Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-0220 December 2022Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02
ML22342B1402 December 202256252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors
ML22335A4801 December 2022NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505
ML22336A0201 December 2022NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2
ML22300A20830 November 2022Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Tornado Missile Protection
Large early release frequency
ML22332A52929 November 2022Notification of NRC Initial Operator Licensing Examination 05000382/2023301
IR 05000382/202201328 November 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013Past operability
Anchor Darling
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Earthquake
Power-Operated Valves
Weak link
PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet4 November 2022Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet
ML22329A0152 November 2022NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505Probabilistic Risk Assessment
Large early release frequency
IR 05000382/20220021 November 2022Revised Integrated Inspection Report 05000382/2022002Boric Acid
High winds
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Stroke time
Weld Overlay
Enforcement Discretion
Met Tower
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Spent Fuel Pool Instrumentation
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Substantial potential for overexposure
Substantial potential for an overexposure
Downpower
Overexposure
W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability1 November 2022Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point VulnerabilitySurveillance Frequency Control Program
ML22300A1031 November 2022Integrated Inspection Report 05000382/2022003Internal Flooding
Functionality Assessment
Fire Protection Program
W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 3727 October 2022Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37
ML22299A22126 October 2022Topical Report CENPD-289-P-A Supplement 1, Use of Inert Replacement Rods in CE 16x16 Next Generation Fuel (Ngf)
IR 05000382/202240224 October 2022NRC Security Inspection Report 05000382 2022402
ML22290A04413 October 2022December 2022 Emergency Preparedness Program Inspection - Request for Information
W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-50513 October 2022Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505Safe Shutdown
W3F1-2022-0058, Reply to a Notice of Violation; EA-22-03312 October 2022Reply to a Notice of Violation; EA-22-033
ML22271A75029 September 2022Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point VulnerabilitySurveillance Frequency Control Program
ML22266A06229 September 2022Entergy Fleet Submittals - Project Manager Reassignment
PMNS20220993, Notice of Meeting with Entergy Operations, Inc. Regarding Waterford Steam Electric Station, Unit 329 September 2022Notice of Meeting with Entergy Operations, Inc. Regarding Waterford Steam Electric Station, Unit 3
ML22272A52828 September 202221040 Letter - OI Closure to Licensee - Discrimination
IR 05000382/202201216 September 2022Digital Instrumentation and Control Modification Inspection Report 05000382/2022012Cyber Security
IR 05000382/202240314 September 2022NRC Security Inspection Report 05000382 2022403Safeguards Contingency Plan
ML22270A08113 September 2022News Release-IV-22-012: NRC Finalizes White Finding at the Waterford Nuclear Power Plant
IR 05000382/202209012 September 2022Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter, NRC Insp Rprt 05000382/2022090Significance Determination Process
Preliminary White Finding
IR 05000382/202201024 August 2022Biennial Problem Identification and Resolution Inspection Report 05000382/2022010
ML22229A53623 August 2022Inspection Plan Transmittal Letter-2022 Mid-Cycle-FinalFitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Power-Operated Valves
COVID-19
W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-50519 August 2022Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505Internal Flooding
Probabilistic Risk Assessment
Cyber Security
ML22224A24619 August 2022Entergy Slides for Regulatory Conference (Enc 3)Fuel cladding
ML22224A24319 August 2022Regulatory Conference Participant List July 29 2022 (No Numbers) (Enc 1)
ML22229A06617 August 2022Security Baseline Inspection Report 05000382/2022403
ML22217A1119 August 2022Integrated Inspection Report 05000382/2022002Boric Acid
High winds
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Stroke time
Weld Overlay
Enforcement Discretion
Met Tower
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Substantial potential for an overexposure
Downpower
Coast down
W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 248 August 2022Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24Temporary Modification
ML22215A1493 August 2022NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2Probabilistic Risk Assessment
Large early release frequency
ML22215A2063 August 2022NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date UpdateProbabilistic Risk Assessment
Large early release frequency
ML22234A16031 July 2022Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431
ML22217A00829 July 2022Regulatory Conference - NRC Slides (Enc 2)Significance Determination Process
ML22217A00729 July 2022NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022COVID-19
Fuel cladding
Preliminary White Finding
ML22206A01722 July 2022NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505Probabilistic Risk Assessment
ML22206A01521 July 2022NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems
ML22215A21120 July 2022News Release-IV-22-011: NRC Schedules a Regulatory Conference with Entergy OperationsCoronavirus
ML22194A90120 July 2022Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2Shutdown Margin
Packing leak
Anticipated operational occurrence
PMNS20220738, Notice of Public Meeting, Licensee: Entergy Operations, Inc., Facility: Waterford Steam Electric Station, Unit 318 July 2022Notice of Public Meeting, Licensee: Entergy Operations, Inc., Facility: Waterford Steam Electric Station, Unit 3Coronavirus
ML22209A10815 July 2022NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2Probabilistic Risk Assessment
ML22194A88115 July 2022Notice of Public Meeting Licensee Entergy Operations Inc Facility Waterford Steam Electric Station Unit 3 Date and Time Friday July 29 2022 9 00am 12 00pm CSTPandemic
Coronavirus
IR 05000382/202201114 July 2022License Renewal Phase 1 Inspection Report 05000382/2022011Boric Acid
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Nondestructive Examination
Aging Management
License Renewal
Dissimilar Metal Weld
ML22187A03611 July 2022Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2022013) and Request for InformationStroke time
Power-Operated Valves
ML22153A4458 July 2022Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power YearsAnticipated operational occurrence
W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days6 July 2022SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days