Dresden Generating Station SIMULATOR EXERCISE GUIDE ILT 01-1 NRC RE-EXAM SCENARIO ILT-R-1 Rev. 01 11/02 DEVELOPED BY: Mark Otten (Original on file) 12/6/02 Exam Author Date APPROVED BY: Rich Gadbois (Original on file) 12/6/02 Facility Representative Date Master Copy ML030450559.doc

Appendix D Scenario Outline Form ES-D-1 Facility: Dresden Scenario No: ILT-R-1 Op-Test No: ILT 01-1 Examiners: ___________________________ Operators: __________________________

Initial Conditions: 15% reactor power, IRM channel 15 OOS, Unit 3 is in Mode 1 Turnover: Unit startup in progress; transfer auxiliary power to transformer 21, then continue power ascension Event Malf. Event Event No. No. Type* Description ANSO 1 N/A N Transfer Aux power from TR-22 to TR-21 SRO NSO 2 N/A R Raise reactor power by withdrawing control rods SRO NSO 3 RDFAILF5 I RPIS failure for rod F5 SRO 4 MGMATMF I ANSO Failure of the main generator voltage regulator in SRO automatic RRDMBSTP NSO Trip of the 2B recirc pump 5 C SRO HP6 ANSO Trip of the 2A circ water pump with a failure of the 2B 6 C SRO circ water pump to start B12, AW4 7 ALL Failure of RPS to deenergize and ARI to initiate M

HP5 ANSO 8 Loss of main condenser vacuum / Failure of SBLC to SRO inject

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 2 of 26 NUREG-1021, Revision 8, Supplement 1

Dresden Generating Station NRC ILT EXAM Scenario ILT-R-1 Scenario Objective Evaluate the operators in using the Failure to Scram contingency procedure.

Scenario Summary Initial Conditions:

  • 15% power, unit startup in progress
  • Unit 3 is in Mode 1 Events:
  • Transfer Aux Power from TR-22 to TR-21
  • RPIS failure for rod F5
  • Failure of the main generator voltage regulator in automatic
  • Trip of the 2B recirc pump
  • Trip of the 2A circ water pump with a failure of the 2B circ water pump to start
  • Failure of RPS to deenergize and ARI to initiate
  • The team transfers Aux Power from TR-22 to TR-21.
  • The NSO, as directed by the SRO, then continues the power ascension for unit startup by control rod withdrawal.
  • During the control rod withdrawal, a failure to a rod occurs and that rod must be driven in fully.
  • The main Generator Voltage Regulator trips to manual while reducing Generator Voltage. The voltage reduction is continued in the Manual Mode.
  • An electrical fault causes the 2B recirc MG set to trip. The team will carry out actions for a recirc pump trip, and enter single loop operation.
  • A Spurious Channel A scram occurs. An ATWS condition exists due to a failure of RPS A to deenergize and ARI is unsuccessful. The team should perform the ATWS DEOP. Pulling RPS fuses, venting the scram air header and driving control rods are successful. The event is complicated by a loss of RFPs and the team should control RPV level using the HPCI and / or CRD system.
  • Due to 2A Circulating Water Pump tripping and the failure of 2B Circulating Water Pump to start, the Team experiences a loss of Main Condenser vacuum.
  • The scenario is terminated when all rods are inserted and the plant stabilized.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 3 of 26 Rev. 01 (11/02)

Event One - Transfer Aux Power from TR-22 to TR-21 The team transfers Aux Power from TR-22 to TR-21.

Malfunctions required: 0 Success Path:

  • Aux Power is transferred to TR-21 IAW DOP 6500-01.

Event Two - Raise Reactor power by withdrawing control rods.

The team increases reactor power by withdrawing control rods per DOP 0400-01, and DGP 03-04, .

Malfunctions required: 0 Success Path:

Event Three - RPIS failure for rod F5 A total RPIS failure for rod F5 during a reactor power increase by withdrawing rods.

Malfunctions required: 1 (RPIS failure for rod F5)

Success Path:

  • The team recognizes a total RPIS failure for rod F5 and the control rod is fully inserted per DOA 0300-06 Event Four - Failure of the Main Generator Voltage Regulator in automatic The team should recognize and respond to failure of the Main Generator Voltage Regulator in automatic.

