Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
Press Release-08-234, NRC Announces Availability of License Renewal Application for Palo Verde Nuclear Generating Station | 24 December 2008 | Press Release-08-234: NRC Announces Availability of License Renewal Application for Palo Verde Nuclear Generating Station | |
ML083580225 | 23 December 2008 | Summary of Public Meeting with Arizona Public Service Company | |
TAC:MD8333 | 16 December 2008 | ||
ML083440381 | 16 December 2008 | Discovery and Correction of Errors in Westinghouse Calculation | |
ML083430549 | 16 December 2008 | Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | Mission time Foreign Material Exclusion |
Press Release-IV-08-043, NRC to Hold Public Meeting on Palo Verde Nuclear Generating Station | 12 December 2008 | Press Release-IV-08-043: NRC to Hold Public Meeting on Palo Verde Nuclear Generating Station | |
ML083510612 | 11 December 2008 | License Renewal Application, Part 1 of 3 | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Emergency Lighting Aging Management Moisture barrier Earthquake Fire Protection Program Flow Induced Vibration |
TAC:ME0261 | 11 December 2008 | ||
ML083510611 | 11 December 2008 | License Renewal Application - Cover Letter | |
ML083510615 | 11 December 2008 | License Renewal Application, Part 3 of 3 | |
ML083510614 | 11 December 2008 | License Renewal Application, Part 2 of 3 | |
ML083540560 | 10 December 2008 | Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX055 | |
ML091550338 | 10 December 2008 | December 10, 2008, Letter from R. Bement, APS, to E. Collins, USNRC, Senior Operator License Application, Palo Verde Nuclear Generating Station, Units 1, 2, and 3. (Redacted) | Job Performance Measure |
ML12261A388 | 9 December 2008 | Memorandum, OI Case No. 4-2009-005F | |
ML083390736 | 4 December 2008 | Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan | |
ML083230937 | 3 December 2008 | Extension Request for Submittal of the Revised Supplemental Response to Generic Letter 2004-02 | |
ML083500366 | 3 December 2008 | Confirmatory Order Action Completion | |
ML083370566 | 2 December 2008 | Ltr to Aubrey Godwin, Director, Arizona Radiation Regulatory Agency from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008 | |
ML083370575 | 2 December 2008 | Ltr to Louis B. Trammell, Director, Arizona Division of Emergency Management from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008 | |
ML083370572 | 2 December 2008 | Ltr to Warren Leek, Director, Maricopa County Department of Emergency Management from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008 | |
ML083370340 | 2 December 2008 | Ltr to Randall K. Edington, Exec VP, Nuclear/Cno from Linda L. Howell, Chief, Rcb, NRC Participation in the Palo Verde Evaluated Exercise on March 4, 2009, 12/02/2008 | |
ML083330173 | 21 November 2008 | PV-2008-11-Post-Examination Comments and Analysis | |
ML083300550 | 18 November 2008 | Submittal of Security, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 9 | Fitness for Duty |
ML090140091 | 14 November 2008 | 2008-11- Public Forms | |
ML083370163 | 14 November 2008 | Response to Request for Additional Information - Relief Request 38 | Liquid penetrant |
ML083360554 | 14 November 2008 | 2008-11 - Final - Outlines | Severe Accident Management Guideline Downpower |
ML083360437 | 14 November 2008 | 2008-11 - Draft Operating Test Comments | Downpower |
ML083360355 | 14 November 2008 | 2008-11-DRAFT-Operating Examination | Boric Acid Shutdown Margin High Radiation Area Job Performance Measure Power change Downpower |
ML083360257 | 14 November 2008 | 2008-11 - Draft - Written Examination Comments | |
ML083360252 | 14 November 2008 | 2008-11 - Draft - Written Examination (RO and SRO) | Stroke time Time to boil Power change |
ML083360199 | 14 November 2008 | PV-2008-11-Draft Outline Comments | |
ML083330509 | 14 November 2008 | 2008-11 - Draft - Outlines | Severe Accident Management Guideline Downpower |
ML083330126 | 14 November 2008 | PV-2008-11-Final-Written Exam | Shutdown Margin Stroke time Time to boil Post Accident Monitoring Fuel cladding Power change |
ML083250346 | 14 November 2008 | E-Mail Response Re Licensee'S Request for Extension to Revised Supplemental Response to Generic Letter 2004-02 | |
ML083370162 | 14 November 2008 | Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Notification and Concurrence of Extension for Submittal of the Revised Supplemental Response to NRC Generic Letter 2004-02 | |
ML083370161 | 13 November 2008 | Request for Amendments to Technical Specification 3.5.5, Refueling Water Tank, to Increase RWT Minimum Water Level Units for 1 & 3, and Incorporate Editorial Changes for Units 1, 2, & 3 | Boric Acid Shutdown Margin Anticipated operational occurrence |
IR 05000528/2008004 | 12 November 2008 | IR 05000528-08-004, 05000529-08-004, and 05000530-08-004 on 07/01/08 - 09/30/08 for Palo Verde | Unanalyzed Condition Ultimate heat sink Mission time Tornado Missile Internal Flooding Hydrostatic Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program Scaffolding Grace period Downpower |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML083010572 | 10 November 2008 | Relief Request Nos. 18 and 36, Proposed Alternatives for the Third Interval 10-Year Inservice Inspection Program Interval | Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Liquid penetrant Through-Wall Leak Dissimilar Metal Weld DM weld Scaffolding |
ML083330155 | 10 November 2008 | PV-2008-11-Final-Operating Test | Boric Acid Shutdown Margin High Radiation Area Job Performance Measure Power change Downpower |
ML083110877 | 5 November 2008 | NRC Initial Operator Licensing Examination Approval, 05000528-08-301; 05000529-08-301; 05000530-08-301 | |
IR 05000528/2008301 | 5 November 2008 | NRC Initial Operator Licensing Examination Approval, 05000528-08-301; 05000529-08-301; 05000530-08-301 | |
ML083290542 | 5 November 2008 | Secondary Financial Protection Licensee Guaranteed Payment of Deferred Premium NRC 10 C.F.R. 140.21(e) | High winds Incorporated by reference |
IR 05000528/2008006 | 3 November 2008 | IR 05000528-08-006, IR 5000529-08-006, and IR 05000530-08-006, on 10/28/2008, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies Temporary Instruction Inspec | B.5.b |
ML083080287 | 3 November 2008 | Acceptance Review of Application to Modify Technical Specification 5.5.16, Containment Leakage Rate Testing Program, Risk-Informed | |
ML083080538 | 3 November 2008 | IR 05000528-08-006, IR 5000529-08-006, and IR 05000530-08-006, on 10/28/2008, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies Temporary Instruction Inspec | B.5.b Mitigating Strategies |
TAC:MD9807 | 3 November 2008 | ||
ML083100367 | 29 October 2008 | Submittal of 2007 Annual Financial Reports | |
ML083100123 | 28 October 2008 | Steam Generator Tube Inspection Report | |
ML082950299 | 28 October 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients |