Category:Annual Operating Report
MONTHYEARRA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.462022-04-27027 April 2022 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-21-0131, Annual Environmental (Non-radiological) Operating Report2021-04-27027 April 2021 Annual Environmental (Non-radiological) Operating Report RA-21-0051, Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H. B. Robinson Steam Electric Plant - Annual Report of Changes Pursuant to 10 CFR 50.462021-04-0505 April 2021 Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H. B. Robinson Steam Electric Plant - Annual Report of Changes Pursuant to 10 CFR 50.46 RA-20-0126, Annual Report of Changes Pursuant to 10 CFR 50.462020-05-27027 May 2020 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-18-0022, Carolinas, LLC (Duke Energy) - Annual Report of Changes Pursuant to 10 CFR 50.462018-05-24024 May 2018 Carolinas, LLC (Duke Energy) - Annual Report of Changes Pursuant to 10 CFR 50.46 HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 RA-17-0027, Duke Energy Carolinas, LLC - Annual Report of Changes Pursuant to 10 CFR 50.462017-05-25025 May 2017 Duke Energy Carolinas, LLC - Annual Report of Changes Pursuant to 10 CFR 50.46 RA-16-0025, Duke Energy Annual Report of Changes Pursuant to 10 CFR 50.462016-05-31031 May 2016 Duke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 HNP-15-031, Annual Environmental (Nonradiological) Operating Report for 20142015-04-27027 April 2015 Annual Environmental (Nonradiological) Operating Report for 2014 HNP-13-050, Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 20132013-06-0606 June 2013 Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 2013 HNP-13-030, Annual Radiological Environmental Operating Report for 20122013-04-19019 April 2013 Annual Radiological Environmental Operating Report for 2012 HNP-13-039, Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B2013-04-19019 April 2013 Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B HNP-12-035, Submittal of Annual Radioactive Effluent Release Report2012-04-16016 April 2012 Submittal of Annual Radioactive Effluent Release Report HNP-11-046, Emergency Core Cooling System Evaluation Changes Annual Report2011-05-23023 May 2011 Emergency Core Cooling System Evaluation Changes Annual Report ML11123A2592011-04-27027 April 2011 Submittal of Annual Radiological Environmental Operating Report for 2010 HNP-11-031, Annual Environmental (Nonradiological) Operating Report2011-04-27027 April 2011 Annual Environmental (Nonradiological) Operating Report HNP-11-032, Annual Radioactive Effluent Release Report for 20102011-04-25025 April 2011 Annual Radioactive Effluent Release Report for 2010 HNP-11-011, Annual Report in Accordance with Technical Specification 6.9.1.22011-02-0202 February 2011 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-10-043, Submittal of Annual Radiological Environmental Operating Report2010-04-27027 April 2010 Submittal of Annual Radiological Environmental Operating Report HNP-10-041, Annual Radioactive Effluent Release Report for 20092010-04-16016 April 2010 Annual Radioactive Effluent Release Report for 2009 HNP-09-040, Annual Radiological Environmental Operating Report for 20082009-04-28028 April 2009 Annual Radiological Environmental Operating Report for 2008 HNP-09-015, Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.22009-02-0202 February 2009 Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.2 ML0817101312008-06-12012 June 2008 Submittal of Report of Changes Pursuant to CFR 50.59 HNP-07-044, Annual Environmental (Non-Radiological) Operating Report for 20062007-04-24024 April 2007 Annual Environmental (Non-Radiological) Operating Report for 2006 HNP-06-027, Annual Report in Accordance with Technical Specification 6.9.1.22006-02-0202 February 2006 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-05-100, Annual Radiological Environmental Operating Amended Report2005-09-23023 September 2005 Annual Radiological Environmental Operating Amended Report ML0513003802005-05-0909 May 2005 Report of Changes Pursuant to 10 CFR 50.59 for May 18, 2003 - December 31, 2004 HNP-05-041, Transmittal of Annual Environmental (Non-Radiological) Operating Report for 20042005-04-15015 April 2005 Transmittal of Annual Environmental (Non-Radiological) Operating Report for 2004 HNP-05-016, Annual Operating Report - 20042005-02-16016 February 2005 Annual Operating Report - 2004 HNP-04-057, Annual Environmental (Non-Radiological) Operating Report2004-04-23023 April 2004 Annual Environmental (Non-Radiological) Operating Report HNP-04-014, Annual Operating Report - 20032004-02-24024 February 2004 Annual Operating Report - 2003 HNP-03-043, Annual Environmental Operating Report2003-04-22022 April 2003 Annual Environmental Operating Report HNP-03-017, Annual Operating Report - 20022003-02-19019 February 2003 Annual Operating Report - 2002 HNP-02-057, Annual Environmental (Non-Radiological) Operating Report for 20012002-04-23023 April 2002 Annual Environmental (Non-Radiological) Operating Report for 2001 HNP-02-016, Annual Operating Report for 20012002-02-19019 February 2002 Annual Operating Report for 2001 2024-04-25
