Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
Press Release-08-234, NRC Announces Availability of License Renewal Application for Palo Verde Nuclear Generating Station24 December 2008Press Release-08-234: NRC Announces Availability of License Renewal Application for Palo Verde Nuclear Generating Station
ML08358022523 December 2008Summary of Public Meeting with Arizona Public Service Company
TAC:MD833316 December 2008
ML08344038116 December 2008Discovery and Correction of Errors in Westinghouse Calculation
ML08343054916 December 2008Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water ReactorsMission time
Foreign Material Exclusion
Press Release-IV-08-043, NRC to Hold Public Meeting on Palo Verde Nuclear Generating Station12 December 2008Press Release-IV-08-043: NRC to Hold Public Meeting on Palo Verde Nuclear Generating Station
ML08351061211 December 2008License Renewal Application, Part 1 of 3Safe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Aging Management
Moisture barrier
Earthquake
Fire Protection Program
Flow Induced Vibration
TAC:ME026111 December 2008
ML08351061111 December 2008License Renewal Application - Cover Letter
ML08351061511 December 2008License Renewal Application, Part 3 of 3
ML08351061411 December 2008License Renewal Application, Part 2 of 3
ML08354056010 December 2008Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX055
ML09155033810 December 2008December 10, 2008, Letter from R. Bement, APS, to E. Collins, USNRC, Senior Operator License Application, Palo Verde Nuclear Generating Station, Units 1, 2, and 3. (Redacted)Job Performance Measure
ML12261A3889 December 2008Memorandum, OI Case No. 4-2009-005F
ML0833907364 December 2008Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
ML0832309373 December 2008Extension Request for Submittal of the Revised Supplemental Response to Generic Letter 2004-02
ML0835003663 December 2008Confirmatory Order Action Completion
ML0833705662 December 2008Ltr to Aubrey Godwin, Director, Arizona Radiation Regulatory Agency from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008
ML0833705752 December 2008Ltr to Louis B. Trammell, Director, Arizona Division of Emergency Management from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008
ML0833705722 December 2008Ltr to Warren Leek, Director, Maricopa County Department of Emergency Management from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008
ML0833703402 December 2008Ltr to Randall K. Edington, Exec VP, Nuclear/Cno from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008
ML08333017321 November 2008PV-2008-11-Post-Examination Comments and Analysis
ML08330055018 November 2008Submittal of Security, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 9Fitness for Duty
ML09014009114 November 20082008-11- Public Forms
ML08337016314 November 2008Response to Request for Additional Information - Relief Request 38Liquid penetrant
ML08336055414 November 20082008-11 - Final - OutlinesSevere Accident Management Guideline
Downpower
ML08336043714 November 20082008-11 - Draft Operating Test CommentsDownpower
ML08336035514 November 20082008-11-DRAFT-Operating ExaminationBoric Acid
Shutdown Margin
High Radiation Area
Job Performance Measure
Power change
Downpower
ML08336025714 November 20082008-11 - Draft - Written Examination Comments
ML08336025214 November 20082008-11 - Draft - Written Examination (RO and SRO)Stroke time
Time to boil
Power change
ML08336019914 November 2008PV-2008-11-Draft Outline Comments
ML08333050914 November 20082008-11 - Draft - OutlinesSevere Accident Management Guideline
Downpower
ML08333012614 November 2008PV-2008-11-Final-Written ExamShutdown Margin
Stroke time
Time to boil
Post Accident Monitoring
Fuel cladding
Power change
ML08325034614 November 2008E-Mail Response Re Licensee'S Request for Extension to Revised Supplemental Response to Generic Letter 2004-02
ML08337016214 November 2008Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Notification and Concurrence of Extension for Submittal of the Revised Supplemental Response to NRC Generic Letter 2004-02
ML08337016113 November 2008Request for Amendments to Technical Specification 3.5.5, Refueling Water Tank, to Increase RWT Minimum Water Level Units for 1 & 3, and Incorporate Editorial Changes for Units 1, 2, & 3Boric Acid
Shutdown Margin
Anticipated operational occurrence
IR 05000528/200800412 November 2008IR 05000528-08-004, 05000529-08-004, and 05000530-08-004 on 07/01/08 - 09/30/08 for Palo VerdeUnanalyzed Condition
Ultimate heat sink
Mission time
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
Scaffolding
Grace period
Downpower
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML08301057210 November 2008Relief Request Nos. 18 and 36, Proposed Alternatives for the Third Interval 10-Year Inservice Inspection Program IntervalNon-Destructive Examination
Weld Overlay
Probabilistic Risk Assessment
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
DM weld
Scaffolding
ML08333015510 November 2008PV-2008-11-Final-Operating TestBoric Acid
Shutdown Margin
High Radiation Area
Job Performance Measure
Power change
Downpower
ML0831108775 November 2008NRC Initial Operator Licensing Examination Approval, 05000528-08-301; 05000529-08-301; 05000530-08-301
IR 05000528/20083015 November 2008NRC Initial Operator Licensing Examination Approval, 05000528-08-301; 05000529-08-301; 05000530-08-301
ML0832905425 November 2008Secondary Financial Protection Licensee Guaranteed Payment of Deferred Premium NRC 10 C.F.R. 140.21(e)High winds
Incorporated by reference
IR 05000528/20080063 November 2008IR 05000528-08-006, IR 5000529-08-006, and IR 05000530-08-006, on 10/28/2008, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies Temporary Instruction InspecB.5.b
ML0830802873 November 2008Acceptance Review of Application to Modify Technical Specification 5.5.16, Containment Leakage Rate Testing Program, Risk-Informed
ML0830805383 November 2008IR 05000528-08-006, IR 5000529-08-006, and IR 05000530-08-006, on 10/28/2008, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies Temporary Instruction InspecB.5.b Mitigating Strategies
TAC:MD98073 November 2008
ML08310036729 October 2008Submittal of 2007 Annual Financial Reports
ML08310012328 October 2008Steam Generator Tube Inspection Report
ML08295029928 October 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients