Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11180111329 June 2011NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 1Safe Shutdown
Fire Barrier
Large early release frequency
Maintenance Rule Program
Fire Protection Program
Fire Watch
ML11182B05329 June 2011NRR E-mail Capture - HNP Supplement to Mur Power Uprate LAR
ML11206A49629 June 2011NRR E-mail Capture - Draft RAI Questions to Support Harris Mur Review (ME6169)Fire Protection Program
ML11174A14324 June 2011Closure Letter for the Licensee'S Response to Generic Letter 2008-01, Managing Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems
HNP-11-065, Supplement Information in Regard to Measurement Uncertainty Recapture Power Uprate License Amendment Request23 June 2011Supplement Information in Regard to Measurement Uncertainty Recapture Power Uprate License Amendment RequestSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Time to boil
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Aging Management
Process Control Program
Exemption Request
Fuel cladding
Fire Protection Program
Downpower
Flow Induced Vibration
ML11137A17422 June 2011Nuclear Generating Plant; H. B. Robinson Steam Electric Plant, 2; and Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding 2011 Decommissioning Funds
ML11168024016 June 2011Errata Shearon Harris Nuclear Plant NRC Office of Investigations Report 2-2010-019
IR 05000400/201040616 June 2011
ML11164A21316 June 2011Dam Safety Inspection Report for Auxiliary Reservoir Dam
ML11165A18610 June 2011NRR E-mail Capture - FW: Acceptance Review for Harris 1 Measurment Uncertainity Recapture (Mur) TAC ME6169
HNP-11-055, Day Response to NRC Bulletin 2011-01, Mitigating Strategies.6 June 2011Day Response to NRC Bulletin 2011-01, Mitigating Strategies.B.5.b Mitigating Strategies
TAC:ME64376 June 2011
ML1115303282 June 2011Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - RevisionSevere Accident Management Guideline
B.5.b Mitigating Strategies
ML1115403882 June 201108/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop
ML11151095931 May 2011IR 05000400-11-009 on August and September 2011, Shearon Harris - Notification of Conduct of a Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Fire Protection Program
HNP-11-046, Emergency Core Cooling System Evaluation Changes Annual Report23 May 2011Emergency Core Cooling System Evaluation Changes Annual Report
ML11143A10223 May 2011NRR E-mail Capture - LIC-109 Acceptance Review Regarding Indirect Transfer of Licensees (ME5970, ME5971, ME5972, ME5973, ME5974)
ML11137039717 May 2011Public Meeting Summary Letter Regarding Human Performance Improvement Plan
IR 05000400/201101013 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000400/2011010Safe Shutdown
Internal Flooding
Severe Accident Management Guideline
B.5.b Mitigating Strategies
ML11116A02012 May 2011April 12, 2011, Summary of Pre-Application Meeting with Carolina Power & Light Company and Florida Power Corporation, on Brunswick, Units 1 & 2, Crystal River, Unit 3, and H. B. Robinson, Unit 2Safe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Multiple Spurious Operation
ML11136A00812 May 2011NRR E-mail Capture - LIC-109 Acceptance Review Regarding Indirect Transfer of Licensees (ME5974)
ML1109805389 May 2011Cyber Security Plan Implementation ScheduleCyber Security
ML1113704089 May 2011Meeting Slides Regarding Human Performance ImprovementSafe Shutdown
TAC:ME63585 May 2011
HNP-11-045, 180-Day Steam Generator Tube Inspection Report5 May 2011180-Day Steam Generator Tube Inspection ReportNondestructive Examination
HNP-11-053, Transmittal of Technical Specifications Bases Revisions5 May 2011Transmittal of Technical Specifications Bases RevisionsBoric Acid
Shutdown Margin
TAC:ME616928 April 2011
HNP-11-001, Request for License Amendment, Measurement Uncertainty Recapture Power Uprate28 April 2011Request for License Amendment, Measurement Uncertainty Recapture Power UprateSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Time to boil
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Aging Management
Process Control Program
Exemption Request
Fuel cladding
Fire Protection Program
Power change
Flow Induced Vibration
IR 05000400/201100227 April 2011IR 05000400-11-002, on January 1, 2011 - March 31, 2011, Shearon Harris Nuclear Power Plant, Unit 1, Integrated Inspection ReportUltimate heat sink
Temporary Modification
VT-2
Job Performance Measure
Fire Protection Program
Power change
HNP-11-031, Annual Environmental (Nonradiological) Operating Report27 April 2011Annual Environmental (Nonradiological) Operating ReportBiofouling
ML11123A25927 April 2011Submittal of Annual Radiological Environmental Operating Report for 2010Offsite Dose Calculation Manual
Missed surveillance
Annual Radiological Environmental Operating Report
Chernobyl
HNP-11-032, Annual Radioactive Effluent Release Report for 201025 April 2011Annual Radioactive Effluent Release Report for 2010Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Tritium
Power change
ML11118048121 April 2011NFPA 805 Transition FAQ 10-0059, Rev 1Safe Shutdown
Fire Barrier
Large early release frequency
Maintenance Rule Program
Fire Protection Program
Fire Watch
ML11006044221 April 2011Relief Request I3R 06, Temporary Non-Code Repair of Service Water Supply System PipingTime of Discovery
Nondestructive Examination
Functionality Assessment
Through-Wall Leak
TAC:ME571921 April 2011
ML11073013821 April 2011February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides
ML11110002220 April 2011Meeting Summary Letter - Annual Assessment of Shearon Harris Nuclear Power Plant
ML11087206920 April 2011Federal Register Notice, Notice of Withdrawal of Application
ML11087206020 April 2011Transmittal Letter, Notice of Withdrawal of Application
ML11110002420 April 2011Meeting Summary - Shearon Harris - List of Attendees
ML11110002620 April 2011Meeting Summary - Shearon Harris - Slide Presentation
ML11060112020 April 2011Relief Request I3R-08, Temporary Non-Code Repair of Service Water Supply System PipingIncorporated by reference
NRC-2011-0093, Federal Register Notice, Notice of Withdrawal of Application20 April 2011Federal Register Notice, Notice of Withdrawal of Application
RA-11-008, Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums14 April 2011Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums
RA-11-011, Progress Energy - Response to Industry Generic Request for Additional Information on Carolina Power & Light Company and Florida Power Corporation Cyber Security Plant, Rev. 07 April 2011Progress Energy - Response to Industry Generic Request for Additional Information on Carolina Power & Light Company and Florida Power Corporation Cyber Security Plant, Rev. 0Safe Shutdown
Cyber Security
Offsite Circuit
Fire Protection Program
Press Release-II-11-017, NRC Schedules Meeting to Discuss 2010 Performance of Harris Nuclear Power Plant1 April 2011Press Release-II-11-017: NRC Schedules Meeting to Discuss 2010 Performance of Harris Nuclear Power PlantOpen House