Brunswick Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 16:18:03 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 3
PSB1-RP
- RP PUBLIC BASELINE INSPECTION Baseline Inspections 08/28/2006 09/01/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/28/2006 09/01/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/28/2006 09/01/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 08/28/2006 09/01/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/28/2006 09/01/2006 1, 2 71151 IP Performance Indicator Verification 3
PS2-EP
- EP EXERCISE Baseline Inspections 11/06/2006 11/10/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 11/06/2006 11/10/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/06/2006 11/10/2006 1, 2 71151 IP Performance Indicator Verification 2
- REQUAL INSPECTION Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111111B IP Licensed Operator Requalification Program 1
EB3-HS
- HEAT SINK Baseline Inspections 12/04/2006 12/08/2006 1, 2 7111107B IP Heat Sink Performance 4
- PROBLEM IDENTIFICATION & RESOLUTION - BI Baseline Inspections 02/05/2007 02/09/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/19/2007 02/23/2007 1, 2 71152B IP Identification and Resolution of Problems 1
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 02/05/2007 02/07/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP-WK1 Baseline Inspections 03/12/2007 03/16/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/12/2007 03/16/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/12/2007 03/16/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/12/2007 03/16/2007 1, 2 71151 IP Performance Indicator Verification 1
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 03/19/2007 03/23/2007 2
7111108G IP Inservice Inspection Activities - BWR 3
PSB1-RP
- RP OCCUPATIONAL OCCUPATIONAL INSP-WK2 Baseline Inspections 03/26/2007 03/30/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/26/2007 03/30/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/26/2007 03/30/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/26/2007 03/30/2007 1, 2 71151 IP Performance Indicator Verification 1
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 06/24/2007 06/28/2007 1, 2 7111112B IP Maintenance Effectiveness This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Brunswick Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 16:18:03 Report 22 3
OL PREP
- INITIAL EXAM PREP Not Applicable 06/25/2007 06/29/2007 1
V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 4
OL EXAM
- INITIAL EXAM Not Applicable 07/16/2007 07/27/2007 1
V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 5
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 12/10/2007 12/14/2007 1, 2 7111121 IP Component Design Bases Inspection 1
PS2-EP
- EP INSP Baseline Inspections 12/03/2007 12/07/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 12/03/2007 12/07/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 12/03/2007 12/07/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 12/03/2007 12/07/2007 1, 2 71151 IP Performance Indicator Verification 1
PSB1-RP
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 01/14/2008 01/16/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
EB3-HS
- HEAT SINK Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111107B IP Heat Sink Performance 4
PSB1-RP
- RP PUBLIC BASELINE INSP Baseline Inspections 02/11/2008 02/15/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/11/2008 02/15/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/11/2008 02/15/2008 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 02/11/2008 02/15/2008 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 02/11/2008 02/15/2008 1, 2 71151 IP Performance Indicator Verification 1
EB3-ISI
- UNIT 1 - ISI Baseline Inspections 03/10/2008 03/14/2008 1
7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.