ML083360199
| ML083360199 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/14/2008 |
| From: | Mckernon T NRC Region 4 |
| To: | |
| References | |
| Download: ML083360199 (1) | |
Text
Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility:
Palo Verde First Exam Date:
November 7, 2008 Written Exam Outline (9/3/08)
Comment Resolution 1 Replacement K/As were not identified on Form 401-4 2
A number of Generic K/As for Tiers 1 and 2 were selected outside the recommended list in ES-401 D.1.b.
Comment only. No resolution required.
3 A description of the sampling process needs to be included with the submittal in accordance with ES-401 D.1.b.
Administrative JPM Outline (Date)
Comment Resolution 1 None Control Room / In-Plant System JPM Outline (9/3/08)
Comment Resolution 1
The SRO-U applicants are required to have separate safety functions for all five JPMs. Additionally, the quality checklist forms are not Supp-1.
Simulator Scenario Outline Comments (9/3/08)
Comment Resolution 1
Event 1 in Scenario 4 is a Reactivity Manipulation and should be documented as such on ES-D-1 and ES-301-5