MONTHYEARML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22237A1632022-08-25025 August 2022 004 Radiation Safety Baseline Inspection Information Request ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22108A0182022-04-15015 April 2022 NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22083A0282022-03-23023 March 2022 Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21288A0802021-10-15015 October 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167) ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0112021-08-30030 August 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 - Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149) ML21189A0282021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0112 - Revise TS to Reflect Development of TRM (L-2021-LLA-0108) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21106A0112021-04-15015 April 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0052 - Revise Containment Spray Nozzle Surveillance Frequency (L-2021-LLA-0058) ML21084A2492021-03-24024 March 2021 Notification of Inspection and Request for Information ML21084A2512021-03-22022 March 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0252 - LAR to Remove Extraneous Content and Requirements from the OL and TS (L-2021-LLA-0027) ML21039A6382021-02-0808 February 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1-RA-20-0311 - 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach (L-2021-LLA-0003) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML21025A2922021-01-25025 January 2021 NRR E-mail Capture - (External_Sender) State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21006A4042021-01-0606 January 2021 NRR E-mail Capture - State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML20345A3052020-12-10010 December 2020 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20344A4192020-12-0909 December 2020 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20328A0802020-11-23023 November 2020 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0312-Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection (L-2020-LLR-0143) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation 2024-01-25
[Table view] |
Text
NRR-PMDAPEm Resource From: Som, Swagata Sent: Wednesday, June 29, 2011 10:11 AM To: Mozafari, Brenda Cc: Goel, Vijay; Mathew, Roy
Subject:
RE: HNP Supplement to MUR Power Uprate LAR Brenda - As discussed, we can now accept the revised LAR for further review. This is our branch position.
Thanks Swagata From: Mozafari, Brenda Sent: Wednesday, June 29, 2011 9:27 AM To: Som, Swagata
Subject:
FW: HNP Supplement to MUR Power Uprate LAR Can you please send the acceptance review eMail you sent and retracted, I assume that will be the LIC 109 status fir EEEB.
Thanks Brenda 4152020 From: Goel, Vijay Sent: Tuesday, June 28, 2011 6:51 PM To: Mozafari, Brenda; Som, Swagata Cc: Mathew, Roy
Subject:
RE: HNP Supplement to MUR Power Uprate LAR Brenda/Som, I have looked at the revised Electrical Equipment Design descriptions provided in Enclosure 2 of the supplement to the LAR.
Although, the description relating to the iso-phase bus is still somewhat not clear (i.e., further clarifications will be required during RAI process), we can accept the LAR for further review.
Vijay From: Mozafari, Brenda Sent: Monday, June 27, 2011 8:22 AM To: Som, Swagata; Goel, Vijay; Mathew, Roy
Subject:
FW: HNP Supplement to MUR Power Uprate LAR This is the supplemental information for the MUR. Provided the information is robust enough to start your review I will be expecting to be able to send the LIC-109 letter today. Let me know.
Brenda 4152020 1
From: Bass, Kimberly [1]
Sent: Thursday, June 23, 2011 4:56 PM To: Mozafari, Brenda Cc: Caves, John
Subject:
HNP Supplement to MUR Power Uprate LAR
- Brenda, I have attached an electronic version of the HNP MUR Power Uprate LAR (Supplement) with the information that was requested during discussions held with the NRC over the last month. The attached version excludes two enclosures (enclosures 5 & 6) because of proprietary information. The original MUR Uprate LAR (submitted April 28, 2011) contains the identical enclosures. No information was changes in those enclosures. A full copy of the revised application has been placed in the mail.
Kim Bass Licensing Engineer Licensing & Regulatory Programs Progress Energy Harris Nuclear Plant 9193622326 kimberly.bass@pgnmail.com 2
Hearing Identifier: NRR_PMDA Email Number: 88 Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF782B68068ED5)
Subject:
RE: HNP Supplement to MUR Power Uprate LAR Sent Date: 6/29/2011 10:10:40 AM Received Date: 6/29/2011 10:10:40 AM From: Som, Swagata Created By: Swagata.Som@nrc.gov Recipients:
"Goel, Vijay" <Vijay.Goel@nrc.gov>
Tracking Status: None "Mathew, Roy" <Roy.Mathew@nrc.gov>
Tracking Status: None "Mozafari, Brenda" <Brenda.Mozafari@nrc.gov>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2264 6/29/2011 10:10:40 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: