ML111370397

From kanterella
Jump to navigation Jump to search
Public Meeting Summary Letter Regarding Human Performance Improvement Plan
ML111370397
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/17/2011
From: Randy Musser
NRC/RGN-II/DRP/RPB4
To: Burton C
Carolina Power & Light Co
Shared Package
ML111370394 List:
References
Download: ML111370397 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 17, 2011 Mr. Christopher L. Burton Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING WITH SHEARON HARRIS NUCLEAR PLANT REGARDING HUMAN PERFORMANCE IMPROVEMENT PLAN - DOCKET NO. 50-400

Dear Mr. Burton:

This refers to the meeting conducted at your request at the NRC Region II Office on May 9, 2011, at 10:00 a.m. The meetings purpose was for Harris Nuclear Plant to discuss the Human Performance Improvement Plan and introduce new members of the Harris management staff.

The topics discussed included Site Human Performance, Maintenance Human Performance, Operational Focus, Equipment Reliability, and Public Health and Safety. Enclosed are a list of attendees (Enclosure 1) and the presentation handouts (Enclosure 2).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:

50-400 License No.: NPF-63

Enclosures:

As stated

Mr. Christopher L. Burton Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING WITH SHEARON HARRIS NUCLEAR PLANT REGARDING HUMAN PERFORMANCE IMPROVEMENT PLAN - DOCKET NO. 50-400

Dear Mr. Burton:

This refers to the meeting conducted at your request at the NRC Region II Office on May 9, 2011, at 10:00 a.m. The meetings purpose was for Harris Nuclear Plant to discuss the Human Performance Improvement Plan and introduce new members of the Harris management staff.

The topics discussed included site Human Performance, Maintenance Human Performance, Operational Focus, Equipment Reliability, and Public Health and Safety. Enclosed are a list of attendees (Enclosure 1) and the presentation handouts (Enclosure 2).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-400 License Nos.: NPF-63

Enclosures:

As stated X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_____ML111370397_____

X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE RAM /RA for/

RAM /RA for/

RAM /RA/

NAME JWorosilo JDodson RMusser DATE 05/17/2011 05/17/2011 05/17/2011 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\DRPII\\RPB4\\PROGESS ENERGY MEETINGS\\2011\\HARRIS MEETING

SUMMARY

MAY 2011.DOCX

CP&L 2

cc w/encl:

Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Electronic Mail Distribution Donald L. Griffith, Training Manager Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution LaQuisha M. Parks Manager Support Services Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution David H. Corlett, Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution David T. Conley, Senior Counsel Legal Department Progress Energy Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution W. Lee Cox, III, Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Robert P. Gruber, Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos, Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998 Kelvin Henderson General Manager-Nuclear Fleet Operations Progress Energy Kelvin.henderson@pgnmail.com Donna B. Alexander, Manager Nuclear Regulatory Affairs Progress Energy Donna.alexander@pgnmail.com Chair Board of County Commissioners of Chatham County P. O. Box 1809 Pittsboro, NC 27312

CP&L 3

Letter to Christopher Burton from Randall A. Musser dated May 17, 2011

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING WITH SHEARON HARRIS NUCLEAR PLANT REGARDING HUMAN PERFORMANCE IMPROVEMENT PLAN - DOCKET NO. 50-400 Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource