Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13007A09931 December 2012Annual Letter - Generic Fundamentals Examination (GFE) Section for Region IIGeneric Fundamentals Examination
TAC:ME999621 December 2012
ML12355A65921 December 2012Nuclear Generating Plant - RAI 9.3 of the Near-Term Task Force Fukushima Dai-ichi..Fukushima Dai-Ichi
ML13002A02921 December 2012Tennessee Valley Authority, Part 21 Report - Belden Wire Used on Environmentally Qualified Form-Wound Motors Not Fully Qualified
ML12333A08919 December 2012Request for Additional Information for Extended Power Uprate License Amendment RequestAnticipated operational occurrence
Fuel cladding
Power Uprate
3F1212-08, Response to Third Request for Additional Information to Support NRC Vessels and Internals Integrity Branch (Evib) Technical Review of the CR-3 Extended Power Uprate LAR18 December 2012Response to Third Request for Additional Information to Support NRC Vessels and Internals Integrity Branch (Evib) Technical Review of the CR-3 Extended Power Uprate LARHydrostatic
Aging Management
Power Uprate
ML12339A06718 December 2012Issuance of License Amendments Regarding Cyber SecuritySafe Shutdown
Cyber Security
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
3F1212-06, CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review18 December 2012CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical ReviewSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Fuel cladding
Offsite Circuit
Power Uprate
ML12362A09817 December 2012Submittal of Evacuation Time Estimates Report
ML12362A09917 December 2012Evacuation Time Estimates Report, Appendix E, Facility Data, Part 3 of 3
ML12362A10017 December 2012Evacuation Time Estimates Report, Development of Evacuation Time Estimates, Part 1 of 3Siren
3F1212-02, Evacuation Time Estimates Report, Estimation of Trip Generation Time, Part 2 of 317 December 2012Evacuation Time Estimates Report, Estimation of Trip Generation Time, Part 2 of 3Siren
ML13022A49613 December 2012Comment (248) of Deb Brown on Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
3F1212-07, Response to Request for Additional Information for Changes to Security Plan10 December 2012Response to Request for Additional Information for Changes to Security PlanSafeguards Contingency Plan
3F1212-03, Response to Request for Additional Information Regarding 10 CFR 50.46 Notification of Change in Peak Cladding Temperature for Large Break Loss of Coolant Accident Analysis10 December 2012Response to Request for Additional Information Regarding 10 CFR 50.46 Notification of Change in Peak Cladding Temperature for Large Break Loss of Coolant Accident Analysis
IR 05000302/20125027 December 2012IR 05000302-12-502; 11/12/2012 - 11/16/2012; Crystal River Unit 3; Baseline Inspection
ML12361A0236 December 2012Plant Operating Manual CH-631, Rev. 9., Post Accident Sampling and Analysis of Reactor Building Vent, Auxiliary Building Vent, and Reactor Building Atmosphere.Grab sample
ML12346A0114 December 2012License Renewal Application 10 CFR Part 54.21(b) Annual UpdateLicense Renewal
Power Uprate
TAC:MF030829 November 2012
ML12334A39522 November 2012Comment (99) of Steve Shuput on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor OperationEarthquake
ML12334A38721 November 2012Comment (91) of Kenneth Clark on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor Operation
3F1112-04, Revisions to the Radiological Emergency Response Plan Implementing Procedures21 November 2012Revisions to the Radiological Emergency Response Plan Implementing ProceduresSafe Shutdown
Unanalyzed Condition
Boric Acid
Fitness for Duty
Health Physics Network
High winds
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Internal Flooding
Met Tower
Operating Basis Earthquake
Cyber Security
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
Siren
Manual Operator Action
3F1112-06, Response to Recommendation 2.3, Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident21 November 2012Response to Recommendation 2.3, Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi AccidentSafe Shutdown
Unanalyzed Condition
Boric Acid
Loop seal
High Radiation Area
Ultimate heat sink
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
Commercial Grade
Scaffolding
3F1112-05, Response to Recommendation 2.3, Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident21 November 2012Response to Recommendation 2.3, Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi AccidentSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Internal Flooding
Hydrostatic
Fukushima Dai-Ichi
ML12307A12820 November 201211/1/12 Summary of Meeting with Duke Energy Concerning Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Plan for Crystal River Unit 3 Generating Plant
ML12325A93819 November 2012Bypass Fiber Quantity Test Plan
ML12310A29115 November 2012Request for Additional Information for Changes to Security PlanSafeguards Contingency Plan
3F1112-03, 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report15 November 201210 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report
3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan7 November 2012Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan
ML12314A3907 November 2012Extended Power Uprate LAR Supplement to Support NRC Instrumentation and Controls Branch Technical ReviewPower Uprate
TAC:ME46781 November 2012
ML12305A2751 November 201211/1/12 Meeting Presentation - Regarding GSI-191 Strainer Fiber Bypass Test Plan on November 1, 2012 for Crystal River 3 Generating Plant
ML12307A3541 November 2012Confirmation of Requested Initial Operator License Examinations for Crystal River Nuclear Plant
TAC:MF000631 October 2012
3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 25031 October 201217877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250
ML12314A39331 October 201217877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250
ML12314A39231 October 201217877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250Mission time
Post Accident Monitoring
Power Uprate
RA-12-038, Florida Power Corp.'S Response to Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54 (F) Recommendations 2.1, 2.3, & 9.3 of Near Term Force Review of Insights from Fukushima Dai-Ichi...31 October 2012Florida Power Corp.'S Response to Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54 (F) Recommendations 2.1, 2.3, & 9.3 of Near Term Force Review of Insights from Fukushima Dai-Ichi...Fukushima Dai-Ichi
IR 05000302/201240430 October 2012Nuclear Generating Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000302-12-404Affidavit
RA-12-041, Carolina Power & Light Company and Florida Power Corporation'S Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number29 October 2012Carolina Power & Light Company and Florida Power Corporation'S Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number ESpent Fuel Pool Instrumentation
RA-12-039, Carolina Power & Light Company & Florida Power Corporation'S Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Eve29 October 2012Carolina Power & Light Company & Florida Power Corporation'S Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EvenFLEX
TAC:MF180229 October 2012
ML12304A06826 October 2012NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408)
ML12300A40326 October 201211/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External EventsFLEX
ML12310A43725 October 2012Plant Operating Manual CH-631, Revision 007 to Post Accident Sampling and Analysis of Reactor Building Vent, Auxiliary Building Vent, and Reactor Building Atmosphere.Grab sample
IR 05000302/201200424 October 2012IR 05000302-12-004, 07/01/2012 - 09/30/2012, Crystal River Unit 3; Routine Integrated ReportFire Barrier
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Fukushima Dai-Ichi
Significance Determination Process
Foreign Material Exclusion
Fire Protection Program
3F1012-08, Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System24 October 2012Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power SystemOffsite Circuit
ML12297A39223 October 2012NRR E-mail Capture - Draft Bypass Test Plan