MONTHYEARML0515202672005-06-0202 June 2005 6/2/05, Palo Verde, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603903502006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4702, MC4703, and M4704) Project stage: RAI ML0833701622008-11-14014 November 2008 Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Notification and Concurrence of Extension for Submittal of the Revised Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request ML0832503462008-11-14014 November 2008 E-Mail Response Re Licensee'S Request for Extension to Revised Supplemental Response to Generic Letter 2004-02 Project stage: Other ML0832309372008-12-0303 December 2008 Extension Request for Submittal of the Revised Supplemental Response to Generic Letter 2004-02 Project stage: Other ML0834305492008-12-16016 December 2008 Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Project stage: Meeting ML15239B3222015-09-0909 September 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML15268A1312015-10-0505 October 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML15348A0542015-12-15015 December 2015 Slides for December 17, 2015 Public Meeting with APS on Resolution of GL 2004-02 Project stage: Meeting 2008-12-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 3, 2008 Mr. Randall K. Edington Executive Vice President Nuclear!
Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 EXTENSION REQUEST FOR SUBMITTAL OF THE REVISED SUPPLEMENTAL RESPONSE TO GENERIC LETTER 2004-02 (TAC NOS. MC4702, MC4703, AND MC4704)
Dear Mr. Edington:
By letter dated November 14, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083370162), Arizona Public Service Company (APS) requested an extension related to the Revised Supplemental Response to Generic Letter (GL) 2004-02 concerning Palo Verde Nuclear Generating Station, Units 1,2, and 3. The U.S. Nuclear Regulatory Commission (NRC) was requested to extend the response date to December 19, 2008.
This request was discussed on the phone between me, Donnie Harrison of NRC, and Russell Stroud of your staff on November 14, 2008. You were notified via email on November 14, 2008 (ADAMS Accession No. ML083250346), th.at NRC accepted the request for extension. The purpose of this letter is to inform you that your request for extension to provide the revised supplemental response to GL 2004-02 by December 19, 2008, is approved.
If you have any questions, please contact me at (301) 415-3016.
Sincerely, f, '"' \W~ J - LS,,,,,\~
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530 cc: Distribution via Listserv
December 3, 2008 Mr. Randall K. Edington Executive Vice President Nuclear/
Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND 3 EXTENSION REQUEST FOR SUBMITTAL OF THE REVISED SUPPLEMENTAL RESPONSE TO GENERIC LETTER 2004-02 (TAC NOS. MC4702, MC4703, AND MC4704)
Dear Mr. Edington:
By letter dated November 14, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083370162), Arizona Public Service Company (APS) requested an extension related to the Revised Supplemental Response to Generic Letter (GL) 2004-02 concerning Palo Verde Nuclear Generating Station, Units 1,2, and 3. The U.S. Nuclear Regulatory Commission (NRC) was requested to extend the response date to December 19, 2008.
This request was discussed on the phone between me, Donnie Harrison of NRC, and Russell Stroud of your staff on November 14, 2008. You were notified via email on November 14,2008 (ADAMS Accession No. ML083250346), that NRC accepted the request for extension. The purpose of this letter is to inform you that your request for extension to provide the revised supplemental response to GL 2004-02 by December 19, 2008, is approved.
If you have any questions, please contact me at (301) 415-3016.
Sincerely, IRAI Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl4 Resource RidsOgcRp Resource LPLIV r/f RidsNrrPMPaloVerde Resource RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource RidsNrrDssSsib Resource ADAMS Accession No. ML083230937 Ir i~...,.a..J- V{A Q.~l OFFICE NRRlLPL4/PM NRR/LPL4/LA NRRISSIB/BC NRR/LPL4/BC NRR/LPL4/PM NAME BSingal <:....,'L:\ JBurkhardt pP/ DHarrison
- MMarkley ~lA... BSingal fl..,~
{1,.-( '2- ( 1> i v
, \.,~
,'-\a. 11-1 ~-o'is'" 1.l.-3~
DATE 12/2/08 8' OFFICIAL RECORD COpy