ML083300550
| ML083300550 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/18/2008 |
| From: | Mims D Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-05928-DCM/DFH | |
| Download: ML083300550 (2) | |
Text
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED 10 CFR 50.54(p)
ANN A subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-05928-DCM/DFH November 18, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 and 72-44 License No. NPF-41; NPF-51; NPF-74 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 9
Dear Sirs:
Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 9 of the Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, (hereafter the Plan) which realigns the Fitness for Duty responsibilities under the Access Authorization Section Leader.
APS has evaluated the Plan changes in accordance With 10 CFR 50.54(p) and concluded that the revision does not result in a decrease in the effectiveness of the Plan.
Arizona Public Service Company makes no commitments in this letter.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak 0 Diablo Canyon
- Palo Verde
- South Texas Project
- San Onofree Wolf Creek ENCLOSURE(S) CONTAIN(S)
J170 SAFEGUARDS INFORMATION 4(
UPON SEPARATION THIS PAGE IS DECONTROLLED
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED U.S. Nuclear Regulatory Commission PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 9 Page 2 The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Should you have questions concerning this matter, please contact Charles H. Coles, Department Leader, Security Operations at 623-393-2736.
Sincerely, aC DCM/TNW/JAP/DFH/gt
Enclosures:
- 1) Revision 9 of the Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program
- 2) 10 CFR 50.54(p) Evaluation
- 3) 10 CFR 50.54(p) Table of Changes cc:
E. E. Collins Region IV Administrator (w/o enclosures)
B. K. Singal PVNGS Project Manager (w/o enclosures)
D. A. Holman, Sr. Physical Security Inspector, RIV/DRS/PSB (w/o enclosures)
R. I. Treadway Sr. Resident Inspector (w/o enclosures)
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED