Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02346049331 December 2002Analysis of Capsule U from American Electric Power Company D.C. Cook Unit 1 Reactor Vessel Radiation Surveillance Program
ML02346058731 December 2002Evaluation of Pressurized Thermal Shock for D.C. Cook Unit 1 for 40 Years & 60 YearsHydrostatic
Exemption Request
ML02346050331 December 2002Heatup & Cooldown Limit Curves for Normal Operation for 40 Years & 60 YearsAnticipated operational occurrence
Hydrostatic
Press Release-02-146, NRC Approves Power Uprate for D.C. Cook Nuclear Plant24 December 2002Press Release-02-146: NRC Approves Power Uprate for D.C. Cook Nuclear Plant
ML02347012620 December 2002Amendment 273 to License DPR-58, Increasing Licensed Reactor Core Power Level by 1.66 PercentSafe Shutdown
Boric Acid
Shutdown Margin
Hydrostatic
Earthquake
Fire Protection Program
Power change
Coast down
ML02353003120 December 2002DC Cook, Units 1 and 2 - Letter Regarding Request for Withholding Information from Public Disclosure
ML03008005320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal ScheduleAnticipated operational occurrence
Hydrostatic
Nondestructive Examination
ML02360011920 December 2002Technical Specifications Pages for Amendment 273 to License DPR-58Safe Shutdown
Hydrostatic
Fire Protection Program
ML03008004320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal Schedule
ML02352003313 December 2002November 2002 Monthly Operating Report for Donald C. Cook Units 1 & 2
ML02346045810 December 2002License Amendment Request for Unit 1 Reactor Coolant System Pressure - Temperature Curves, & Request for Exemption from Requirements in 10 CFR 50.60(a) & 10 CFR 50, Appendix GHydrostatic
Exemption Request
ML02345007110 December 2002Acknowledgment That Final Significance Determination Will Not Be AppealedSignificance Determination Process
ML0301606809 December 2002NRC Office of Investigations Report No. 3-2001-037, D.C. Cook
ML0300602369 December 2002Ro/Sro Initial Examination December 2002Boric Acid
Packing leak
Grab sample
Stroke time
Enforcement Discretion
Deep Dose Equivalent
Continuous fire watch
TAC:MB67516 December 2002
ML0234402106 December 2002Submittal of Change Sheet 2 to Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture - Power Uprate Request
ML0414605544 December 2002OI-3-2001-051, D.C. Cook, Release of OI Synopsis
ML02340024029 November 2002OI-3-2001-048, D.C. Cook, Release of OI Synopsis
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
TAC:MB395526 November 2002
ML02333040126 November 2002Tech Spec Pages for License Amendment 253, TS 3.4.2, Safety Valves - Shutdown, and TS 3.4.2, Safety Valves -Operating.
ML02333039726 November 2002Tech Spec Pages for License Amendment 272, TS 3.4.2, Safety Valves - Shutdown, and TS 3.4.2, Safety Valves -Operating.
ML02333038926 November 2002National Pollutant Discharge Elimination System and Groundwater Discharge Authorization Spill NotificationBiofouling
ML02304008226 November 2002License Amendment, TS 3.4.2, Safety Valves - Shutdown, and TS 3.4.2, Safety Valves -Operating.Probabilistic Risk Assessment
ML02337036925 November 2002GFE Registration Letter - February 2003 ExaminationGeneric Fundamentals Examination
ML02309018019 November 2002DC Cook, Units 1 and 2, RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Pressure Boundary Leakage
ML02322057315 November 2002Response to NRC Requests for Additional Information Regarding Proposed License Amendment for Unit 2 Reactor Coolant System Pressure-Temperature Curves, & Request for Exemption from Requirements in 10 CFR 50
ML02322018715 November 2002October 2002 Monthly Operating Report for Donald C Cook
ML02325030715 November 2002License Amendment Request for Appendix K Measurement Uncertainty Recapture - Power Uprate RequestSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Fuel cladding
Fire Protection Program
Power change
Flow Induced Vibration
ML02325001815 November 2002Submittal of Change to Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture - Power Uprate Request
ML02318078114 November 2002Withholding from Public Disclosure, Values Associated with the Departure from Nucleate Boiling Ratio During a Reactor Coolant Pump Locked Rotor Event Analyses
ML02298061914 November 2002DC Cook, Units 1 and 2, License Amendments, Replace Current Accident Source Term Used in Design-Basis Radiological Analyses for Control Room Habitability with Alternative Source Term (AST) Pursuant to 10 CFR 50.67, Accident Source TermFuel cladding
ML02324033414 November 2002Technical Specifications, Replace Current Accident Source Term Used in Design-Basis Radiological Analyses for Control Room Habitability with Alternative Source Term (AST) Pursuant to 10 CFR 50.67, Accident Source Term
ML02324034314 November 2002Technical Specifications, Replace Current Accident Source Term Used in Design-Basis Radiological Analyses for Control Room Habitability with Alternative Source Term (AST) Pursuant to 10 CFR 50.67, Accident Source Term
TAC:MB531814 November 2002
ML02319015213 November 2002Second Supplement to License Amendment Request Regarding Control Room Habitability
ML02317052411 November 2002Response to Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for One-Time Extension of Containment Integrated Leakage Rate Test IntervalProbabilistic Risk Assessment
Large early release frequency
Moisture barrier
ML0231704098 November 2002National Pollutant Discharge Elimination System Permit Noncompliance Notification
ML0231702338 November 2002Emergency Plan, Revision 17a
ML0231204978 November 2002Notice of Enforcement Discretion for Indiana Michigan Power Company Regarding D.C. Cook, Unit 2 (NOED 02-3-058)Enforcement Discretion
ML0231204497 November 2002Second Request for Additional Information Regarding License Amendment Request, Power Uprate Measurement Uncertainty Recapture.
ML0231200136 November 2002Request for Notice of Enforcement Discretion from Technical Specification 3.9.1.1 Limiting Condition for Operation for the Cd Emergency Diesel GeneratorSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
ML0230905581 November 2002Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002Generic Fundamentals Examination
ML0230801791 November 2002Meeting with Ice Condenser Users Group Regarding Review of Topical Report ICUG-001 and TS Change TSFT-429 Sequoyah, Watts Bar, D.C.Cook, McGuire and Catawba
ML02301064131 October 2002Request for Additional Information Regarding License Amendment Request, One-Time Extension of Integrated Containment Leak Rate Test Interval, Dated April 11, 2002
IR 05000315/200200628 October 2002IR 05000315-02-006(DRP) & IR 05000316-02-006(DRP), on 07/01- 09/30/2002, D.C. Cook Nuclear Plant, Units 1 and 2 of Event Follow-up to Public Radiation Safety. Violation Noted & Considered as Unresolved Item Pending Final Safety SignificanceTime of Discovery
Packing leak
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Zebra Mussel
Locked High Radiation Area
Significance Determination Process
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Operability Determination
License Renewal
Maintenance Rule Program
Power change
Downpower
ML02268014922 October 2002Completion of Licensing Action for Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.Loop seal
Coast down
ML02297003022 October 2002Emergency Plan, Revision 18
ML02336023817 October 2002Submittal of Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture Power Uprate Request