGs for safe plant shutdown following a LOSP)" should read "(i.e.,
one of two EDGs for safe plant shutdown following a LOSP)". This condition is presented accurately in Table 17.5 on page 17-12.
This comment is provided to enhance the accuracy of the NUREG as requested in the FOREWORD to each Volume.
SCE&G appreciates the opportunity to review and provide comments on this draft document.
Should you have any questions, please call Mr. Jim Turkett at (803) 345-4047.
Very tr y yours, Ga
%J. Ta r a
JT/GJT 9703200328 970306 PDR ADOCK 05000395 P PDR
Office of Nuclear Regulatory Research NRG 1560 RC-97-0030 Page 2 of 2.
c: J.L. Skolds T.D. Gatlin W.F. Conway J.B. Knotts, Jr.
- R.R. Mahan NSRC l
R.J. White RTS (NRG 1560)
L.A. Reyes File (811.10)
A.R. Johnson DMS (RC 97-0030)
NRC Resident inspector Branch Chief, Rules Review and Directive Branch
. . _ _ ~ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ .. _ _. _ _.
1 NIAGARA MOHAWK G E N E R ATIO N MNE KE POWT NUCLEAR STATION / LAKE ROAD, P.O. BOX 63. LYCOMING, NEW YORK 13033 )
BUSINESS GROUP !
! MARTIN J. MCCORMICK JR.
Vica President Nuclear Engineering February 14,1997 NMPIL 1182 l
l Mary Drouin Office ofNuclear Regulatory Research Mail Stop T-10-E50 US Nuclear Regulatory Commission Washington, DC 20555-0001 RE:
Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 ;
DPR-63 NPF-69 '
Subject:
Comments on DraftNUREG-1560
Dear Ms. Drouin:
A December 11,1996 letter from F. J. Miraglia (NRC) to B. R. Sylvia requested comments on draft NUREG-1560 by February 14,1997. The purpose of this letteris to provide Niagara Mohawk's comments, which are attached.
Since the NUREG discusses issues of broad industry interest as well as issues specific to Nine Mile Point Units I and 2, our comments, attached, are grouped accordingly. The first group of comments deals with general industry issues. The second group of comments deals with issues specific to Nine Mile Point Unit 1. The final group of comments deals with issues specific to Nine Mile Point Unit 2.
It is requested that my office be kept informed of the resolution of our comments. Thank you for your cooperation in this regard.
Y Djh&Db
l , .
l Page 2 -
Questions can be referred to Robert F. Kirchner at 315-349-7323. If we can be of further assistance, please call. l 1
Very tmly yours, l Martin J. McCormick Jr.
! Vice President Nuclear Engineering 1
l Attachments cc: Document Control Desk Mr. H. J. Miller, NRC Regional Administrator Mr. S. S. Bajwa, Acting Director, Project Directorate I-1, NRR i Mr. B. S. Norris, Senior Resident Inspector l D. S. Hood, Senior Project Manager, NRR '
Records Management )
1
, l l
l I
l f l
l 1
i i I l l
l
(
4 i
- Draft NUREG-1560 General Comments 4
G-1 The definition of a quality PRA outlined in the NUREG is subjective and should not necessarily be derived from comparison ofIPE results. While the information on PRA qual."y is useful, the PRA quality section of this NUREG should be characterized as specifically applicable only to the NUREG comparison effort.
Any applicability to the creation of an industry standard should be classified as developmental in nature. An industry-wide standard for PRA quality should be based on a broader and more deliberative development effort that involves practitioners from various organizations. This effort should include, among other things, an assessment of the benefit versus cost of additional analytical detail in specific areas of PRA.
G-2 (Page xix) The NUREG indicates that MAAP is not a comprehensive computer code. MAAP models the complete progression of a severe accident and is comprehensive in its treatment. MAAP can be characterized as limited by the uncertainty in severe accident phenomena and simplification due to the need for I relatively fast computation in PC and Vax environments, but we believe it should not be called non-comprehensive.
G-3 (Page xix) The NUREG indicates that invalid HRA assumptions have been used in IPEs. However,in section 13 of the NUREG such HRA issues are classified as inconsistencies with potential explanations. The characterization of apparent HRA anomalies is more appropriately described in section 13. In fact, on Page 1-3 the authors indicate that they did not consider the accuracy of the information in the IPEs. It would appear that references to invalid HRA assumptions cannot be defended by the body of the NUREG and it is premature to label such issues as invalid, i
G-4 (Page 3-1) Statement "However, BWRs only remove heat directlyfrom the primary system ..." ignores the shutdown cooling function and, for a few older BWRs, emergency cendensers.
G-5 (Page 12-13) The NUREG indicates that isolation is a negligible contributor to early release partly because the containment is inerted and isolation failure can be easily detected. A number of valves are open during normal operation and event response. For containment isolation success, a portion of these valves must transfer closed on demand. An inerted containment has no bearing on this failure mode. The reliability of such containment penetrations is more tied to design issues (i.e., use of fail closed AOVs and check valves). It should be pointed out that containment isolation, while reliable, is not a negligible contributor to risk.
The risk achievement worth of such valves can be significant in terms oflarge-early release.
G-6 (Page 6 '16) The use of 1/3 failure in place of zero failures is called inappropriate.
The use of a fraction of a failure is a common technique for dealing with censored
. . . _ _ _ _ . __ _ - = . . . . _ _ . . . . . . _ __ . _ _ . _ _ . _ . . _ _ . _ _ _ . . . _ _ . . _ _ _ _ _ . _
data. While not always appropriate, it should not be characterized as inappropriate in all circumstances.