Malfunctions required: 1 (Trip main generator voltage regulator from auto to manual)

Success Path:

  • The team transfers the Voltage Regulator to manual.

Event Five - Trip of the 2B Recirc Pump An electrical fault causes the MG Set to trip Malfunctions required: 1 (Trip of Recirc MG set)

Success Path:

  • Takes action to isolate tripped Recirc Pump.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 4 of 26 Rev. 01 (11/02)

Event Six - Trip of the 2A Circ Water Pump with a failure of the 2B Circ Water Pump to start.

The team should recognize and respond to Circulating Water Pump 2A tripping on overload. The ANSO should attempt to manually start the 2B Circulating water Pump. The 2B Circulating Water Pump fails to start.

Malfunctions required: 2 (Circulating Water Pump trip)

(Failure of other Circ Water Pump to start)

Success Path:

  • Securing of 2C Circ water Pump.

Event Seven - Failure of RPS to deenergize and ARI to initiate.

The team should recognize and respond to an ATWS condition.

Malfunctions required: 2 (RPS failure to deenergize)

(Failure of ARI)

Success Path:

  • Inserts rods using alternate methods.
  • Control RPV level.

Event Eight - Loss of Main Condenser vacuum / Failure of SBLC to inject.

The team should recognize and respond to the loss of Main Condenser Vacuum and the failure of SBLC to inject.

Malfunctions required: 2 (Increase air in-leakage to Condenser)

(SBLC relief valve setpoint too low)

Success Path:

  • All rods inserted Scenario Recapitulation Total Malfunctions: 9 Abnormal Events: 4 Major Transients: 1 (ATWS)

EOPs Entered: 1 EOP Contingencies: 1 (ATWS)

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 5 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 1 Page 1 of 1 Event

Description:

Transfer Aux Power from TR-22 to TR-21.

Time Position Applicants Actions or Behavior ANSO Performs the following actions per DOP 6500-01, TRANSFER OF 4160 VOLT BUS POWER SUPPLY:

G At Panel 902-8, Synchronize incoming power source breaker.

G Position TR 21 to BUS 23 GCB control switch to CLOSE.

G Position TR 22 to BUS 23 GCB control switch to TRIP.

G Position TR 21 to BUS 21 GCB control switch to CLOSE.

G Position TR 22 to BUS 21 GCB control switch to TRIP.

G Verify appropriate bus ammeter and voltmeter indications normal.

SRO Directs transferring Aux Power from TR-22 to TR-21 per DOP 6500-01, TRANSFER OF 4160 VOLT BUS POWER SUPPLY.

NSO Monitors panels and assists as directed.

Event 1 Completion Criteria:

Aux Power has been transferred from TR-22 to TR-21.

AND, at the direction of the NRC Chief Examiner.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 6 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 2 Page 1 of 1 Event

Description:

The NSO, as directed by the SRO, then continues the power ascension for unit startup by control rod withdrawal.

Time Position Applicants Actions or Behavior NSO Performs the following actions per DOP 0400-01, Reactor Manual Control System Operation, and DGP 03-04, Control Rod Movements, as directed Verifies the following prior to moving any control rod:

G Control rod selected on the select matrix is correct rod.

G Second Verification requirements satisfied.

G Rod Out Permit light is illuminated.

G Drive water pressure at nominal 260 psid.

Withdraws rods as follows:

G Moves Rod Out Notch Override (RONOR) Switch to NOTCH OVERRIDE position (use of RONOR switch is optional) and the Rod Movement Control switch to ROD OUT.

G Verifies ON light illuminated and proper Control Rod Timer operation.

G Performs coupling check.

  • Verifies rod settles to target position and proper response of nuclear instrumentation.

ANSO Performs second verification checks.

For first rod in a step:

G Verifies correct control rod pattern G Verifies correct step and array.

G Verifies RWM rod blocks enabled For all rods moved:

G Verifies correct control rod selected.

G Verifies planned control rod motion is correct.

G Immediately notify the NSO of errors during rod motion.

Verifies control rod at target position.

SRO Directs pulling control rods.

G Reviews REMA.

G Designates second verifier.

Directs NSO to pulls rods.

Event 2 Completion Criteria:

Sufficient power increase.

AND, at the direction of the NRC Chief Examiner.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 7 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 3 Page 1 of 2 Event

Description:

A total RPIS failure for rod F5 during a reactor power increase by withdrawing rods.

Time Position Applicants Actions or Behavior SIMULATOR OPERATOR:

Ensure rod is at 123 or 48 from previous event.

At the discretion of the NRC Chief Examiner, activate trigger 1, RPIS failure for control rod F-05 NSO Reports annunciator DAN 902-5 A-3, ROD DRIFT, in alarm and refers to DAN:

G Views Full Core Display AND identifies CRD with Rod Drift light illuminated.

G Selects Control Rod F-05 G Reports no position indication on Four Rod Display for Control Rod F-05.

NSO Recognizes loss of control rod F-05 position indication on Full Core Display, Four Rod Display, RWM, and/or Process Computer (OD-7)

SRO References Tech Spec 3.1.3., Control rod Operability References DOA 0300-06 RPIS Failure.

Team may enter DOA 0300-12, Mispositioned Control Rod NSO Performs immediate action of DOA 0300-06, RPIS Failure:

G Stops any power change or control rod motion in progress (immediate action).

G May insert Rod F-05 per DOA 300-5 to 00 prior to entering DOA 0300-06.

NSO Performs subsequent actions of DOA 0300-06, RPIS Failure:

G Enter substitute position of 48 for F-05.

G Insert control rod F-05 one notch.

G Determines no control rod position indication at alternate position.

G Drives control rod F-05 to fully inserted position. (verification of insertion by normal insertion time, LPRMs decreasing and Stall flow indication.)

NOTE: Driving control rod F-05 to fully inserted should take about 60 seconds.

G Electrically or hydraulically isolate the control rod F-05 HCU.

G May enter a substitute position and take OOS on the RWM.

G Notify a QNE of the action taken and to obtain further guidance.

ROLE PLAY:

When directed to disarm CRD F-05, Respond that you will disarm the CRD after you receive a brief.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 8 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 3 Page 2 of 2 Event

Description:

A total RPIS failure for rod F5 during a reactor power increase by withdrawing rods.

Time Position Applicants Actions or Behavior NSO Records the failed RPIS indication per DOS 0300-06, Control Rod Drive Abnormality Record.

SRO May contact any or all of the following to inform of the situation or request assistance.

G System Engineer.

G Shift Operations Superintendent.

G Operations Manager ROLE PLAY Respond as the appropriate person. If asked for assistance, respond that you will come to the control room shortly.

Event 3 Completion Criteria:

- DOA 0300-06 actions have been taken.

- Technical Specifications have been referenced.

- AND, at the discretion of the NRC Chief Examiner ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 9 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 4 Page 1 of 2 Event

Description:

While adjusting VARs per the BPOs direction, the Main Generator Voltage Regulator fails in automatic, the Aux NSO places the Voltage Regulator in manual and continues the voltage reduction.

Time Position Applicants Actions or Behavior SIMULATOR OPERATOR / ROLE PLAY:

After event (3) is complete and at the discretion of the NRC Chief Examiner, call the Team as the BPO and request VARs be reduced to 0 (or value specified by NRC Chief Examiner. Notify the Simulator Operator as soon as VAR reduction is started.

Team acknowledges the request from the BPO.

SRO Directs the AUX NSO to adjust Main Generator VARs per DOP 6400-08, 345 KV Voltage Control.

ANSO Begins adjusting Main Generator VARs per DOP 6400-08:

G References Figure 2, Dresden Units 2 or 3 Generator capability Curves and Under Excitation Limiter Settings, Regulator: In Service.

G Uses AUTO VOLTAGE ADJUST control switch to control system voltage as directed by BPO.

SIMULATOR OPERATOR As soon as Main Generator VAR adjustment is started, activate trigger 2, Trips the Main Generator Voltage regulator From Automatic to Manual.

ANSO G Reports annunciator 902-8 B-12 GENERATOR VOLTAGE REGULATOR TRIPPED.

G Places the Voltage Regulator Mode Control Switch to MANUAL.

Team dispatches an NLO to investigate Voltage Regulator Trip.

ROLE PLAY:

Respond as an NLO. Wait a few minutes, then report that you see nothing abnormal locally.

Team contacts Maintenance and/or Work Week Manager for voltage Regulator investigation.

