MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] |
Text
Exelkns.
Exelon Generation www exeloncop corn Nuclear Dresden Generating Station 6500 North Dresden Road Morms, IL 60450-9765 Tel 815-942-2920 November 25, 2002 10 CFR 50.46(a)(3)
RHLTR: #02-0083 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249
Subject:
Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report References 1) Letter from S. N. Bailey (U. S. NRC) to 0. D. Kingsley (Exelon Generation Company, LLC), "Issuance of Amendments," dated November 2, 2001
- 2) Letter from L. W. Rossbach (U. S. NRC) to 0. D. Kingsley (Exelon Generation Company, LLC), "Issuance of Amendments for Extended Power Uprate" dated December 21, 2001
- 3) Letter from Preston Swafford (Exelon Generation Company, LLC) to U. S.
NRC, "Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report,"
dated December 6, 2001 In accordance with 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," paragraph (a)(3)(ii), Exelon Generation Company (EGC),
LLC, is reporting a change to the evaluation model used for evaluating the emergency core cooling system (ECCS) performance and the peak cladding temperature (PCT) at Dresden Nuclear Power Station (DNPS), Unit 3.
In Reference 1, the NRC approved changes to the Technical Specifications (TS) for DNPS to allow a change in fuel vendors from Framatome ANP (formerly Siemens Power Corporation (SPC)) to General Electric (GE) Company and a transition to GE14 fuel. In accordance with these changes, the GE SAFER/GESTR ECCS evaluation model was used for DNPS, Unit 3 Cycle 18 (D3C18), instead of the SPC evaluation model used for the previous cycle (D3C17).
In Reference 2, the NRC approved changes to the TS and operating license to permit operation at uprated power. The change in evaluation models, along with the transition to GE14 fuel and the operation at uprated power levels has resulted in a change to the PCT for the fuel.
As of October 25, 2002, DNPS Unit 3 has implemented the change in ECCS models and the GE14 fuel transition for D3C18. For D3C17, the PCT of record, based on the Framatome ANP evaluation method, was 1973 degrees F, as reported in Reference 3. The calculated PCT for D3C18, based on the GE evaluation model, is 2110 degrees F. This is a change of more than
November 25, 2002 Page 2 50 degrees F and is being reported in accordance with 10 CFR 50.46(a)(3)(ii). An attachment to this letter provides details regarding this change.
Based on the current GE evaluation model assessments, although a minor error was discovered, it resulted in no changes in the current PCT for DNPS Unit 2. The PCT of record is being provided as an attachment to this letter to meet the annual reporting requirements per 10 CFR 50.46(a)(3)(ii).
If there are any questions concerning this letter, please contact Mr. Jeff Hansen at (815) 416 2800.
Respectfully, Robert J Hoveyl Site Vice President Dresden Nuclear Power Station : Dresden Nuclear Power Station, Unit 2 10 CFR 50.46 Report : Dresden Nuclear Power Station, Unit 3 10 CFR 50.46 Report : Dresden Nuclear Power Station, Units 2 and 3 10 CFR 50.46 Report Assessment Notes cc: Regional Administrator- NRC Region III NRC Senior Resident Inspector - Dresden Nuclear Power Station
Attachment I Dresden Nuclear Power Station Unit 2 10CFR50.46 Report PLANT NAME: Dresden Nuclear Power Station, Unit 2 ECCS EVALUATION MODEL: SAFER/GESTR-LOCA REPORT REVISION DATE: 10/29/2002 CURRENT OPERATING CYCLE: 18 ANALYSIS OF RECORD Evaluation Model: The GESTR-LOCA and SAFER Models for the Evaluation of the Loss-of-Coolant Accident, Volume III, SAFER/GESTR Application Methodology, NEDE-23785 1-PA, General Electric Company, Revision 1, October 1984.
Calculations:
"SAFERJGESTR-LOCA Loss-of-Coolant Accident Analysis for Dresden Nuclear Station 2 and 3 and Quad Cities Nuclear Station Units 1 and 2," NEDC-32990P, Revision 1, GE Nuclear Energy, September 2001.
