Issue date | Title | Topic | |
---|---|---|---|
ML13007A099 | 31 December 2012 | Annual Letter - Generic Fundamentals Examination (GFE) Section for Region II | Generic Fundamentals Examination |
TAC:ME9996 | 21 December 2012 | ||
ML12355A659 | 21 December 2012 | Nuclear Generating Plant - RAI 9.3 of the Near-Term Task Force Fukushima Dai-ichi.. | Fukushima Dai-Ichi |
ML13002A029 | 21 December 2012 | Tennessee Valley Authority, Part 21 Report - Belden Wire Used on Environmentally Qualified Form-Wound Motors Not Fully Qualified | |
ML12333A089 | 19 December 2012 | Request for Additional Information for Extended Power Uprate License Amendment Request | Anticipated operational occurrence Fuel cladding Power Uprate |
3F1212-08, Response to Third Request for Additional Information to Support NRC Vessels and Internals Integrity Branch (Evib) Technical Review of the CR-3 Extended Power Uprate LAR | 18 December 2012 | Response to Third Request for Additional Information to Support NRC Vessels and Internals Integrity Branch (Evib) Technical Review of the CR-3 Extended Power Uprate LAR | Hydrostatic Aging Management Power Uprate |
ML12339A067 | 18 December 2012 | Issuance of License Amendments Regarding Cyber Security | Safe Shutdown Cyber Security Safeguards Contingency Plan Offsite Circuit Fire Protection Program |
3F1212-06, CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review | 18 December 2012 | CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Fuel cladding Offsite Circuit Power Uprate |
ML12362A098 | 17 December 2012 | Submittal of Evacuation Time Estimates Report | |
ML12362A099 | 17 December 2012 | Evacuation Time Estimates Report, Appendix E, Facility Data, Part 3 of 3 | |
ML12362A100 | 17 December 2012 | Evacuation Time Estimates Report, Development of Evacuation Time Estimates, Part 1 of 3 | Siren |
3F1212-02, Evacuation Time Estimates Report, Estimation of Trip Generation Time, Part 2 of 3 | 17 December 2012 | Evacuation Time Estimates Report, Estimation of Trip Generation Time, Part 2 of 3 | Siren |
ML13022A496 | 13 December 2012 | Comment (248) of Deb Brown on Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
3F1212-07, Response to Request for Additional Information for Changes to Security Plan | 10 December 2012 | Response to Request for Additional Information for Changes to Security Plan | Safeguards Contingency Plan |
3F1212-03, Response to Request for Additional Information Regarding 10 CFR 50.46 Notification of Change in Peak Cladding Temperature for Large Break Loss of Coolant Accident Analysis | 10 December 2012 | Response to Request for Additional Information Regarding 10 CFR 50.46 Notification of Change in Peak Cladding Temperature for Large Break Loss of Coolant Accident Analysis | |
IR 05000302/2012502 | 7 December 2012 | IR 05000302-12-502; 11/12/2012 - 11/16/2012; Crystal River Unit 3; Baseline Inspection | |
ML12361A023 | 6 December 2012 | Plant Operating Manual CH-631, Rev. 9., Post Accident Sampling and Analysis of Reactor Building Vent, Auxiliary Building Vent, and Reactor Building Atmosphere. | Grab sample |
ML12346A011 | 4 December 2012 | License Renewal Application 10 CFR Part 54.21(b) Annual Update | License Renewal Power Uprate |
TAC:MF0308 | 29 November 2012 | ||
ML12334A395 | 22 November 2012 | Comment (99) of Steve Shuput on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor Operation | Earthquake |
ML12334A387 | 21 November 2012 | Comment (91) of Kenneth Clark on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor Operation | |
3F1112-04, Revisions to the Radiological Emergency Response Plan Implementing Procedures | 21 November 2012 | Revisions to the Radiological Emergency Response Plan Implementing Procedures | Safe Shutdown Unanalyzed Condition Boric Acid Fitness for Duty Health Physics Network High winds Shutdown Margin Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Internal Flooding Met Tower Operating Basis Earthquake Cyber Security Safeguards Contingency Plan Earthquake Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Fire Protection Program Unidentified leakage Siren Manual Operator Action |