ROLE PLAY:

Respond as individual contacted (EMD, OAD) The voltage regulator will work in manual ANSO Continues voltage adjustment per DOP 6400-08 G Ensure loading is within Figure 3, Dresden Units 2 or 3 Generator capability Curves and Under Excitation Limiter Settings, Regulator:

Out-of-Service.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 10 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 4 Page 2 of 2 Event

Description:

While adjusting VARs per the BPOs direction, the Main Generator Voltage Regulator fails in automatic, the Aux NSO places the Voltage Regulator in manual and continues the voltage reduction.

Time Position Applicants Actions or Behavior ROLE PLAY:

If the Team discontinues the VAR adjustment without contacting the BPO, wait approximately 5 minutes after the voltage regulator trip and call the Team back as the BPO and ask for the VAR adjustment again.

Team may set up computer alarms for VARs EVENT 4 COMPLETION CRITERIA:

- This event is complete when the Team has transferred the Main Generator Voltage Regulator to MANUAL and adjust VARs.

- AND, at the discretion of the NRC Chief Examiner.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 11 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 5 Page 1 of 2 Event

Description:

An electrical fault will cause 2B Recirc MG Set to trip. The Team will carry out actions for a Recirc Pump trip, and enter single loop operation.

Time Position Applicants Actions or Behavior SIMULATOR OPERATOR:

At the discretion of the NRC Chief Examiner, activate trigger 3, which causes a Recirc MG Set B Failure.

ROLE PLAY NLO or Field Supervisor:

As soon as trigger is inserted, report that you heard unusual noises coming from the B Recirc MG Set, you noticed some arcing from the Generator and then the MG Set shutdown.

NSO G Responds to 2B Recirc Pump in accordance with DOA 0202-01.

G Refers to DOA 0202-01.

G Monitors RPV water level control.

G Closes discharge valve for Recirc Pump 2B.

G Notifies QNE.

G Monitors MSL and Off gas Rad monitors for increased activity.

G May Notify Chemistry.

ROLE PLAY:

QNE:

Acknowledge the contact and inform the crew he will be in the Control Room shortly (if not presently in the control room).

Wait approximately 5 minutes, then report to the control room that no core operating limits have been exceeded.

NLO at Bus 22 Breaker report, when asked, 2B MG Set has tripped on overcurrent.

NSO G References DGP 03-03, Single Recirculation Loop Operation.

G After 5 minutes, may reopen the recirc discharge valve for the B recirc loop.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 12 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 5 Page 2 of 2 Event

Description:

An electrical fault will cause 2B Recirc MG Set to trip. The Team will carry out actions for a Recirc Pump trip, and enter single loop operation.

Time Position Applicants Actions or Behavior G Enters DOA 0202-01.

SRO G Contacts the EM department for assistance.

G Notifies Shift Manager.

Role Play:

EM Foreman:

Acknowledge the report, and tell them you will send a crew to look at the MG set shortly.

Wait 5 minutes then call the Unit Supervisor on the phone inform him that there appears to have been serious arcing inside the generator casing, and it will require disassembly of the MG set to correct it. You expect this will be a minimum 3 day outage for the MG set.

Event 5 Completion Criteria:

Crew has closed the 2B Recirc Pump discharge valve.

AND, at the discretion of the NRC Chief Examiner.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 13 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 6, 7, & 8 Page 1 of 4 Event

Description:

Circulating Water Pump 2A trips on overload. The ANSO attempts to manually start Circulating Water Pump 2B, which fails to start. NSO inserts a manual scram. RPS fails to de-energize and ARI fails. Team must also deal with loss of Condenser vacuum.

Time Position Applicants Actions or Behavior SIMULATOR OPERATOR:

At the discretion of the NRC Chief Examiner, activate trigger 4, which causes 2A Circulating Water Pump to trip and prevents the 2B Circulating Water Pump from starting.

ANSO Performs the following actions per DAN 902-7 A-15, Circ Wtr PP Trip, DOA 4400-01, Circulating Water System Failure, and DOA 6500-10, 4KV Circuit Breaker Trip, as directed:

G Attempts to start 2B Circulating Water Pump. (immediate action)

G Reports 2B Circulating Water Pump will not start.

G Stops 2C Circulating Water Pump.

