Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22297A14622 December 2022Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Squib
FLEX
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
ML22356A11922 December 2022E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 09/27/2022
ML22356A11822 December 2022E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 08/15/2022
ML22355A20821 December 2022NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LARIncorporated by reference
IR 05000321/202242016 December 2022Cover Letter - Edwin I. Hatch Nuclear Plant, Units 1 & 2 Security Baseline Inspection Report 05000321/2022420 and 05000366/2022420Affidavit
ML23006A02513 December 2022NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request
ML22341A1216 December 2022NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022
NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable30 November 2022Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump InoperableSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Time Critical Operator Action
Maintenance Rule Program
Fuel cladding
IR 05000321/202240428 November 2022Security Baseline Inspection Report 05000321/2022404 and 05000366/2022404Affidavit
ML22325A34723 November 2022Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297Fire Protection Program
NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program18 November 2022Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection ProgramCyber Security
Fire Protection Program
ML22320A07217 November 2022Regulatory Audit in Support of Review of the Application to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure StudsIncorporated by reference
ML23026A23716 November 20222023001 Hatch RP RFI FinalHigh Radiation Area
Locked High Radiation Area
Surveillance Frequency Control Program
ML22333A04610 November 2022Marsh USA, Inc., Certificate of Liability Insurance
IR 05000366/20220038 November 2022Integrated Inspection Report 05000321 /2022003 and 05000366/2022003Safe Shutdown
Ultimate heat sink
Internal Flooding
Hydrostatic
Temporary Modification
Emergency Lighting
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
ML22293A0307 November 2022Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227)Reactor Vessel Water Level
Surveillance Frequency Control Program
ML22305A7031 November 2022NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR
IR 05000321/202240331 October 2022Security Baseline Inspection Report 05000321/2022403 and 05000366/2022403Affidavit
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
IR 05000321/202240128 October 2022Material Control and Accounting Program Inspection Report 05000321/2022401 and 05000366/2022401 Cover LetterAffidavit
NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-0227 October 2022Supplement to Authorized Relief Request HNP-ISI-RR-05-02Finite Element Analysis
NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .27 October 2022Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .Reactor Vessel Water Level
NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .14 October 2022Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .
NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b30 September 2022Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHigh Radiation Area
ML22258A15315 September 2022NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120)
ML22251A1328 September 2022NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR
ML22243A1917 September 2022Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs
ML22192A1172 September 2022Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage RatesHigh Radiation Area
Squib
Surveillance Frequency Control Program
Fire Protection Program
NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 231 August 2022Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2
ML22236A64731 August 2022Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi AccidentUnanalyzed Condition
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
IR 05000321/202200523 August 2022Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes19 August 2022Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, ModesWeld Overlay
Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
Liquid penetrant
NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program19 August 2022Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection ProgramFire Barrier
Fire Protection Program
ML22192A19919 August 2022Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingFire Protection Program
NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten18 August 2022Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ExtenSafe Shutdown
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Large early release frequency
NL-22-0672, Registration of Spent Fuel Cask Use17 August 2022Registration of Spent Fuel Cask Use
IR 05000321/20220023 August 2022Integrated Inspection Report 05000321/2022002 and 05000366/2022002Internal Flooding
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Fire Protection Program
ML22213A0501 August 20222022 Requalification Program Inspection Notification Letter - Hatch Nuclear Station
ML22210A05329 July 2022Project Manager Assignment
ML22209A18728 July 2022Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides)Pressure and Temperature Limits Report
Liquid penetrant
ML22208A13326 July 2022NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR
ML22207B85325 July 2022NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LARFire Barrier
PMNS20220741, Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Future License Amendment Request (LAR) for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch)22 July 2022Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Future License Amendment Request (LAR) for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch)
ML22200A04322 July 2022Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch NuclearSafe Shutdown
Ultimate heat sink
NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use21 July 2022and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use
IR 05000321/202240219 July 2022Security Baseline Inspection Report 05000321/2022402 and 05000366/2022402
NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 202114 July 2022Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021
IR 05000321/202201113 July 2022Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011Safe Shutdown
Time Critical Operator Action
Fire Protection Program
ML22186A0027 July 2022Audit Summary for License Amendment Request to Adopt Risk-Informed Extended Completion Times RITSTF Initiative 4BInternal Flooding
Probabilistic Risk Assessment
FLEX
Open Phase Condition
NL-22-0499, Registration of Spent Fuel Cask Use27 June 2022Registration of Spent Fuel Cask Use