[Table view] Category:Environmental Monitoring Report
MONTHYEARRA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0106, Annual Environmental (Non-Radiological) Operating Report2024-04-0909 April 2024 Annual Environmental (Non-Radiological) Operating Report RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0098, Annual Environmental (Nonradiological) Operating Report2023-04-19019 April 2023 Annual Environmental (Nonradiological) Operating Report RA-22-0136, Annual Environmental (Nonradiological) Operating Report2022-04-29029 April 2022 Annual Environmental (Nonradiological) Operating Report RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 20212022-04-27027 April 2022 Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 RA-21-0279, Notification of New NPDES Permit Receipt2021-10-14014 October 2021 Notification of New NPDES Permit Receipt RA-21-0131, Annual Environmental (Non-radiological) Operating Report2021-04-27027 April 2021 Annual Environmental (Non-radiological) Operating Report RA-20-0138, Annual Environmental (Non-Radiological) Operating Report for 20192020-04-30030 April 2020 Annual Environmental (Non-Radiological) Operating Report for 2019 RA-19-0191, Annual Environmental (Non-radiological) Operating-Report for 2018, Docket No. 50-400/Renewed License No. NPF-632019-04-25025 April 2019 Annual Environmental (Non-radiological) Operating-Report for 2018, Docket No. 50-400/Renewed License No. NPF-63 RA-19-0135, Annual Radioactive Effluent Release Report2019-04-24024 April 2019 Annual Radioactive Effluent Release Report HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-16-022, Annual Radiological Environmental Operating Report2016-04-29029 April 2016 Annual Radiological Environmental Operating Report HNP-16-023, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 HNP-16-024, Annual Environmental (Non-Radiological) Operating Report for 20152016-04-26026 April 2016 Annual Environmental (Non-Radiological) Operating Report for 2015 HNP-15-031, Annual Environmental (Nonradiological) Operating Report for 20142015-04-27027 April 2015 Annual Environmental (Nonradiological) Operating Report for 2014 HNP-15-030, Annual Radiological Environmental Operating Report for 20142015-04-27027 April 2015 Annual Radiological Environmental Operating Report for 2014 HNP-15-029, Annual Radioactive Effluent Release Report for 20142015-04-16016 April 2015 Annual Radioactive Effluent Release Report for 2014 HNP-14-039, Annual Environmental (Nonradiological) Operating Report2014-04-25025 April 2014 Annual Environmental (Nonradiological) Operating Report HNP-14-038, Annual Radiological Environmental Operating Report for 20132014-04-24024 April 2014 Annual Radiological Environmental Operating Report for 2013 HNP-13-039, Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B2013-04-19019 April 2013 Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B HNP-13-031, Flooding Hazard Reevaluation Report2013-03-12012 March 2013 Flooding Hazard Reevaluation Report HNP-12-034, Annual Environmental (Non-Radiological) Operating Report2012-04-25025 April 2012 Annual Environmental (Non-Radiological) Operating Report HNP-12-036, Submittal of Annual Radiological Environmental Operating Report2012-04-25025 April 2012 Submittal of Annual Radiological Environmental Operating Report HNP-12-035, Submittal of Annual Radioactive Effluent Release Report2012-04-16016 April 2012 Submittal of Annual Radioactive Effluent Release Report ML11123A2592011-04-27027 April 2011 Submittal of Annual Radiological Environmental Operating Report for 2010 HNP-11-031, Annual Environmental (Nonradiological) Operating Report2011-04-27027 April 2011 Annual Environmental (Nonradiological) Operating Report HNP-11-032, Annual Radioactive Effluent Release Report for 20102011-04-25025 April 2011 Annual Radioactive Effluent Release Report for 2010 ML1020301712010-07-0707 July 2010 HNP Radiological Environmental Monitoring Analysis Report ML1020301702010-07-0707 July 2010 HNP Radiological Environmental Monitoring Gamma Isotopic Report HNP-10-043, Submittal of Annual Radiological Environmental Operating Report2010-04-27027 April 2010 Submittal of Annual Radiological Environmental Operating Report HNP-10-041, Annual Radioactive Effluent Release Report for 20092010-04-16016 April 2010 Annual Radioactive Effluent Release Report for 2009 HNP-09-038, Annual Environmental (Nonradiological) Operating Report2009-04-29029 April 2009 Annual Environmental (Nonradiological) Operating Report HNP-09-039, Annual Radioactive Effluent Release Report for 20082009-04-26026 April 2009 Annual Radioactive Effluent Release Report for 2008 HNP-08-041, Transmittal of Annual Radiological Environmental Operating Report for 20072008-04-20020 April 2008 Transmittal of Annual Radiological Environmental Operating Report for 2007 ML0729200822007-10-19019 October 2007 Index of References - Shearon Harris SEIS License Renewal HNP-07-105, Response to Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application, Response to RAI No. 1, Item 1 Through Item 72007-08-0808 August 2007 Response to Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application, Response to RAI No. 1, Item 1 Through Item 7 HNP-07-045, Annual Radiological Environmental Operating Report for 20062007-04-18018 April 2007 Annual Radiological Environmental Operating Report for 2006 HNP-07-046, Annual Radioactive Effluent Release Report for 20062007-04-13013 April 2007 Annual Radioactive Effluent Release Report for 2006 HNP-06-094, Groundwater Protection - Data Collection Questionnaire2006-07-27027 July 2006 Groundwater Protection - Data Collection Questionnaire HNP-06-050, Annual Environmental (Non-Radiological) Operating Report for 20052006-04-17017 April 2006 Annual Environmental (Non-Radiological) Operating Report for 2005 ML0520303382005-07-14014 July 2005 NPDES Monthly Report Forms for June 2005 for Perry Nuclear Power Plant HNP-05-041, Transmittal of Annual Environmental (Non-Radiological) Operating Report for 20042005-04-15015 April 2005 Transmittal of Annual Environmental (Non-Radiological) Operating Report for 2004 HNP-05-038, Annual Radioactive Effluent Release Report2005-04-12012 April 2005 Annual Radioactive Effluent Release Report 2024-04-09
[Table view] Category:Letter type:HNP
MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018 Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations. HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations. HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..2017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation2017-02-15015 February 2017 Summary of 10 CFR 50.54(q) Evaluation 2018-09-17
[Table view] |
Text
Progress Energy APR 2 7 2011 SERIAL: HNP-11-031 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/RENEWED LICENSE NO. NPF-63 ANNUAL ENVIRONMENTAL (NONRADIOLOGICAL) OPERATING REPORT Ladies and Gentlemen:
In accordance with Section 5.4.1 of the Environmental Protection Plan issued as Appendix B to the Renewed Operating License (NPF-63) for the Harris Nuclear Plant, Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., provides the enclosed Annual Environmental (Nonradiological) Operating Report for 2010.
If you have any questions regarding this information, please contact me at (919) 362-3137.
Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/mgw Enclosure c: Mr. J. D. Austin (NRC Senior Resident Inspector, HNP)
Mr. V. M. McCree (NRC Regional Administrator, Region II)
Mrs. B. L. Mozafari (NRC Project Manager, HNP)
Progress Energy Carolinas, Inc.
Harris Nuclear Plant P. 0. Box 165 New Hill, NC 27562
Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant Unit 1 ANNUAL ENVIRONMENTAL (NONRADIOLOGICAL)
OPERATING REPORT January 1, 2010 through December 31, 2010 Renewed Facility Operating License No. NPF-63 Appendix B Docket No. 50-400
1.0 INTRODUCTION
Carolina Power & Light Company (CP&L) received a low-power Facility Operating License (No. NPF-53) and full-power Facility Operating License (No. NPF-63) for the Shearon Harris Nuclear Power Plant, Unit 1, from the U.S. Nuclear Regulatory Commission (NRC) on October 24, 1986, and January 12, 1987, respectively. The NRC issued a Renewed Facility Operating License (No. NPF-63) on December 17, 2008, extending operations until October 24, 2046. Appendix B (the Environmental Protection Plan (EPP) [nonradiological]) of the renewed operating license requires submittal of an Annual Environmental (nonradiological) Operating Report to the NRC describing the implementation of the plan during the previous year. The purpose of this document is to fulfill the requirement for the period January 1 through December 31, 2009.
On January 1, 2003, Carolina Power & Light Company adopted the brand name Progress Energy Carolinas, Inc. (PEC).
