MONTHYEARML0506803032005-03-0404 March 2005 Second 10-Year Interval - Eleventh Refueling Outage Inservice Inspection Summary Project stage: Request ML0515202672005-06-0202 June 2005 6/2/05, Palo Verde, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603903502006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4702, MC4703, and M4704) Project stage: RAI ML0735310952007-12-10010 December 2007 Request for Extension to Complete the Final Confirmatory Testing, Analysis and Validation of Containment Sump Strainers Associated with NRC Generic Letter 2004-02 Project stage: Request ML0817002812008-06-0606 June 2008 Request for Extension to Complete the Final Confirmatory Analysis and Validation of Containment Sump Strainers Associated with NRC GL-04-002 Project stage: Request ML0818206392008-06-30030 June 2008 Approval of Extension Request for Corrective Actions Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other ML0832503462008-11-14014 November 2008 E-Mail Response Re Licensees Request for Extension to Revised Supplemental Response to Generic Letter 2004-02 Project stage: Other ML0833701622008-11-14014 November 2008 Notification and Concurrence of Extension for Submittal of the Revised Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request ML0832309372008-12-0303 December 2008 Extension Request for Submittal of the Revised Supplemental Response to Generic Letter 2004-02 Project stage: Other ML0834305492008-12-16016 December 2008 Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML1000706512010-01-0707 January 2010 Request for Additional Information Related to NRC Generic Letter 2004-02 Project stage: RAI ML1000706482010-01-0707 January 2010 Email Request for Additional Information Related to NRC Generic Letter 2004-02 Project stage: RAI ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Project stage: Meeting ML15239B3222015-09-0909 September 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML15268A1312015-10-0505 October 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML15348A0542015-12-15015 December 2015 Slides for December 17, 2015 Public Meeting with APS on Resolution of GL 2004-02 Project stage: Meeting 2008-06-30
[Table View] |
Text
Generic Letter 2004-02 Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-0592.4-DCM/DGS November 14, 2008 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Notification and Concurrence of Extension for Submittal of the Revised Supplemental Response to NRC Generic Letter 2004-02 This letter confirms Arizona Public Service Company's (APS) notification and the NRC's concurrence that APS' Revised Supplemental Response to NRC Generic Letter 2004-02 may be extended until December 19, 2009.
As committed, APS has completed the installation of the new, larger containment sump strainers in all three PVNGS units. Plant specific chemical effects testing of the strainer design was performed by the strainer vendor, Control Components, Inc. (CCI), in 2007. Additional testing was completed in Spring 2008 by CCI, and observed by representatives from the NRC and APS, using more conservative parameters than the 2007 tests. The results from the recent tests confirmed the capability of the strainer design to perform its safety function.
APS has received the analysis and validation for the containment sump strainers and technical reviews are complete to demonstrate compliance with GL 2004-02.
This extension was requested to provide the results of those efforts in the format requested by GL 2004-02 guidance. APS makes no commitments in this correspondence.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak
- Diablo Canyon 0 Palo Verde a San Onofre 0 South Texas Project S Wolf Creek 1
/
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Notification and Concurrence of Extension for Submittal of the Revised Supplemental Response to NRC Generic Letter 2004-02 Page 2 Should you have questions regarding this notification, please contact Russell Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, DCM/SAB/RAS/gat cc:
E. E. Collins Jr.
B. K. Singal R. I. Treadway D. G. Harrison NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS NRC NRR Safety Systems, BOP Branch Chief