Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13151A27431 December 2012Kansas Electric Power Cooperative, Inc., 2012 Annual Report
ML13151A27531 December 2012Westar Energy, 2012 Annual ReportIncorporated by reference
ML12334A31221 December 2012Issuance of Amendment No. 203, Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, to Replace Surveillance Requirement 3.6.6.8 with an Event-Based FrequencyForeign Material Exclusion
ET 12-0033, License Amendment Request (LAR) for Deviation from Fire Protection Requirements20 December 2012License Amendment Request (LAR) for Deviation from Fire Protection RequirementsHot Short
Safe Shutdown
Unanalyzed Condition
Boric Acid
Ultimate heat sink
Fire Barrier
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
Incorporated by reference
Fire Protection Program
Coast down
ML12355A69220 December 2012Summary of Public Meeting with Wolf Creek Nuclear Operating Corp Re Improved Station Performance
ML13002A41219 December 2012Evacuation Time Estimates
ML13002A03519 December 2012Response to Request for Additional Information Regarding Revision 9 to the Wolf Creek Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
WO 12-0071, Revision to a Commitment Made in Reply to Notice of Violation EA-12-13513 December 2012Revision to a Commitment Made in Reply to Notice of Violation EA-12-135
ML13151A27313 December 2012Great Plains Energy 2012 Annual ReportCyber Security
Incorporated by reference
Uranium Hexafluoride
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12347A05912 December 2012Generic Fundamentals Section of the Written Operator Licensing ExamGeneric Fundamentals Examination
ML12279A25012 December 2012Issuance of Amendment No. 202, Revise Physical Security License Condition and Change to Scope of Milestone 6 for the Cyber Security Plan Implementation ScheduleCyber Security
ML12300A30911 December 2012Issuance of Amendment No. 201, Revise TS 5.5.9, Steam Generator Program, and TS 5.6.10, Steam Generator Tube Inspection Report for a Permanent Alternate Repair CriteriaProbabilistic Risk Assessment
Nondestructive Examination
Finite Element Analysis
WO 12-0074, Operating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating.7 December 2012Operating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating.Boric Acid
Stroke time
ML12318A1455 December 2012Issuance of Amendment No. 200, Revision to Technical Specifications (TS) 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power SystemsOffsite Circuit
ML12342A25530 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-185 Through Page B-228Scaffolding
ML12342A26130 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-321 Through Page A-350
ML12342A26030 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-223 Through Page A-320Boric Acid
Scaffolding
ML12342A25930 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-113 Through Page A-222Scaffolding
ML12342A25730 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix C, Licensing Basis Evaluations Summary, Page C-1 Through EndSafe Shutdown
Boric Acid
Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Earthquake
Scaffolding
ML12342A26230 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-348 Through Page A-440Scaffolding
ML12342A25430 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-151 Through Page B-184Scaffolding
ML12342A25330 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Cover Through Appendix a, Seismic Walkdown Checklists (Swcs) Page A-112Safe Shutdown
Unanalyzed Condition
Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML12342A25130 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-101 Through Page B-150Scaffolding
ML12342A25030 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-51 Through Page B-100Scaffolding
ET 12-0032, WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-1 Through Page B-5030 November 2012WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-1 Through Page B-50Boric Acid
Scaffolding
ML12340A39830 November 2012PEUS-WR-12-5, Revision 1, Wolf Creek Nuclear Operating Corporation Post Fukushima Flooding Walkdown ReportUnanalyzed Condition
Ultimate heat sink
Hydrostatic
Functionality Assessment
Fukushima Dai-Ichi
Earthquake
Press Release-IV-12-052, NRC to Meet with Wolf Creek Nuclear Operating Co29 November 2012Press Release-IV-12-052: NRC to Meet with Wolf Creek Nuclear Operating Co
ML12340A02329 November 2012LTR-12-0737 - E-mail, Ryan Tracy Note from the Wall Street Journal Regarding Transparency in the Nrc'S Communications
ET 12-0031, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.3 (Flooding) of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.3 (Flooding) of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML12342A25227 November 2012Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 (Seismic) of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML12328A07723 November 2012Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss an Update on the Initiatives Being Implemented to Improve Station Performance
TAC:MF030921 November 2012
WO 12-0066, License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System.21 November 2012License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System.Stroke time
Pressure and Temperature Limits Report
ML12289A89619 November 2012Issuance of Amendment No. 199, Request to Adopt Technical Specification Task Force Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies Using Consolidated Line Item Improvement ProcessAnticipated operational occurrence
Nondestructive Examination
ML12321A30916 November 2012Acceptance Review for License Amendment Request, Revise Paragraph 2.C(5)(a) of Facility Operating License NPF-42 and the Updated Safety Analysis Report for a Deviation from Appendix R for Volume Control Tank Outlet ValvesFire Protection Program
IR 05000482/20120049 November 2012IR 05000482-12-004; Wolf Creek Nuclear Operating Corporation; 06/30/2012 - 09/28/2012; Wolf Creek Generating Station, Integrated Inspection ReportSafe Shutdown
High Radiation Area
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Biofouling
Fire Protection Program
Substantial potential for overexposure
Substantial potential for an overexposure
GOTHIC
Siren
Overexposure
ML12326A9896 November 2012Transmittal of a Copy of the Final Report for the October 3, 2012 Medical Services Drill of the Offsite Radiological Emergency Response Plans
ML12300A3225 November 2012Redacted Letter Only, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660)
ML12276A2651 November 2012Meeting Summary with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Analysis at Wolf CreekSafe Shutdown
ML13002A41431 October 2012Final Report, Kld TR-522, Rev. 1, Development of Evacuation Time Estimates, Cover Through Page 5-22
TAC:MF004431 October 2012
ML13002A42131 October 2012Final Report, Kld TR-522, Rev. 1, Development of Evacuation Time Estimates, Appendix H-55 Through End
ML13002A41631 October 2012Final Report, Kld TR-522, Rev. 1, Development of Evacuation Time Estimates, Appendix D Through Appendix H-54
ML13002A41531 October 2012Final Report, Kld TR-522, Rev. 1, Development of Evacuation Time Estimates, Page 6-1 Through Appendix C-16
WM 12-0041, Operating Corporation - Submittal of Emergency Preparedness Communications Assessment Results in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3.31 October 2012Operating Corporation - Submittal of Emergency Preparedness Communications Assessment Results in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3.
ET 12-0028, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)29 October 2012Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ET 12-0029, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)29 October 2012Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)FLEX
IR 05000482/201240425 October 2012IR 05000482-12-404, 09/13/2012, Wolf Creek Generating Station - NRC Security InspectionAffidavit