Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
Press Release-I-09-034, NRC to Discuss Safety Conscious Work Environment at Susquehanna Nuclear Power Plant at Public Meeting on July 629 June 2009Press Release-I-09-034: NRC to Discuss Safety Conscious Work Environment at Susquehanna Nuclear Power Plant at Public Meeting on July 6
PLA-6522, Enclosure 2 - Allegheny Electric Cooperative, Inc., 2008 Annual Report29 June 2009Enclosure 2 - Allegheny Electric Cooperative, Inc., 2008 Annual Report
ML09196007629 June 2009Enclosure 1 - PPL Corporation 2008 Annual ReportIncorporated by reference
Aging Management
Grace period
ML09196007529 June 2009Susquehanna Steam Electric Station - 2008 Annual Financial Report
PLA-6530, Response to Request for Additional Information on Time Extension of Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits29 June 2009Response to Request for Additional Information on Time Extension of Technical Specification 3.8.1 Allowable Completion Time for Offsite AC CircuitsEnforcement Discretion
Offsite Circuit
Scaffolding
ML09154047324 June 2009Branch Chief Assignment-Susquehanna Steam Electric Station, Units 1 and 2
ML09180046023 June 2009Submittal of Work Environment Improvement Plan, PLA-6528
ML09182019423 June 2009ME0969 & ME0970, RAI from Eeeb LAR for One-Time Extension of AOT in TS 3.8.1 to Replace Transformer T-20Offsite Circuit
ML09168004217 June 2009ME0969 & ME0970, Revised RAIs from ITSB LAR for Extension of AOT in TS 3.8.1 for Meeting 72 Hrs to 10 Days
ML09168041117 June 2009Notice of Closed Public Meeting with PPL Susquehanna, Units 1 & 2 to Discuss a Potential Greater-Than-Green Security-Related Finding Identified
ML09168059317 June 2009NRC Office of Investigations Case No. 1-2008-031, Ltr to W. Spence Dated 06/17/2009, Determine If OSC Deliberately Falsified Logs
ML09181070516 June 2009Revisions to Technical Requirements ManualShutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Battery sizing
ML09181070616 June 2009Revisions to Technical Requirements ManualShutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Battery sizing
ML09166027012 June 2009NRC Office of Investigations Case No. 1-2008-033, Dated 6/12/09
IR 05000387/20094038 June 2009IR 05000387-09-403, and 05000388-09-403, on 3/10/2009 - 4/10-11/2009, Susquehanna Steam Electric Station, Units 1 and 2, Letter OnlyB.5.b
ML0913906314 June 2009ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, SlidesProbabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Fuel cladding
ML0916100962 June 2009ME0969 & ME0970, RAIs from ITSB, Amendment Request One-Time Extension of AOT in TS 3.8.1, Required Action A.3
ML0915204951 June 2009Summary of Annual Assessment Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station Units 1 and 2 for the Calendar Year 2008
ML0914800821 June 2009Summary of Telephone Conference Call Held on May 21, 2009, Between the U.S. NRC and PPL Susquehanna, LLC, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application
PLA-6519, Submittal of Special Report - Reactor Vessel Water Level Extended Range Channel Inoperable for More than Thirty Days1 June 2009Submittal of Special Report - Reactor Vessel Water Level Extended Range Channel Inoperable for More than Thirty DaysReactor Vessel Water Level
ML0915505711 June 2009Meeting Minutes of the Plant License Renewal Subcommittee on April 1, 2009Finite Element Analysis
Aging Management
ML09149047329 May 2009ME0933 & ME0934, RAIs from Srxb Amendment Request for Changes in TS Table 3.3.5.1-1 and TS 3.10.8.f
ML09149000729 May 2009ME0969 & ME0970, RAIs from Apla (PRA Branch) Amendment Request for One-Time Ext of AOT - 72 Hrs to 10 DaysSafe Shutdown
High winds
Mission time
Offsite Circuit
ML09148058328 May 2009Meeting Notice, Public Meeting with PPL to Engage Susquehanna in a Discussion Regarding the Status of the Safety Conscious Work Environment (SCWE) at Susquehanna, Units 1 and 2
ML09148035328 May 2009Alert'S Questions on Nrc'S Aam of Susquehanna Steam Electric Station
PLA-6514, Revision 6 to the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan28 May 2009Revision 6 to the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan
PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)28 May 2009Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)
ML09159004028 May 2009Submittal of an Amendment to Table A-1 of License Renewal Application Amendment to LRA Commitment #61