3F1112-06, Response to Recommendation 2.3, Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | 21 November 2012 | Response to Recommendation 2.3, Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | Safe Shutdown Unanalyzed Condition Boric Acid Loop seal High Radiation Area Ultimate heat sink Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake Commercial Grade Scaffolding |
3F1112-05, Response to Recommendation 2.3, Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | 21 November 2012 | Response to Recommendation 2.3, Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | Safe Shutdown Unanalyzed Condition Ultimate heat sink Internal Flooding Hydrostatic Fukushima Dai-Ichi |
ML12307A128 | 20 November 2012 | 11/1/12 Summary of Meeting with Duke Energy Concerning Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Plan for Crystal River Unit 3 Generating Plant | |
ML12325A938 | 19 November 2012 | Bypass Fiber Quantity Test Plan | |
ML12310A291 | 15 November 2012 | Request for Additional Information for Changes to Security Plan | Safeguards Contingency Plan |
3F1112-03, 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report | 15 November 2012 | 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report | |
3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan | 7 November 2012 | Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan | |
ML12314A390 | 7 November 2012 | Extended Power Uprate LAR Supplement to Support NRC Instrumentation and Controls Branch Technical Review | Power Uprate |
TAC:ME4678 | 1 November 2012 | ||
ML12305A275 | 1 November 2012 | 11/1/12 Meeting Presentation - Regarding GSI-191 Strainer Fiber Bypass Test Plan on November 1, 2012 for Crystal River 3 Generating Plant | |
ML12307A354 | 1 November 2012 | Confirmation of Requested Initial Operator License Examinations for Crystal River Nuclear Plant | |
TAC:MF0006 | 31 October 2012 | ||
3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 | 31 October 2012 | 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 | |
ML12314A393 | 31 October 2012 | 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 | |
ML12314A392 | 31 October 2012 | 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 | Mission time Post Accident Monitoring Power Uprate |
RA-12-038, Florida Power Corp.'S Response to Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54 (F) Recommendations 2.1, 2.3, & 9.3 of Near Term Force Review of Insights from Fukushima Dai-Ichi... | 31 October 2012 | Florida Power Corp.'S Response to Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54 (F) Recommendations 2.1, 2.3, & 9.3 of Near Term Force Review of Insights from Fukushima Dai-Ichi... | Fukushima Dai-Ichi |
IR 05000302/2012404 | 30 October 2012 | Nuclear Generating Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000302-12-404 | Affidavit |
RA-12-041, Carolina Power & Light Company and Florida Power Corporation'S Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number | 29 October 2012 | Carolina Power & Light Company and Florida Power Corporation'S Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number E | Spent Fuel Pool Instrumentation |
RA-12-039, Carolina Power & Light Company & Florida Power Corporation'S Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Eve | 29 October 2012 | Carolina Power & Light Company & Florida Power Corporation'S Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Even | FLEX |
TAC:MF1802 | 29 October 2012 | ||
ML12304A068 | 26 October 2012 | NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) | |
ML12300A403 | 26 October 2012 | 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events | FLEX |
ML12310A437 | 25 October 2012 | Plant Operating Manual CH-631, Revision 007 to Post Accident Sampling and Analysis of Reactor Building Vent, Auxiliary Building Vent, and Reactor Building Atmosphere. | Grab sample |
IR 05000302/2012004 | 24 October 2012 | IR 05000302-12-004, 07/01/2012 - 09/30/2012, Crystal River Unit 3; Routine Integrated Report | Fire Barrier Internal Flooding Probabilistic Risk Assessment Temporary Modification Fukushima Dai-Ichi Significance Determination Process Foreign Material Exclusion Fire Protection Program |
3F1012-08, Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System | 24 October 2012 | Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System | Offsite Circuit |
ML12297A392 | 23 October 2012 | NRR E-mail Capture - Draft Bypass Test Plan |