Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
BSEP 06-0136, Request for License Amendment, Technical Specification 3.4.1, Recirculation Loops Operating Recirculation Loop Operating Requirements.21 December 2006Request for License Amendment, Technical Specification 3.4.1, Recirculation Loops Operating Recirculation Loop Operating Requirements.Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML06362021118 December 2006E-Mail: NRC Review of LRA for Vermont Yankee Station - (PA)License Renewal
Earthquake
ML06346044013 December 2006Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050)
ML0711000068 December 2006Operational Safety Review Team (Osart) Mission and Follow-up Visit ReportSafe Shutdown
Fitness for Duty
Fire Barrier
Water Inventory Control
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Severe Accident Management Guideline
License Renewal
Earthquake
Fire Watch
Power change
Siren
Power Uprate
Thermography
TAC:MD09565 December 2006
ML0633803175 December 2006Enclosure 1 - Addressee List
IR 05000324/200650117 November 2006IR 05000325-06-501, 05000324-06-501 on 11/06-11/09/2006 for Brunswick Steam Electric Plant, Units 1 and 2; Routine Baseline Emergency Preparedness Inspection
ML06324005916 November 2006Comment (4) Submitted by Progress Energy, Robert H. Kitchen, on Supplemental Proposed Rules Pr 2, 50, 51, and 52, Re Licenses, Certifications, and Approvals for Nuclear Power Plants
PNO-II-06-005, A -Unusual Event Declared Due to Loss of Offsite Power to Unit 2 4KV Emergency Buses (Update)6 November 2006PNO-II-06-005A -Unusual Event Declared Due to Loss of Offsite Power to Unit 2 4KV Emergency Buses (Update)
ML0630606272 November 2006PNO-II-06-005: Brunswick Steam Electric Plant, Unusual Event Declared Due to Loss of Offsite Power to Unit 2 4kV Emergency BusesReactor Vessel Water Level
IR 05000324/200600430 October 2006IR 05000325-06-004, 05000324-06-004, on 07/01/06 - 09/30/06, for Brunswick, Units 1 and 2, Problem Identification and ResolutionHigh Radiation Area
Offsite Dose Calculation Manual
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Annual Radiological Environmental Operating Report
Maintenance Rule Program
Fuel cladding
Fire Protection Program
Substantial potential for overexposure
Downpower
Overexposure
TAC:MB977920 October 2006
ML06250008720 October 2006NRC Receipt of Response to Generic Letter 2003-01 Control Room Habitability (Tac Nos. MB9779 and MB9780)
ML06220057419 October 2006Authorization for Use of Delta Protection Mururoa Single-Use, Supplied-Air Suits, Models V4 F1 and V4 Mth 2Mururoa
TAC:MD138419 October 2006
ML06277022719 October 2006Essential Fish Habitat Assessment for License Renewal of Brunswick Steam Electric Plant, Units 1 and 2License Renewal
Biofouling
Power Uprate
ML06291003918 October 2006Assessment Follow-Up-Brunswick, Units 1 and 2License Renewal
IR 05000324/200640111 October 2006IR 05000325-06-401 & IR 05000324-06-401, (Safeguards Removed) Brunswick Steam Electric PlantAffidavit
BSEP 06-0109, Response to NRC Regulatory Issue Summary 2006-15 Regarding Preparation and Scheduling of Operator Licensing Examinations11 October 2006Response to NRC Regulatory Issue Summary 2006-15 Regarding Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
BSEP 06-0102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors28 September 2006Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
BSEP 06-0067, Request for License Amendment, Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair28 September 2006Request for License Amendment, Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or RepairSafe Shutdown
Large early release frequency
Manual Operator Action
ML06262049415 September 2006Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed
BSEP 06-0101, Submittal of Technical Specification Bases Revisions14 September 2006Submittal of Technical Specification Bases Revisions