G May send NLO to check 2A and 2C Circulating Water Pump breakers.

ROLE PLAY:

NLO to 2A and 2B Circulating Water pump breakers (wait 3 min)

Report 2A and 2B Circulating Water pump breakers have an overcurrent target up.

NLO to check cribhouse bar racks and traveling screens (wait 3 min)

Report the cribhouse bar racks and traveling screens are clear.

Chemistry responds they will secure hypochlorite to Unit 2.

NSO Performs the following actions per DGP 02-03, Reactor Scram:

G Presses scram pushbuttons.

G Places mode switch in shutdown.

G Check rods inserted; discovers rods not inserted.

G Initiates ARI, checks rods, announces ATWS condition.

NSO / Performs DEOP 100, then DEOP 400-5, Failure to Scram, actions as ANSO directed:

G Places ADS to inhibit.

G Places both CS pumps in PTL.

Power Leg G May insert IRMs & SRMs G Performs Alternate Rod Insertion. (see specific actions below)

G Initiates SBLC.

G Reports that SBLC fails to inject.

Level Leg Rx Power >6%

G Terminates and Prevents injection except boron and CRD until RPV/L is -35 in.

G Maintains RPV/L between -164 in. and the level lowered to.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 14 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 6, 7 & 8 Page 2 of 4 Event

Description:

Circulating Water Pump 2A trips on overload. The ANSO attempts to manually start Circulating Water Pump 2B, which fails to start. NSO inserts a manual scram. RPS fails to de-energize and ARI fails. Team must also deal with loss of Condenser vacuum.

Time Position Applicants Actions or Behavior Pressure Leg G Verifies turbine/bypass valves maintaining RPV/P <1060 psig.

G Maintains <1060 psig using IC, ADSVs and / or HPCI when Bypass valves close.

SIMULATOR OPERATOR / ROLE PLAY:

Operator to jumper the MSIV Group1 -59 in. and offgas hi hi radiation isolations (wait 5 min):

Activate trigger 8 (jumpers the MSIV Group1 -59 in. and offgas hi hi radiation isolations) and report the MSIV Group1 -59 in. and offgas hi hi radiation isolations are jumpered.

SRO Enters and directs performance of DGP 02-03, Reactor Scram, and DEOP 100, RPV Control.

Due to report of ATWS condition, exits DEOP 100 and enters and directs performance of DEOP 400-05, Failure to Scram.

G Placing ADS to inhibit.

G Placing both CS pumps in PTL.

Power Leg Directs any of the following control rod insertion methods (first two most preferred) per DEOP 500-05, Alternate Insertion of Control Rods:

  • step G.2: pulling scram solenoid power supply fuses.
  • step G.5: using the scram test switches.

Directs Injecting SBLC.

Level Leg Verification water level instruments are accurate Verification any required automatic actions have occurred Directing jumpers installed for MSIV low level and Off Gas high Rad isolations Rx Power >6%

Terminating and Preventing injection except boron and CRD until RPV/L is -35 in.

Maintaining RPV/L between -164 in.

and the level lowered to.

Pressure Leg Maintaining <1060 psig using turbine/bypass valves.

When Bypass valves close, maintain <1060 psig using IC, ADSVs or HPCI.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 15 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 6, 7 & 8 Page 3 of 4 Event

Description:

Circulating Water Pump 2A trips on overload. The ANSO attempts to manually start Circulating Water Pump 2B, which fails to start. NSO inserts a manual scram. RPS fails to de-energize and ARI fails. Team must also deal with loss of Condenser vacuum.

Time Position Applicants Actions or Behavior SIMULATOR OPERATOR / ROLE PLAY:

Note: For the first two requested actions below, wait about 10 minutes and /

or at the discretion of the NRC Chief Examiner

1. Operator to pull scram channel A solenoid power supply fuses:

Activate trigger 10 (pulls Channel A RPS fuses and trips reactor feed pumps) and then after the fuses are all pulled report the scram channel A solenoid power supply fuses are pulled.

2. Operator to vent the scram air header:

Activate trigger 11 (vents the scram air header) and report I have vented the scram air header.

3. Operator to use the individual scram test switches (wait 2 min):

Go to Instructor Station screen ROD5 and begin simulating flipping the scram test switches. Follow the guidance in DEOP 500-05 for selecting rods.

