Closure Letter for the Licensee'S Response to Generic Letter 2008-01, Managing Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems
ML11174A143
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/24/2011
From: Mozafari B
Plant Licensing Branch II
To: Jefferson W
Carolina Power & Light Co
Mozafari B
References
TAC MD7816, TAC MD7832
Download: ML11174A143 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2011 Mr. William Jefferson, Jr.

Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR PLAN, UNIT 1 - CLOSURE LEITER FOR THE LICENSEE'S RESPONSE TO GENERIC LEITER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7816)

Dear Mr. Jefferson:

On January 11,2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:

a) A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that the licensee is or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to Title 10 of the Code of Federal Regulations, Part 50, as well as the licensing basis and operating license as those requirements apply to the subject systems; b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications, that the licensee determined were necessary to assure compliance with these regulations; and, c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

W Jefferson -2 By letters dated May 9 and October 14,2008; August 10, 2009, and January 28,2010 (ADAMS Accession Nos. ML081360497, ML082910295, ML092250226, and ML100430444, respectively), Carolina Power & Light Company, the licensee for the Shearon Harris Nuclear Power Plant (HNP), provided information in response to GL 2008-01. The NRC staff has reviewed the submitted information and concluded that the licensee's response to GL 2008-01 for HNP is acceptable. Consequently, HNP's GL response is considered closed and no further information or action is requested on the part of the licensee with the exception of any commitments made with respect to the GL 2008-01 responses.

Notwithstanding closure of GL 2008-01 for HNP, the NRC's Region 1\ staff may decide to perform (and would contact the licensee to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's responses to GL 2008-01, and that the plant-specific information supports a conclusion that subject the systems' operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.

~~jlZt;Ji~

Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv

W. Jefferson - 2 By letters dated May 9 and October 14, 2008; August 10, 2009, and January 28,2010 (ADAMS Accession Nos. ML081360497, ML082910295, ML092250226, and ML100430444, respectively), Carolina Power & Light Company, the licensee for the Shearon Harris Nuclear Power Plant (HNP), provided information in response to GL 2008-01. The NRC staff has reviewed the submitted information and concluded that the licensee's response to GL 2008-01 for HNP is acceptable. Consequently, HNP's GL response is considered closed and no further information or action is requested on the part of the licensee with the exception of any commitments made with respect to the GL 2008-01 responses.

Notwithstanding closure of GL 2008-01 for HNP, the NRC's Region II staff may decide to perform (and would contact the licensee to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's responses to GL 2008-01, and that the plant-specific information supports a conclusion that subject the systems' operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-2020.

Sincerely, IRA!

Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 RlF RidsNrrDorlLpl2-2 RidsNrrDssSrxb RidsNrrLACSola RidsNrrPMShearonHarris RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnwMailCenter

. No. ML11174A143 ADAMS Accesslon *Bsy memo OFFICE LPL2-2/PM LPL2-2/LA SRXB/BC' LPL2-2BC LPL2-2/PM NAME BMozafari eSola TUlses DBroaddus BMozafari (SLingam for) (FSaba for)

DATE 06/23/11 06/23/11 05/09/11 06/24/11 06/24/11 OFFICIAL AGENCY RECORD