IR 05000387/200920127 May 2009IR 05000387-09-201, and IR 05000388-09-201, on 02/10/2009, for Susquehanna, Units 1 & 2, Physical Security Baseline Force on Force Inspection and Preliminary Greater than Green FindingSignificance Determination Process
Affidavit
PLA-6513, Response to Request for Additional Information for the Review of License Application (LRA) Section 4.326 May 2009Response to Request for Additional Information for the Review of License Application (LRA) Section 4.3Safe Shutdown
Hydrostatic
Aging Management
ML09138033922 May 2009ME0772, Proprietary Information Determination Letter, PLA-6510 - Encl 1, M. S. Line Limit Curve Adjustment During Power Ascension
ML09142041315 May 2009Revision 50 to Technical Requirements ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML09135045415 May 2009ME0969 & ME0970, Acceptance Review - LAR for One-Time Extension of AOT in TS3.8.1, LCO Action A3 for Replacement of Transformer ST-20
ML09142037415 May 2009Revision to Technical Requirements ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Scram Discharge Volume
Fuel cladding
ML09152003715 May 2009Comment (1) from Kevin Magerr on Behalf of U.S. Environmental Protection Agency (EPA) Susquehanna, Units 1 and 2, EPA Review and Final Generic Supplemental Environmental Impact Statement (Fgseis) (Report Number NUREG-1437, Supplement 35)
PLA-6506, Submittal of Startup Test Procedures14 May 2009Submittal of Startup Test ProceduresShutdown Margin
Grab sample
Stroke time
MELLLA
Operability Determination
Fuel cladding
Flow Induced Vibration
Power Uprate
PLA-6504, Request for Additional Information for the Review of the License Renewal Application Section 3.3.2.2.6, PLA-650413 May 2009Request for Additional Information for the Review of the License Renewal Application Section 3.3.2.2.6, PLA-6504Aging Management
IR 05000387/200900213 May 2009IR 05000387-09-002, 05000388-09-002, on 01-01-09 - 03-31-09, Susquehanna Units 1 and 2, Integrated Inspection ReportUltimate heat sink
Fire Barrier
VT-2
Missed surveillance
Operability Determination
Fire Protection Program
Coast down
Operability Assessment
Power Uprate
ML09139032312 May 2009Operating License No. NPF-014 License Condition 2.C.(36)(b)8 and Unit 2, Operating License No. NPF-022, License Condition 2.C.(20)(b)8
PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications12 May 2009Supplemental Electrical Information to License Amendment Request on the Technical SpecificationsOffsite Circuit
PLA-6508, Annual Radiological Environmental Operating Report for Calendar Year 200812 May 2009Annual Radiological Environmental Operating Report for Calendar Year 2008Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Met Tower
Annual Radiological Environmental Operating Report
Chernobyl
Press Release-I-09-027, NRC to Discuss Annual Assessment for Susquehanna Nuclear Plant at Public Meeting Set for May 19 in Berwick, Pa11 May 2009Press Release-I-09-027: NRC to Discuss Annual Assessment for Susquehanna Nuclear Plant at Public Meeting Set for May 19 in Berwick, Pa
PLA-6512, Work Environment Meeting8 May 2009Work Environment Meeting
ML0913202877 May 2009Work Environment Meeting - Letter from W. Spence May 7, 2009
ML0912502547 May 2009Summary of Tele Conf Call Held on April 14th, 2009, Between the USNRC and PPL Susquehanna, LLC, Concerning Draft Requests for Additional Information Pertaining to the SSES, Units 1 and 2, License Renewal Application
ML0913906297 May 2009Revisions to Technical Specifications Bases, ManualHot Short
Safe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Squib
Qualified Offsite Circuit
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Fuel cladding
Offsite Circuit
Power change
Coast down
ML0913800997 May 2009Technical Specification Bases ManualSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Qualified Offsite Circuit
Scram Discharge Volume
Fuel cladding
Offsite Circuit
PLA-6507, License Renewal Application (LRA) Draft Safety Evaluation Report (SER) Comments5 May 2009License Renewal Application (LRA) Draft Safety Evaluation Report (SER) CommentsSafe Shutdown
Boric Acid
Loop seal
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Aging Management
Foreign Material Exclusion
Moisture barrier
Earthquake
Biofouling
EVT-1
Fire Protection Program
Dissimilar Metal Weld
Flow Induced Vibration
ML0915203924 May 2009ME0933 & ME0934, RAIs from Eicb Amendment Request to Revise TS Table 3.3.5.1-1 (CST) and TS 3.10.8.f
ML0912505121 May 2009Amendment Request One Time Extension of AOT to Replace ST-20 Transformer, Request to Provide Supplementary as Part of Acceptance Review Process Per LIC-109Offsite Circuit