NSO If directed, attempts to drive withdrawn control rods in per step G.6 of DEOP 500-05, Alternate Insertion of Control Rods:

G May close CRD 25 charging water valve.

G Throttles open the CRD FCV.

G May start a second CRD pump.

G May maximize drive water pressure using the CRD 8 valve G Bypasses the RWM.

G Applies an insert signal to insert rods in the following order:

  • intermediate 16-32
  • deep 4-14
  • shallow 34-48 SIMULATOR OPERATOR / ROLE PLAY:

NLO to close CRD 25 valve (wait 3 min):

Activate trigger 9 (closes the CRD 25 valve) and report the CRD 25 valve is closed.

NSO G Reports that all rods are inserted.

ANSO G Restores RPV level to +8 to +48 inches as directed.

G Begins cooldown as directed.

SRO When receives report that all rods are inserted, exits DEOP 400-05, Failure to Scram and enters DEOP 100 and directs:

G Controlling RPV water level between +8 to +48 inches.

G May direct depressurizing the RPV at <100 °F/hr.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 16 of 26 Rev. 01 (11/02)

Appendix D Operator Actions Form ES-D-2 Op-Test No: ILT 01-1 Scenario No.: ILT-R-1 Event No.: 6, 7 & 8 Page 4 of 4 Event

Description:

Circulating Water Pump 2A trips on overload. The ANSO attempts to manually start Circulating Water Pump 2B, which fails to start. NSO inserts a manual scram. RPS fails to de-energize and ARI fails. Team must also deal with loss of Condenser vacuum.

Time Position Applicants Actions or Behavior Scenario Completion Criteria:

Control rods inserted.

Plant stabilized.

AND, at the direction of the NRC Chief Examiner.

Critical Tasks (IDENTIFIED BY IN GUIDE)

G With a reactor scram required and the reactor not shutdown, TAKE ACTION TO REDUCE POWER by injecting boron and/or inserting control rods, to prevent exceeding the primary containment design limits.

G During an ATWS with conditions met to perform power/level control TERMINATE AND PREVENT INJECTION, with exception of boron and CRD, into the RPV until conditions are met to re-establish injection.

G When conditions are met to establish injection use available injection systems to MAINTAIN RPV water level above -164.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 17 of 26 Rev. 01 (11/02)

REFERENCES PROCEDURE TITLE REVISION DAN 902-5 A-3 Rod Drift 09 DAN 902-7 A-15 Circ Wtr PP trip 02 DAN 902-7 G-3 Turb Byp Vlv Open 01 DAN 902-8 B-12 U2 Generator Volt Reg Trip 04 DOP 0400-01 Reactor manual Control System Operation 18 DOP 6400-08 345 KV Voltage Control 14 DOP 6500-01 Transfer of 4160 Volt Bus Power Supply 05 DOS 0300-06 Control Rod Drive Abnormality Record 15 DOA 0202-01 Recirculation (Recirc) Pump Trip - One or Both Pumps 22 DOA 0300-06 RPIS Failure 14 DOA 0300-12 Mispositioned Control Rod 10 DOA 0500- 02 Partial 1/2 or Full Scram Actuation 02 DOA 0500-05 Loss of Reactor Protection System Bus 06 DOA 3300-02 Loss of Condenser Vacuum 23 DOA 4400-01 Circulating Water System Failure 17 DOA 6500-10 4KV Circuit Breaker Trip 03 DGP 01-01 Unit Startup 101 DGP 02-03 Reactor Scram 60 DGP 03-03 Single Recirculation Loop Operation 20 DGP 03-04 Control Rod Movements 43 DEOP 0100-00 RPV Control 10 DEOP 0400-02 Emergency Depressurization 04 DEOP 0400-05 Failure to Scram 12 DEOP 0500-02 Bypassing Interlocks and Isolations 12 DEOP 0500-05 Alternate Insertion of Control Rods 13 ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 18 of 26 Rev. 01 (11/02)