2.0 PLANT CONSISTENCY REQUIREMENTS [EPP Section 3.0]
2.1 Plant Design and Operation There were no changes in plant design or operation and there were no tests or experiments performed which involved a potentially significant unreviewed environmental question during the reporting period.
2.2 Reporting Related to the NPDES Permit As required by National Pollutant Discharge Elimination System (NPDES) permit NC0039586, monitoring data were submitted to the North Carolina Division of Water Quality (NCDWQ) via monthly discharge monitoring reports and separate correspondence as warranted.
On September 16, 2010, the NCDWQ issued Pump and Haul Permit WQ00304993 to allow transfer of sewage from the HNP Sewage Treatment Plant (Outfall 002) to the Harris Energy & Environmental Sewage Plant (Outfall 007) during Refueling Outage 16. Reporting and termination requirements of the permit were met.
3.0 UNUSUAL OR IMPORTANT ENVIRONMENTAL EVENTS [EPP Section 4.1]
No occurrence of an unusual environmental event that would indicate or could result in a significant environmental impact causally related to plant operations occurred during the reporting period. No releases or exceedances of permit conditions caused any significant environmental impact. The existence of biofouling organisms (Asiatic clams, Corbicula fluminea) and the presence of troublesome aquatic vegetation (hydrilla, Hydrilla verticillata) in Harris Reservoir are considered important topics worthy of inclusion in this report.
1
3.1 Aquatic Biological Monitoring A. Inspections for Asiatic clams (Corbiculafiuminea) in the Harris Nuclear Plant Emergency Service Water System (e.g., intake structures)
The frequency for inspecting the Emergency Service Water (ESW) intake structure was changed to once every 3 years during 2003. The change was based on an engineering evaluation (Engineering Change 49074) of HNP's Generic Letter 89-13 Testing and Inspection Program. Inspections of ESW intake bays occurred on July 31, 2010, and November 14, 2010. These inspections indicated a stable Asiatic clam population.
No clogging events of HNP cooling water systems occurred during 2010 as a result of Asiatic clam infestation.
B. Monitoring for hydrilla (Hydrillaverticillata),a nonnative aquatic weed.
Main Reservoir Hydrilla was found throughout the main reservoir during the 2010 survey.
Biomass was greater than during 2009 as hydrilla began re-colonizing areas previously exposed by drought conditions during 2009. Hydrilla was abundant in the shallow bay adjacent to the mouth of the main intake canal.
However, hydrilla was only present along the fringes of the intake canal itself. The abundance of creeping water primrose, Ludwigia spp., a shallow-water emergent, remained less compared to previous years primarily due to the rapid re-colonization of the shallow water areas by hydrilla.
No new species of aquatic plants were observed in the main reservoir.
Auxiliary Reservoir Submerged aquatic vegetation was discovered in the auxiliary reservoir during the 2010 survey. The dominant vegetation was Hydrilla. Also present was bladderwort, Utriculariaspp., southern pond weed, Potamogetonspp., slender spike rush, Eleochris baldwinii, and some creeping water primrose. Of these species, the hydrilla, southern pond weed, and bladderwort are of potential concern regarding intake fouling. Biomass and stem height is much less than that currently found in Harris Lake. The hydrilla remains close to the bottom and not near the water surface. This indicates that the vegetation most likely became established during the 2010 summer months and has not had the benefit of a full growing season.
The heaviest infestation of hydrilla was found in the southern-most arm of the reservoir that intersects with United States Highway 1 (US 1). Hydrilla was also found in the northern-most arm that intersects with US 1 and in the corner near the Auxiliary Reservoir's dam across from the boat ramp. The distribution was patchy at these latter two locations.
2
No hydrilla, bladderwort, or southern pond weed was observed in the auxiliary intake canal or along the shoreline adjacent to the auxiliary intake canal.
The dominant vegetation observed along the auxiliary intake canal was Eleochris baldwinii,a small grass-like submerged plant that poses no operational concern. Creeping water primrose (Ludwigia spp.) was also present but in small amounts.
Progress Energy has submitted a permit application to the North Carolina Wildlife Resources Commission for restocking of triploid grass carp (Ctenopharyngodonidella) in the auxiliary reservoir during 2011 for continued vegetation control.
No impacts to HNP operations from aquatic vegetation occurred in 2010.
3.2 Combined Construction and Operating License Application Evaluations Progress Energy Carolinas, Inc. continues to perform engineering and natural resource evaluations related to potential future development of two new nuclear power generation units at the HNP site. The NRC is currently reviewing the Combined Construction and Operating License (COL) application submitted by Progress Energy on February 19, 2008.
