Letter Sequence RAI |
---|
|
|
MONTHYEARML0224202212002-09-0505 September 2002 DC Cook, Units 1 and 2 - Review Regarding License Amendment Request, One-Time Extension of Containment Integrated Leakage Rate Testing, Dated April 11, 2002 Project stage: Other ML0230106412002-10-31031 October 2002 Request for Additional Information Regarding License Amendment Request, One-Time Extension of Integrated Containment Leak Rate Test Interval, Dated April 11, 2002 Project stage: RAI ML0231705242002-11-11011 November 2002 Response to Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for One-Time Extension of Containment Integrated Leakage Rate Test Interval Project stage: Request ML0301603302003-02-25025 February 2003 License Amendment, Re Interval Between Integrated Leakage Rate Tests Project stage: Other 2002-11-11
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
October 31, 2002 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST, "ONE TIME EXTENSION OF INTEGRATED CONTAINMENT LEAK RATE TEST INTERVAL," DATED APRIL 11, 2002 (TAC NOS. MB4837 AND MB4838)
Dear Mr. Bakken:
By application dated April 11, 2002, the Indiana Michigan Power Company submitted a license amendment request that would revise the Technical Specifications (TSs) for the Donald C. Cook Nuclear Plant, Units 1 and 2, to revise the surveillance requirements for containment leakage rate testing in TS 4.6.1.2 to allow a one-time extension of the interval between integrated leakage rate tests from 10 to 15 years.
The Nuclear Regulatory Commission (NRC) staff has reviewed your April 11, 2002, application, and concluded that it does not provide technical information in sufficient detail to enable the staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety. Enclosed is the NRC staffs request for additional information (RAI).
The draft RAI was e-mailed to your staff to facilitate conference calls held October 1, 9 and 15, 2002, with Mr. Joe Waters, et. al., of your staff regarding the RAI. The enclosed RAI is similar in content to the draft RAI that was e-mailed to your staff. A mutually agreeable target date of November 8, 2002, for your response was established. The NRC staff will continue reviewing your application when your response to the enclosed RAI is received.
A. Bakken, III If circumstances result in the need to revise that target date, please contact me at (301) 415-1345.
Sincerely,
/RA/
John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
Request for Additional Information cc w/encl: See next page
ML023010641 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JStang THarris LRaghavan DATE 10/31/02 10/31/02 10/31/02 REQUEST FOR ADDITIONAL INFORMATION D.C. COOK NUCLEAR PLANT, UNITS 1, 2 ONE TIME EXTENSION OF INTEGRATED CONTAINMENT LEAK RATE TEST INTERVAL Based on the NRC staff review of the proposed license amendment, dated April 11, 2002, the following information is required to allow the NRC staff to make an independent assessment:
- 1. Based on the review of the proposed license amendment, the NRC staff understands that you are using the 1992 Edition and the 1992 Addenda of Subsections IWE and IWL of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. Reference 1 also describes the findings of corrosion and thru-wall hole in the liner plate of Unit 2 containment. In addressing containment inspection history, you indicate that there are no areas that require augmented examination. Please provide justification for not identifying the areas of the degraded liner plates and penetrations (accepted by engineering evaluation), and other suspect areas not requiring additional examination (as per IWE-2430), or augmented examination (as per IWE-1240) during the subsequent inspection periods.
- 1. Please provide the following information related to the finding of the through-wall hole in the Unit 2 liner plate:
- a. Please provide location (elevation, azimuth), liner thickness, nearness to discontinuity areas (i.e. areas that would be subjected to bending under the postulated loadings, or thickness transition), size of the opening made to remove the wire brush, and corrective actions taken to ensure the integrity of the liner plate.
- b. You postulate that the through-liner hole was due to the inadequate repair of the liner hole drilled in error during construction. How did you verify that there are no such holes and repairs in other areas, and in the uninspectable areas of the containment liners in both Unit 1 and Unit 2?
- c. Investigation of other incidents of such through-wall hole in liner plates indicated the cause to be corrosion induced by the foreign elements stuck in the containment concrete. It appears that the Unit 2 through-wall hole in the liner was due to similar reason. In the 1992 integrated leak rate test (ILRT), the corrosion had not propagated to the extent that the ILRT would fail. However, if the ILRT were performed prior to this finding, the containment leakage rate could have been unacceptable. Please provide specific discussion of this potential for each unit at D.C. Cook.
- d. Recognizing the discussion in b, and c above, please provide justification for not performing ILRT after the through-liner hole finding, or in accordance with the present technical specification requirement.
- 3. Please provide a summary of findings of the examination of containment concrete performed in accordance with 10 CFR 50.55a and Subsection IWL including the acceptance criteria used for accepting concrete and reinforcing bar degradation.
ENCLOSURE
- 4. Inspections of some reinforced and steel containments (e.g., North Anna, Brunswick, D. C. Cook, Oyster Creek) have indicated degradation from the uninspectable side of the liner/steel shell of primary containments. The major uninspectable areas of the ice condenser containment include those behind the ice baskets and part of the shell (liner) embedded in the basemat. Please provide information as to how potential leakage due to age related degradation from these uninspectable areas are factored into the risk assessment in support of the requested ILRT interval extension.
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III Drinking Water and Radiological U.S. Nuclear Regulatory Commission Project Division 801 Warrenville Road Michigan Department of Lisle, IL 60532-4351 Environmental Quality 3423 N. Martin Luther King Jr. Blvd.
Attorney General P. O. Box 30630, CPH Mailroom Department of Attorney General Lansing, MI 48909-8130 525 West Ottawa Street Lansing, MI 48913 Scot A. Greenlee Director, Nuclear Technical Services Township Supervisor Indiana Michigan Power Company Lake Township Hall Nuclear Generation Group P.O. Box 818 500 Circle Drive Bridgman, MI 49106 Buchanan, MI 49107 U.S. Nuclear Regulatory Commission David A. Lochbaum Resident Inspectors Office Union of Concerned Scientists 7700 Red Arrow Highway 1616 P Street NW, Suite 310 Stevensville, MI 49127 Washington, DC 20036-1495 David W. Jenkins, Esquire Michael J. Finissi Indiana Michigan Power Company Plant Manager One Cook Place Indiana Michigan Power Company Bridgman, MI 49106 Nuclear Generation Group One Cook Place Mayor, City of Bridgman Bridgman, MI 49106 P.O. Box 366 Bridgman, MI 49106 Joseph E. Pollock Site Vice President Special Assistant to the Governor Indiana Michigan Power Company Room 1 - State Capitol Nuclear Generation Group Lansing, MI 48909 One Cook Place Bridgman, MI 49106