ML083500366

From kanterella
Jump to navigation Jump to search
Confirmatory Order Action Completion
ML083500366
Person / Time
Site: Palo Verde  
Issue date: 12/03/2008
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-05933-DCM/SAB/REB
Download: ML083500366 (1)


Text

Confirmatory Order EA-07-162 111 A subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-05933-DCM/SAB/REB December 03, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

1. Letter 102-05912 dated October 21, 2008 from APS to the NRC.

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Confirmatory Order Action Completion This letter is being submitted to correct an error in Reference 1, which indicated that an enclosure was included with the letter when no enclosure was intended to be included.

No commitments to the NRC are made in this letter. If you have any questions please contact Scott A. Bauer, Director, Regulatory Affairs/Environmental, at (623) 393-5978.

Sincerely, DCM/SAB/REB/gat cc:

E. E. Collins Jr.

NRC Region IV Regional Administrator B. K. Singal NRC NRR Project Manager - (send electronic and paper)

R. I. Treadway NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway D Comanche Peak 0 Diablo Canyon 0 Palo Verde C San Onofre CSouth Texas Project 0 Wolf Creek