In 2010 several field studies related to the COL were performed. The US Army Corps of Engineers (USACE) issued a final Jurisdictional Determination which included the wetland and stream impacts associated with the proposed lake level rise expected to support the addition of new units at Harris. In-stream Flow studies, including fish, benthic and mussel surveys, continued in Buckhorn Creek and a section of the Cape Fear River to evaluate habitats and potential impacts from changes in flow. These studies should conclude during 2011. The natural resource studies are being coordinated with the USACE, North Carolina Department of Environment and Natural Resources (NCDENR), US Fish &
Wildlife Service, and North Carolina Wildlife Resources Commission.
No significant environmental impacts have been caused or identified by these activities.
3.3 New Firing Range An Erosion Control Plan for Land Clearing at the Harris Plant was submitted to support the construction of a new firing range for security guard training. These activities were coordinated with the NCDENR. Land clearing and construction activities were completed in 2010.
No significant environmental impacts have been caused or identified by these activities.
3
3.4 New Generator Rewind Building An Erosion Control Plan for Land Clearing at the Harris Plant was submitted to support the construction of a new building to rewind an electrical generator.
These activities were coordinated with the NCDENR. Land clearing and construction activities were completed in 2010.
No significant environmental impacts have been caused or identified by these activities.
3.5 Cooling Tower Blowdown Line Replacement An Erosion Control Plan for Land Clearing at the Harris Plant was submitted to support the construction of approximately 6000 feet of the Cooling Tower Blowdown Line used for NPDES Discharges. These activities were coordinated with the NCDENR. Land clearing and all construction activities were completed in 2010.
No significant environmental impacts have been caused or identified by these activities.
3.6 Roadway Security Project An Erosion Control Plan for Land Clearing at the Harris Plant was submitted to support roadway construction and security upgrades. These activities were coordinated with the NCDENR. Land clearing and construction activities were completed in 2010.
No significant environmental impacts have been caused or identified by these activities.
4.0 ENVIRONMENTAL MONITORING [EPP Section 4.2]
4.1 Aquatic Monitoring [EPP Section 4.2.1]
Under the authority of the Clean Water Act, the state of North Carolina renewed the National Pollutant Discharge Elimination System (NPDES) permit (NC0039586) for the HNP on March 1, 2007. The permit includes the Harris Energy & Environmental Center (HE&EC) sewage treatment plant discharge as an outfall (007).
The permit requires that a state-certified laboratory perform the analyses on all non-field parameters analyzed for effluent samples. In accordance with this requirement, the HNP Environmental & Chemistry Laboratory was certified by the North Carolina Division of Water Quality (NCDWQ) as a Wastewater Laboratory, effective January 1, 2010, and valid through December 31, 2010. In addition, during 2010 Progress Energy contracted with two NCDWQ-certified private laboratories, Environmental Conservation Laboratories, Inc. (ENCO) and Environmental Testing Solutions, Inc., to perform analyses.
4
4.1.1 Effluent Monitoring Routine effluent monitoring was conducted and reported to the NCDWQ as required by the NPDES permit.
4.1.2 NPDES Inspections On March 25, 2010, the NCDWQ conducted an NPDES complaint investigation inspection at the Harris Energy & Environmental Center sewage treatment plant (Outfall 007). The NCDWQ subsequently issued an investigation report dated April 1, 2010. Progress Energy responded to the investigation report by letter dated June 2, 2010.
4.1.3 Other Inspections On October 29, 2010, NCDENR personnel inspected the erosion control areas that were currently active. No deficiencies were identified as a result of these inspections.
4.2 Terrestrial Monitoring [EPP Section 4.2.2]
Terrestrial monitoring is not required.
4.3 Noise Monitoring [EPP Section 4.2.3]
Noise monitoring is not required.
5.0 EPP AUDIT [EPP Section 5.1]
An audit conducted by an independent corporate entity was performed to verify the completeness and accuracy of the conditions and activities described in this Annual Environmental Operating Report. The results of the audit are on file and available for inspection.
6.0 PLANT REPORTING REQUIREMENTS [EPP Section 5.4]
6.1 EPP Noncompliances There were no EPP noncompliances identified during the reporting period.
6.2 Changes in Station Design and Operation There were no changes in station design or operation and there were no tests or experiments performed which involved a potentially significant unreviewed environmental question during 2010.
5
. _. 1 -1 6.3 Non-routine Reports There were no non-routine reports submitted in accordance with EPP Section 5.4.2 during 2010.
6.4 Other Reporting Requirements There were no other EPP reportable events during 2010.