PRE-SCENARIO ACTIVITIES

1. If applicable, conduct pre-scenario activities in accordance with TQ-AA-106-0107, SIMULATOR EXAMINATION BRIEFING.
a. Provide the team with a copy of Control Room work request list.
b. Provide the team with a copy of DGP 01-01, Unit Startup, which is marked up to the point of transferring Aux Power from TR-22 to TR-21. (Step G-84)
c. If the team inquires about a startup plan, inform then the Shift Manager is maintaining it.
d. Provide the team with a copy of the REMA.
e. Inform the team that (select an individual) is the QNE present in the Control Room.
f. Direct the team to perform their briefs prior to entering the simulator.
2. Simulator Setup (the following steps can be done in any logical order)
a. Initialize simulator in IC 10 and perform the following prior to proceeding below:
1) Bring up Monitor
2) At input box, type FLZ1265 and <Enter>.
3) At input box, type 1=F and <Enter>.
4) Verify variable FLZ1265 is set to FALSE.
5) Goto Run and ensure variable stays FALSE.
6) Start the 2A Instrument Air Compressor as follows:

a) Open the RNI Display to the HOME page.

b) Open the Instrument Air screen c) Double click on the 2A Instrument Air Compressor d) Double click on IADCL2A e) Select RUN f) Click on INSERT g) Verify 2A Instrument Air compressor starts.

h) On the 923-1 panel verify the 2A Instrument Air compressor has a red target.

7) Use the Rodmove program to pull rods through step 60.
8) After the rod move is complete, verify with the Rodworth Minimizer that rod moves are completed through step 60. Make corrections if necessary.
9) Withdraw control rods C-11 and N-05 of step 61.
10) Adjust APRM gains.
11) Verify 2A EHC pump running.
12) Verify backpanel lights are reset.
13) Start 2E Drywell Cooler.
14) Adjust VARS to 200 out
b. Run the initial setup caep file: ilt-r-1.cae
c. Verify the following simulator conditions:
1) Vars set at ~100
2) MWe at ~130.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 19 of 26 Rev. 01 (11/02)

3) Condensate Demin DP between 20 and 45 psid.
4) Condensate pump amps between 160 and 255 amps
d. Secure the following equipment and tag out of service:
1) Place IRM 15 902-5 panel joystick in bypass and place an Equipment Status Tag on it.
2) Place 2B EHC Pump control switch in PTL and hang an OOS card on it
e. Advance the chart recorders.
f. Mark up rod sequence for current rod positions.
g. Complete the Simulator Setup Checklist.

ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 20 of 26 Rev. 01 (11/02)

Computer Aided Exercise Programs ILT 01-1 NRC EXAM SCENARIO ILT-R-1 Initial Setup CAEP:

  1. # ilt-r-1.cae
  1. Setup for ilt-r-1
  1. Written by MO
  1. Rev 00
  1. Date 10/02
  1. INITIAL CONDITIONS
  1. Clears the downscale ISO cond rad monitor imf ser0004 1 imf ser0019 1
  1. Prevents the RPS system and ARI from causing a Scram, sets both SBLC relief valves to 50 psig and prevents the 2B circ water pump from starting.

imf b12 imf scrlfvad 50 imf scrlfvbd 50 imf hp7 imf ser1026 1 imf ser1060 1

  1. SETUP EVENT TRIGGERS
  1. Event Trigger 1 insert a rpis failure for rod F5 trgset 1 "0" imf rdfailf5 (1)
  1. Event Trigger 2 inserts a failure of the voltage regulator trgset 2 "0"l2 imf mgmatmf (2)l2
  1. Event Trigger 3 inserts a trip of the 2B Recirc MG set trgset 3 "0"l3 irf rrrbdmbf (3) tripl3
  1. Event Trigger 4 insert a trip of the 2A circ water pump and causes an air leakage into the condenser over 1 minutes and pulls ari fuses.

trgset 4 "0"l4 imf hp6 (4)l4 imf hp5 (4) 100 1:00l4 irf aw4 (4) pulled

  1. Event Trigger 7 pulls scram fuse for all groups trgset 7 "0"l6 irf rpfusea4 (7) pulledl6 irf rpfusea1 (7 20) pulledl6 irf rpfusea2 (7 40) pulledl6 irf rpfusea3 (7 50) pulledl6 irf rpfuseb1 (7 1:05) pulledl7 irf rpfuseb2 (7 1:15) pulledl7 irf rpfuseb3 (7 1:30) pulledl7 irf rpfuseb4 (7 1:45) pulledl7 ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 21 of 26 Rev. 01 (11/02)
  1. Event Trigger 8 jumpers MSIV -59 GP 1 and offgas HI HI rad isolations.

