Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02361023631 December 2002of GE-NE-0000-0005-7308-01, Dresden Unit 2 & 3 - Elimination of MSIV Closure & Low Condenser Vacuum Scram Function During Startup Mode.Power change
ML02344030024 December 2002Approval of Proposed Revision 70 of Quality Assurance Topical Report EGC-1A, REV.70 in Accordance with 10 CFR 50.54(a) Requirements for Exelon/Amergen Plants
ML02365054623 December 2002Core Operating Limits Report for Unit 2 Cycle 18, Revision 2
RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode20 December 2002Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup ModeScram Discharge Volume
Fuel cladding
ML03008004320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal Schedule
ML03008005320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal ScheduleAnticipated operational occurrence
Hydrostatic
Nondestructive Examination
RS-02-208, Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 113 December 2002Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 1
ML02357032013 December 2002November 2002 Monthly Operating Report for Dresden, Units 2 and 3
ML0301606419 December 2002OI-3-2001-040, Dresden, Release of OI Synopsis
ML0304505606 December 2002Final As-Administered Scenarios for the Dresden Retake Examination - Jan 2003Operability Determination
Power change
Downpower
ML0304505596 December 2002Final As-Administered Scenarios for the Dresden Retake Examination - Jan 2003Operability Determination
Power change
ML0304406776 December 2002Initial Submittal of Scenarios for the Dresden Retake Examination - Jan 2003Operability Determination
ML0304406696 December 2002Initial Submittal of Scenarios for the Dresden Retake Examination - Jan 2003Operability Determination
Power change
Downpower
ML0304406666 December 2002Initial Submittal of Scenarios for the Dresden Retake Examination - Jan 2003Operability Determination
Power change
ML0234501722 December 2002LER 89-029-05, Dresden Unit 2, Elevated HPCI Discharge Piping Temperature Due to Reactor Feedwater System Back LeakageNon-Destructive Examination
ML02345057027 November 2002Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement ProcessOffsite Dose Calculation Manual
Incorporated by reference
Annual Radioactive Effluent Release Report
ML02333044225 November 2002Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 StartersMELLLA
ML02337036925 November 2002GFE Registration Letter - February 2003 ExaminationGeneric Fundamentals Examination
ML02338059925 November 2002Exemption Request from the Requirements of 10 CFR 50.36(c)(1)Safety Limit Minimum Critical Power Ratio
Abnormal operational transient
Exemption Request
Fuel cladding
ML02339011725 November 2002Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report
ML02331056922 November 2002Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect
ML02336006922 November 2002Reportable Condition Stability Option III: Period Based Algorithm T Specification
ML02329016218 November 2002Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not ReportableMELLLA
ML02326027515 November 2002October 2002 Monthly Operating Report for Dresden Units 2 & 3Coast down
ML13135A14115 November 2002Appeal Example - Informal Review Reslult, DresdenHalf scram
RS-02-197, Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads Handling11 November 2002Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads HandlingSafe Shutdown
ML02310003911 November 2002Examples of Risk-Informed Licensing Actions for Acrs/AcnwProbabilistic Risk Assessment
Large early release frequency
ML0231103577 November 2002Re FEMA Report for May 2002 Emergency Preparedness Exercise
ML0230905581 November 2002Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002Generic Fundamentals Examination
ML0230904051 November 2002IR 05000237-02-015(DRS) & IR 05000249-02-015(DRS), on 08/26-30/02, Dresden Nuclear Power Station, Units 2 & 3. Licensed Operator RequalificationEnforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
License Renewal
ML02311040131 October 2002Response to Request for Information Regarding High Pressure Coolant Injection System
IR 05000237/200201230 October 2002IR 05000237-02-012, IR 05000249-02-012, on 09/30/2002, Exelon Generation Company, Dresden Nuclear Power Station, Units 2 and 3. Equipment Alignment, Fire Protection, Radiation Monitoring Instrumentation and Protective EquipmentHigh Radiation Area
Half scram
Hydrostatic
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Operability Determination
Fire Watch
Scaffolding
Operability Assessment
Power Uprate
ML05200010230 October 2002Memorandum and Report of Investigation of Audit Findings and Discrimination by Blacklisting a Former Principal Auditor for Raising Safety Concerns
RS-02-183, Attachment B, Proposed Revisions to the Updated Final Safety Analysis Report28 October 2002Attachment B, Proposed Revisions to the Updated Final Safety Analysis Report
RS-02-187, Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)25 October 2002Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)VT-2
Liquid penetrant
Through-Wall Leak
ML02308034322 October 2002Dresden (Grundy and Will Counties) Power Rate Uprate for Units 2 & 3 - Kankakee River Log # C-1139-01
ML02308010522 October 2002Core Operating Limits Report for Dresden Unit 3 Cycle 18MELLLA
ML02291022822 October 2002Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues
ML02294018318 October 2002OI-3-2001-039, Dresden, Release of OI Synopsis
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
ML02296022815 October 2002Meeting Handout for Exelon/Amergen Licensing Meeting with NRC
ML02296053915 October 2002September 2002 Monthly Operating Report for Dresden, Units 2 and 3Coast down
ML02290075711 October 2002Ltr Dated 10/11/2002 for Dresden Re Administration of Licensing Examinations Week of 01/20/2003
RS-02-175, Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements10 October 2002Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements
ML02294029610 October 2002Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments E-2 - F-2Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Hydrostatic
Squib
Qualified Offsite Circuit
Scram Discharge Volume
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
RS-02-174, Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-110 October 2002Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-1Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Squib
Qualified Offsite Circuit
B.5.b
Scram Discharge Volume
Excess Flow Check Valve
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Unidentified leakage
Power Uprate
Affidavit
TAC:MB40304 October 2002
ML0228208684 October 2002Re Requalification Program Inspection Week of 11/18/02
ML0227305654 October 2002Amendment, Issuance of Exigent Amendments, Lifting Heavy LoadsSafe Shutdown
Design basis earthquake
Earthquake
Control of Heavy Loads
ML0225902034 October 2002Relief Request, PR-22 for Third 10-year Inservice Inspection Interval (MB4030, MB4031)Incorporated by reference