Fuel: 9x9-2, ATRIUM-9B and GE14 Limiting Fuel Type: GE14 Limiting Single Failure: Diesel Generator Limiting Break Size and Location: 1.0 Double-Ended Guillotine in a Recirculation Suction Pipe Reference Peak Cladding Temperature (PCT) PCT = 2110°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 report dated December 6, 2001 (See Note 1) APCT = 0°F Net PCT 2110 OF B. CURRENT LOCA MODEL ASSESSMENTS WEVOL S1 Volume Error (See Note 3) APCT= 0°F Total PCT change from current assessments ,_APCT = 0 OF Cumulative PCT change from current assessments Y_ I APCT I= 0°F Net PCT 2110 OF
x.
Attachment 2 Dresden Nuclear Power Station Unit 3 10CFR50.46 Report PLANT NAME: Dresden Nuclear Power Station, Unit 3 ECCS EVALUATION MODEL: SAFEPRGESTR-LOCA REPORT REVISION DATE: 10/29/2002 CURRENT OPERATING CYCLE: 18 ANALYSIS OF RECORD Evaluation Model: The GESTR-LOCA and SAFER Models for the Evaluation of the Loss-of-Coolant Accident, Volume III, SAFER/GESTR Application Methodology, NEDE-23785 1-PA, General Electric Company, Revision 1, October 1984.
Calculations:
"SAFERIGESTR-LOCA Loss-of-Coolant Accident Analysis for Dresden Nuclear Station 2 and 3 and Quad Cities Nuclear Station Units 1 and 2," NEDC-32990P, Revision 1, GE Nuclear Energy, September 2001.
Fuel: 9x9-2, ATRIUM-9B and GE14 Limiting Fuel Type: GE14 Limiting Single Failure: Diesel Generator Limiting Break Size and Location: 1.0 Double-Ended Guillotine in a Recirculation Suction Pipe Reference Peak Cladding Temperature (PCT) PCT = 2110°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS None (See Note 2) APCT = 0°F Net PCT 2110 OF B. CURRENT LOCA MODEL ASSESSMENTS WEVOL S1 Volume Error (See Note 3) APCT= 0°F Total PCT change from current assessments XAPCT = 0 OF Cumulative PCT change from current assessments Y_ I APCT I=0°F Net PCT 2110 OF
Attachment 3 Dresden Nuclear Power Station Units 2 and 3 10 CFR 50.46 Report Assessment Notes
- 1. Prior LOCA Model Assessment The 50.46 letter dated December 6, 2001 reported a new LOCA analysis to support extended power uprate (EPU) and transition to GE14 fuel for Dresden Unit 2 Cycle 18. The same report assessed impact of errors in Framatome ANP LOCA analysis model for Dresden Unit 3 Cycle 17 at pre-EPU power level.
[
Reference:
Letter from Preston Swafford (PSLTR: #01-0122) (Exelon) to USNRC, "Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report," December 6, 2001.]
- 2. New LOCA Analysis for Dresden Unit 3 Unit 3 implemented GE LOCA analysis and GE14 fuel with Dresden Unit 3 Cycle 18 startup on October 25, 2002. Therefore, both Dresden Units 2 and 3 are being maintained under the same LOCA analysis.
[
Reference:
"SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis for Dresden Nuclear Station 2 and 3 and Quad Cities Nuclear Station Units 1 and 2," NEDC-32990P, Revision 1, GE Nuclear Energy, September 2001.
- 3. Current LOCA Assessment GE reported that an error was found in the WEVOL code, which affects the calculated vessel volume in the downcomer region. The free volume in the region of the shroud head is calculated incorrectly. The code did not properly account for the volume of the standpipes inside the shroud head thickness. This resulted in the value for the free volume in the downcomer being too small by 4-10 ft 3. GE determined the PCT impact of this error on all fuel types to be negligible.
[
Reference:
10 CFR 50.46 Notification Letter, 2002-05, August 26, 2002.]