ML06264027213 September 2006Vermont Yankee Hearing - Entergy Exhibit 38, Chart at Page 7 of Prefiled Testimony
ML0625002531 September 2006Requalification Program Inspection - Brunswick Nuclear StationLicense Renewal
ML06243045731 August 2006Inspection/Activity Plan for 09/01/2006 - 03/31/2008
ML06243045331 August 2006Mid-Cycle Performance Review and Inspection Plan - Brunswick Steam Electric Plant, Cover LetterLicense Renewal
Power change
ML06249043229 August 2006Semi-Annual 10 CFR 26 Fitness for Duty Program Data for Period January 1, 2006 Through June 30, 2006Fitness for Duty
ML06230030428 August 2006Order Requiring Compliance with Key Radiological Protection Mitigation Strategies
BSEP 06-0095, Report of 10 CFR 50.59 Evaluation and Commitment Changes24 August 2006Report of 10 CFR 50.59 Evaluation and Commitment ChangesOffsite Dose Calculation Manual
Excess Flow Check Valve
Fire Watch
Power change
ML0622100889 August 2006Public Meeting Summary - Category One Management Meeting, Brunswick, Units 1 and 2License Renewal
Power change
Power Uprate
IR 05000324/20060073 August 2006IR 05000324-06-007 on 06/05/2006 - 07/05/2006 for Brunswick, Unit 2; Supplemental Inspection IP 95001 for a White Performance Indicator in the Initiating Events CornerstoneCondition Adverse to Quality
Through Wall Leak
Power change
Downpower
ML0622005032 August 2006Notification Change in Decommissioning Funding Method
ML0621305671 August 2006Summary of 07/19 - 07/20/2006 Meeting - 2006 Initial Exam Development WorkshopJob Performance Measure
BSEP 06-0075, Groundwater Questionnaire28 July 2006Groundwater QuestionnaireOffsite Dose Calculation Manual
IR 05000324/200600328 July 2006IR 05000325-06-003 and 05000324-06-003, on 04/01/2006 - 06/30/2006, Brunswick, Units 1 and 2, Equipment AlignmentUltimate heat sink
Internal Flooding
Hydrostatic
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Fuel cladding
Fire Protection Program
Power change
Downpower
BSEP 06-0074, Relief Request RR-38, Pressure Testing of Drain, Vent, and Fill Lines within the Reactor Coolant Pressure Boundary18 July 2006Relief Request RR-38, Pressure Testing of Drain, Vent, and Fill Lines within the Reactor Coolant Pressure BoundaryHydrostatic
VT-2
Excess Flow Check Valve
BSEP 06-0073, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines18 July 2006Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines
ML06216058014 July 2006Notification of Inspection and Request for InformationMet Tower
License Renewal
BSEP-06-0048, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines11 July 2006Notification of Deviation from Boiling Water Reactor Vessel and Internals Project GuidelinesEVT-1
ML0618700745 July 2006and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial ExaminationJob Performance Measure
License Renewal
ML06186038130 June 2006Operations Center Event Report, Defective Paperless Data Acquisition Recorders.
Press Release-06-085, NRC Renews Operating Licenses for Brunswick Steam Electric Plant for an Additional 20 Years26 June 2006Press Release-06-085: NRC Renews Operating Licenses for Brunswick Steam Electric Plant for an Additional 20 YearsLicense Renewal
ML06166037526 June 2006Renewed Facility Operating License No. DPR-71Safe Shutdown
Safeguards Contingency Plan
License Renewal
Offsite Circuit
Fire Protection Program
Power Uprate
ML06166038126 June 2006Federal Register Notice Notice of Issuance of Renewed Facility Operating Licenses for Additional 20-year PeriodLicense Renewal
ML06166035826 June 2006Issuance of Renewed Facility Operating License Nos. DPR-71 and DPR-62, Brunswick Ltr. to James ScarolaLicense Renewal
BSEP-06-0066, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report26 June 2006Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity ReportThrough Wall Leak
ML06192047826 June 2006Comment (1) of Heinz J. Mueller on Final Generic Supplemental Environmental Impact Statement (Fgseis) for Brunswick, Units 1 & 2 License Renewal, Supplement 25License Renewal