Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22297A146 | 22 December 2022 | Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS | Safe Shutdown Reactor Vessel Water Level High Radiation Area Ultimate heat sink Water Inventory Control Internal Flooding Probabilistic Risk Assessment Squib FLEX Surveillance Frequency Control Program Large early release frequency Maintenance Rule Program Offsite Circuit Fire Protection Program |
ML22356A119 | 22 December 2022 | E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 09/27/2022 | |
ML22356A118 | 22 December 2022 | E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 08/15/2022 | |
ML22355A208 | 21 December 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR | Incorporated by reference |
IR 05000321/2022420 | 16 December 2022 | Cover Letter - Edwin I. Hatch Nuclear Plant, Units 1 & 2 Security Baseline Inspection Report 05000321/2022420 and 05000366/2022420 | Affidavit |
ML23006A025 | 13 December 2022 | NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request | |
ML22341A121 | 6 December 2022 | NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 | |
NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable | 30 November 2022 | Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable | Safe Shutdown High winds Ultimate heat sink Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Large early release frequency Time Critical Operator Action Maintenance Rule Program Fuel cladding |
IR 05000321/2022404 | 28 November 2022 | Security Baseline Inspection Report 05000321/2022404 and 05000366/2022404 | Affidavit |
ML22325A347 | 23 November 2022 | Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297 | Fire Protection Program |
NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program | 18 November 2022 | Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program | Cyber Security Fire Protection Program |
ML22320A072 | 17 November 2022 | Regulatory Audit in Support of Review of the Application to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs | Incorporated by reference |
ML23026A237 | 16 November 2022 | 2023001 Hatch RP RFI Final | High Radiation Area Locked High Radiation Area Surveillance Frequency Control Program |
ML22333A046 | 10 November 2022 | Marsh USA, Inc., Certificate of Liability Insurance | |
IR 05000366/2022003 | 8 November 2022 | Integrated Inspection Report 05000321 /2022003 and 05000366/2022003 | Safe Shutdown Ultimate heat sink Internal Flooding Hydrostatic Temporary Modification Emergency Lighting Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program |
ML22293A030 | 7 November 2022 | Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) | Reactor Vessel Water Level Surveillance Frequency Control Program |
ML22305A703 | 1 November 2022 | NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR | |
IR 05000321/2022403 | 31 October 2022 | Security Baseline Inspection Report 05000321/2022403 and 05000366/2022403 | Affidavit |
ML22301A174 | 28 October 2022 | Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) | |
IR 05000321/2022401 | 28 October 2022 | Material Control and Accounting Program Inspection Report 05000321/2022401 and 05000366/2022401 Cover Letter | Affidavit |
NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-02 | 27 October 2022 | Supplement to Authorized Relief Request HNP-ISI-RR-05-02 | Finite Element Analysis |
NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . | 27 October 2022 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . | Reactor Vessel Water Level |
NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . | 14 October 2022 | Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . | |
NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 30 September 2022 | Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | High Radiation Area |
ML22258A153 | 15 September 2022 | NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) | |
ML22251A132 | 8 September 2022 | NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR | |
ML22243A191 | 7 September 2022 | Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs | |
ML22192A117 | 2 September 2022 | Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates | High Radiation Area Squib Surveillance Frequency Control Program Fire Protection Program |
NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 | 31 August 2022 | Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 | |
ML22236A647 | 31 August 2022 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit |
IR 05000321/2022005 | 23 August 2022 | Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes | 19 August 2022 | Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes | Weld Overlay Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report Liquid penetrant |
NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program | 19 August 2022 | Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program | Fire Barrier Fire Protection Program |
ML22192A199 | 19 August 2022 | Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Fire Protection Program |
NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten | 18 August 2022 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten | Safe Shutdown Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Large early release frequency |
NL-22-0672, Registration of Spent Fuel Cask Use | 17 August 2022 | Registration of Spent Fuel Cask Use | |
IR 05000321/2022002 | 3 August 2022 | Integrated Inspection Report 05000321/2022002 and 05000366/2022002 | Internal Flooding Temporary Modification Functionality Assessment FLEX Operability Determination Fire Protection Program |
ML22213A050 | 1 August 2022 | 2022 Requalification Program Inspection Notification Letter - Hatch Nuclear Station | |
ML22210A053 | 29 July 2022 | Project Manager Assignment | |
ML22209A187 | 28 July 2022 | Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) | Pressure and Temperature Limits Report Liquid penetrant |
ML22208A133 | 26 July 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR | |
ML22207B853 | 25 July 2022 | NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR | Fire Barrier |
PMNS20220741, Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Future License Amendment Request (LAR) for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch) | 22 July 2022 | Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Future License Amendment Request (LAR) for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch) | |
ML22200A043 | 22 July 2022 | Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear | Safe Shutdown Ultimate heat sink |
NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use | 21 July 2022 | and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use | |
IR 05000321/2022402 | 19 July 2022 | Security Baseline Inspection Report 05000321/2022402 and 05000366/2022402 | |
NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 | 14 July 2022 | Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 | |
IR 05000321/2022011 | 13 July 2022 | Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011 | Safe Shutdown Time Critical Operator Action Fire Protection Program |
ML22186A002 | 7 July 2022 | Audit Summary for License Amendment Request to Adopt Risk-Informed Extended Completion Times RITSTF Initiative 4B | Internal Flooding Probabilistic Risk Assessment FLEX Open Phase Condition |
NL-22-0499, Registration of Spent Fuel Cask Use | 27 June 2022 | Registration of Spent Fuel Cask Use |