trgset 8 "0"l6 irf ci59jp (8) inl6 irf ogogjp (8) inl6

  1. Event Trigger 9 closes CRD 25 valve.

trgset 9 "0"l6 irf rd25pos (9) 0.0l6

  1. Event Trigger 11 vents the scram air header.

trgset 11 "0"l10 irf rdscrair (11) openl10

  1. END ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 22 of 26 Rev. 01 (11/02)

Date: TODAY Unit 2 Turnover ECCS Status: All Online Information Shutdown Information 130 MWe MODE 1 Time to Boil: N/A Online Risk: Green CDF: 1.00 Shutdown Risk: N/A Risk Equipment: Protected Path: N/A Unit 2 Priorities Station Priorities Continue startup LCORAs LCORA # Start Title Clock Ends Shift 1 Activities (X = Completed) Shift 2 Activities Shift 3 Activities Continue Power Ascension Common Unit Activities Shift 1 Activities (X = Completed) Shift 2 Activities Shift 3 Activities Common Unit Procedures / Surveillances in Progress Unit 2 Conditions, Status, Abnormalities 2 hr ago 0500 IRM 15 OOS due to power supply failure. IMD waiting for replacement power supply to arrive from Quad Cities Station. Placed in DEL for tracking.

6 hr ago 5650 2B EHC pump OOS due to a problem with its pressure compensator. Expected BIS next shift.

Compensatory Actions, Extra Checks ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 23 of 26 Rev. 01 (11/02)

Equipment OOS Service Unit Status 2 hr ago 990045654 IRM 15 9 days ago 2A Cond Demin Cut In 6 hr ago 990045652 2B EHC pump 7 days ago 2B Cond Demin Cut In 16 days ago 2C Cond Demin Cut In 2 days ago 2D Cond Demin Cut Out 11 days ago 2E Cond Demin Cut Out 6 days ago 2F Cond Demin Cut Out 2 days ago 2G Cond Demin Cut Out 376 days ago 2A RWCU Cut In 240 days ago 2B RWCU Cut Out 20 days ago 2C RWCU Cut Out 76 days ago U2 FPC Demin Cut In Unit 2 Abnormal Component Position U2 Open Operability Determinations with Compensatory Actions Events and Misc. Information DGP 01-01 in progress. Transfer Aux Power per DGP 01-01. Then continue startup with rod moves. The QNE is present in the control room.

DW samples:

-13 Iodine 131 2.5 X 10

-11 Beta/Gamma 1.5 X 10 ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 24 of 26 Rev. 01 (11/02)

Date: TODAY Unit 3 Turnover ECCS Status: All available Online Information Shutdown Information 910 MWe MODE 1 Time to Boil: N/A Online Risk: Green Shutdown Risk: N/A Risk Equipment: None Protected Path: N/A Unit 3 Priorities Station Priorities Continue full power operation LCORAs LCORA # None Start Title Clock Ends Shift 1 Activities (X = Completed) Shift 2 Activities Shift 3 Activities Common Unit Activities Shift 1 Activities (X = Completed) Shift 2 Activities Shift 3 Activities Common Unit Procedures / Surveillances in Progress None Unit 3 Conditions, Status, Abnormalities IMD taking voltage readings in the EHC Control Panel 903-31.

Compensatory Actions, Extra Checks None Equipment OOS Service Unit Status None 5 days ago 3A Cond Demin Cut In 8 days ago 3B Cond Demin Cut In 10 days ago 3C Cond Demin Cut In 5 days ago 3D Cond Demin Cut In 3 days ago 3E Cond Demin Cut In 15 days ago 3F Cond Demin Cut In 3 days ago 3G Cond Demin Cut In 750 days ago 3A RWCU Cut In 390 days ago 3B RWCU Cut Out 60 days ago 3C RWCU Cut Out 444 days ago U3 FPC Demin Cut In ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 25 of 26 Rev. 01 (11/02)

Unit 3 Abnormal Component Position None U3 Open Operability Determinations with Compensatory Actions None Events and Misc. Information None ILT 01-1 NRC RE-EXAM, Scenario ILT-R-1 Page 26 of 26 Rev. 01 (11/02)