G-7 Section 18 presents a comparison of NUREG-1150 results with IPE results as a whole. A more interesting comparison would be between the individual NUREG-I 1150 results and the corresponding IPEs. This would provide more detailed information on specific modeling issues.
i
a Draft NUREG-1560 Comments Directly Relating to NMP1 i NMP1-1 (Page 3-13) "New pump seal materials have been implemented at Nine Mile Point 1... " should read "New reactor recirculation pump seal..."
NMPl-2 (Page 10-12,10-13,11-16) The report indicates that NMP1 feedwater coolant
- injection function is emergency diesel backed. NMP1 is not designed to use i
diesel generators to power feedwater pumps. NMP1 CRD can be powered ,
from EDGs. Combined with the emergency condensers, this provides NMP1 I with a reliable system functionally similar to HPCI at other plants. In addition, NMP1 has a dedicated hydro power plant available along with procedures to j align it as necessary, j NMPI-3 (Page Il-19) The NUREG indicates that no details are available for NMP1 LOSP DHR sequences. LOSP DHR sequences are similar to other DHR i sequences except LOSP is the initiator. While low frequency, the dominant LOSP DHR sequences include failure to align heat removal systems, failure to align emergency condenser make-up, failure of an EDG, and failure of an emergency service water pump. The equipment failures result in a loss of service water which in tum fails RBCLC, instrument air (which fails containment venting), and shutdown cooling.
i NMPI-4 (Page 12-16) The statement relating to footnote 12.4 is based on an incorrect
. interpretation of the NMP1 IPE. The treatment of the timing of shell melt j through at NMP1 is similar to that of other plants. The footnote indicates that NMP1 is an exception in this regard and it is not. The incorrect interpretation i appears to result from a different definition of early containment failure. NMPC defines an early failure as one that occurs within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the initiator. Thus, t
the timing for Level I, II, and III considerations are based on the same reference 4
point. NMPC believes this definition provides the best input to issues relating l to accident menagement and emergency planning (i.e., timeframe for evacuation). The NUREG defines early containment failure as within a short l timeframe around RPV failure. When RPV failure occurs later in a sequence, NMPC bins any associated shell failure correspondingly. Thus, such a late 3 containment failure at NMP1 would actually be an early failure using the j NUREG definition.
! NMPI-5 (Page 13-18,13-19) The range of SLC initiation HEPs attributed to NMP1 is
- incorrect. The NUREG indicates that NMP1 SLC initiation failure probability ranges from 2E-3 per demand to IE-4 per demand. The range described in the
! NMP1 IPE is from 0.4 per demand to IE-4 per demand. In addition, the
- NUREG indicates that the IE-4 value is an exception and no obvious reasons for such a low value could be found (other BWR 1/2 licensees have SLC initiation in
- the 0.1 to 0.01 range). The 1E-4 value applies in specific ATWS sequences where the operator has previously successfully prevented MSIV closure and lowered vessel level to control power. These actions give the operators an
- expanded time window for SLC injection. Per our operator action dependency
- approach, if the operator is not successful in the preceding actions, the IE-4
, , . .m
,.w --
r n
value is not used. By considering the need for prerequisite successful operator actions in the model and the long timeframe available, the NUREG authors should find a measure of comfort in the lE-4 value. If the operator is unsuccessful at maintaining the MSIVs open, the reduced timeframe and operator dependency issues lead to a 0.4 per demand HEP for SLC initiation. Other values (e.g.,2E-3) are used under a separate top event which considers the mitigative effects of SLC injection later in the scenario. In terms of comparison with regard to the IE-4 value, it is likely that the corresponding case (i.e., MSIVs open) is binned to success or a longer term sequence by other licensees. In terms of comparison with regard to the 0.4 value, while higher than other older BWRs, the value is in the range of BWRs as a whole.
I l
l
, Draft NUREG-1560 Conunents Directly Relating to NMP2 I
I NMP2-1 (Page 4-20) The NUREG claims that nearly all the venting probability is j associated with drywell venting and presumes that this relates primarily to ,
containment flooding. This is tme only in the level II portion of the model. The )
NMP2 model includes all containment venting modes. Containment pressure control is the primary mode relative to level I logic. For level II, flood related venting is more noteworthy because either the sequence is successful in the level I model or equipment failures occur such that the pressure control mode is of
, little benefit in level II. Combustible gas venting is used for a very small number l of sequences. Thus, the statement on Page 4-20 should be revised to make it clear that drywell venting is only predominate when focusing solely on the level II portion of the NMP2 IPE model.
NMP2-2 (Page 9-34) The NUREG makes reference to a hardened containment vent to bc l installed in 1993. NMP2 has had a hardened vent since original design. 'The !
modification discussed in the IPE dealt with making the system more reliable. It was subsequently determined that the modification was not necessary.
NMP2-3 (Page Il-41) The NUREG refers to RCIC failure due to failure to over-ride a steam-tunnel temperature trip and indicates that only River Bend and Perry identify this failure mode. NMP2 includes this along with other RCIC isolation signals in Top Event OA. This top event requires operators to over-ride RCIC isolation within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of the initiator. In the NMP2 linked event tree approach, failure modes related to a given system are not always directly modeled in the system's " main" top event. In this case there are several top events that relate to !
the RCIC system.
NMP2-4 (Page I l-49) "RCIC is assumed tofail because of high temperature trips since no DHR is available" should read "RCIC is assumed tofail because of high temperature trips since no room cooling is available" l
.