ML062500253

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Brunswick Nuclear Station
ML062500253
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/01/2006
From: Moorman J
Division of Reactor Safety II
To: Scarola J
Carolina Power & Light Co
References
Download: ML062500253 (7)


Text

September 1, 2006 Carolina Power and Light Company ATTN: Mr. J. Scarola Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - BRUNSWICK NUCLEAR STATION

Dear Mr. Scarola:

In a telephone conversation on August 29, 2006, Mr. Ronald F. Aiello, Senior Operations Engineer, and Mr. Tony Pearson, Requalification Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Brunswick Nuclear Station. The inspection is planned for the week of November 13, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination.

In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in the enclosure, in order to support the NRC's inspection program needs. Mr. Pearson has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

CP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Ronald F. Aiello at (404) 562-4641 or me at (404) 562-4647.

Sincerely,

/RA By Mark Bates For/

James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosure:

Materials Request List cc w/encl: (See next page)

OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA By MBates for/ /RA/

NAME RAiello MBates JMoorman BDesai DATE 8/31/06 9/1/06 9/1/06 8/31/06 E-MAIL COPY? YES NO YES NO YES NO YES NO YESNO YES NO YES NO CP&L 3 cc w/encl: John H. O'Neill, Jr.

T. P. Cleary, Director Shaw, Pittman, Potts & Trowbridge Site Operations 2300 N. Street, NW Brunswick Steam Electric Plant Washington, DC 20037-1128 Progress Energy Carolinas, Inc.

Electronic Mail Distribution Beverly Hall, Acting Director Division of Radiation Protection Benjamin C. Waldrep N. C. Department of Environment Plant Manager and Natural Resources Brunswick Steam Electric Plant Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution Chairman of the North Carolina Utilities Commission James W. Holt, Manager c/o Sam Watson, Staff Attorney Performance Evaluation and Electronic Mail Distribution Regulatory Affairs PEB 7 Carolina Power & Light Company Robert P. Gruber Electronic Mail Distribution Executive Director Public Staff NCUC Edward T. O'Neil, Manager 4326 Mail Service Center Training Raleigh, NC 27699-4326 Carolina Power & Light Company Brunswick Steam Electric Plant Public Service Commission Electronic Mail Distribution State of South Carolina P. O. Box 11649 Randy C. Ivey, Manager Columbia, SC 29211 Support Services Carolina Power & Light Company David R. Sandifer Brunswick Steam Electric Plant Brunswick County Board of Electronic Mail Distribution Commissioners P. O. Box 249 Garry D. Miller, Manager Bolivia, NC 28422 License Renewal Progress Energy Warren Lee Electronic Mail Distribution Emergency Management Director New Hanover County Department of Lenny Beller, Supervisor Emergency Management Licensing/Regulatory Programs P. O. Box 1525 Carolina Power and Light Company Wilmington, NC 28402-1525 Electronic Mail Distribution Jackie Gawron David T. Conley Training Manager Associate General Counsel - Legal Dept. Brunswick Steam Electric Plant Progress Energy Service Company, LLC P. O. Box 10429 Electronic Mail Distribution Southport, NC 28461-0429 James Ross Nuclear Energy Institute Electronic Mail Distribution

CP&L 4 Distribution w/encl:

B. Mozafari, NRR R. Franovich, NRR (Regulatory Conferences Only)

C. Evans (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC

Materials Request List The items listed below are being requested per telephone conversation on August 29, 2006, to support the upcoming IP-71111.11 inspection in November 2006 at the Brunswick Nuclear Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by October 30, 2006. Please have the items listed in paragraph "B" ready for our review upon arrival on November 13, 2006 A. In-office inspection material:

1. Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
2. A copy of the last biennial requal written examination (2RO/SRO exams) and all biennial re-takes.
3. List of personnel scheduled for requal testing the week of 11/13/06.
4. Copies of simulator scenarios for this exam (when available).
5. Program evaluation for the previous 2 years training cycle.
6. A list of all personnel that reactivated their licenses since the last requal inspection.
7. Simulator:

List of all open simulator discrepancies reports DRs.

Copy of the Simulator Management and Configuration Procedures.

List of all closed simulator discrepancies reports for last 12 months.

List of Simulator Performance tests.

B. On-site inspection material:

3. Condition Reports and LERs resulting from human performance errors since the last requal inspection.
2. All training feedback forms since the last requal inspection.
3. All remedial training packages since the last requal inspection.
4. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.
5. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.

2

6. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
7. All Medical Exam Records with a copy of the individuals licence attached (This can be pre-staged in medical).
8. Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
9. Copy of an Organizational Chart for the training department including the simulator group.
10. Complete list of all Licensed individuals complete with license restrictions.
11. Security procedures for the simulator.