Bypass Fiber Quantity Test Plan
ML12325A938
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/19/2012
From: Franke J
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
3F1112-01, GSI-191
Download: ML12325A938 (47)


Text

Duke Energy@

Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref. 10 CFR 50.54(f)

November 19, 2012 3Fl 112-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Bypass Fiber Quantity Test Plan

Reference:

"Meeting Presentation - Regarding GSI-191 Strainer Fiber Bypass Test Plan on November 1, 2012 for Crystal River 3 Generating Plant." (Accession No. ML12305A275)

Dear Sir:

On October 23, 2012, Crystal River Unit 3 (CR-3) transmitted to the NRC staff, via electronic mail, a draft of the "CR-3 Bypass Fiber Quantity Test Plan." The Plan provides for a consistent and uniform set of considerations for the performance of strainer bypass testing. Testing will determine a maximum mass quantity of fibrous debris bypass that will bound a set of conditions specific to CR-3.

The output from strainer bypass testing will be used to perform in-vessel downstream effects analysis as part of demonstrating compliance with Generic Safety Issue (GSI)- 191, "Assessment of Debris Accumulation on PWR Sump Performance" requirements.

On October 26, 2012, via electronic mail, the NRC provided questions to obtain additional information necessary to support the technical review of the Bypass Fiber Quantity Test Plan.

By a teleconference call on November 1, 2012, CR-3 discussed each question and provided answers to the NRC, as described in the reference above.

No additional questions were identified during the conference call. This letter provides the revised Plan.

This correspondence contains no new regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs at (352) 563-4796.

Sincerely,

,,?ice President C

Crystal River Nuclear Plant JAF/sam

Attachment:

Bypass Fiber Quantity Test Plan xc:

NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

U. S. Nuclear Regulatory Commission Page 2 of 2 3F 1112-01 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

J Franke ice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this i

day of 2012, by Jon A. Franke.

Signature of Notary Public State of Florida CARROLYN E.

RTMANNI o."

mmission # DD 937553 t Expires March 1, 2014 (Print, type, or stamp Commissioned Name of Notary Public)

Personally V/

Produced Known

-OR-Identification

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 ATTACHMENT Bypass Fiber Quantity Test Plan