Letter Sequence RAI |
---|
|
|
MONTHYEARML0912600062009-04-17017 April 2009 ME0969 & ME0970, Request for Supplemental Information (PRA) to Complete Acceptance Review Amendment Request for Changes to TS 3.8.1 for One-Time Extension of AOT to Replace ST-20 Transformer Project stage: Acceptance Review ML0912505472009-04-23023 April 2009 E-mail for Supplemental Information to Complete Acceptance Review Amendment Request for Changes to TS3.8.1 for One-Time Extension to AOT to Replace ST-20 Transformer Project stage: Acceptance Review ML0912505122009-05-0101 May 2009 Amendment Request One Time Extension of AOT to Replace ST-20 Transformer, Request to Provide Supplementary as Part of Acceptance Review Process Per LIC-109 Project stage: Acceptance Review ML0913504542009-05-15015 May 2009 ME0969 & ME0970, Acceptance Review - LAR for One-Time Extension of AOT in TS3.8.1, LCO Action A3 for Replacement of Transformer ST-20 Project stage: Acceptance Review ML0914900072009-05-29029 May 2009 ME0969 & ME0970, RAIs from Apla (PRA Branch) Amendment Request for One-Time Ext of AOT - 72 Hrs to 10 Days Project stage: RAI ML0916100962009-06-0202 June 2009 ME0969 & ME0970, RAIs from ITSB, Amendment Request One-Time Extension of AOT in TS 3.8.1, Required Action A.3 Project stage: RAI ML0916800422009-06-17017 June 2009 ME0969 & ME0970, Revised RAIs from ITSB LAR for Extension of AOT in TS 3.8.1 for Meeting 72 Hrs to 10 Days Project stage: RAI ML0918201942009-06-23023 June 2009 ME0969 & ME0970, RAI from Eeeb LAR for One-Time Extension of AOT in TS 3.8.1 to Replace Transformer T-20 Project stage: RAI ML0918908152009-07-0606 July 2009 ME0969 & ME0970, Follow-up RAI from PRA to Licensee Responses (PLA-6526, Dtd 07-01-2009) Project stage: RAI ML0918908022009-07-0606 July 2009 ME0969 & ME0970, Follow-up RAIs from PRA to the Licensee RAI Responses (PLA-6526 Dtd 07-01-2009) Project stage: RAI ML0921604622009-07-16016 July 2009 ME0969 & ME0970, Follow-up RAIs from Eeeb Amendment Request for Extension AOT in TS3.8.1 Project stage: RAI ML0921604292009-07-20020 July 2009 Request for Additional Information (Rais) License Amendment Request for One-time Extension of Allowable Outage Time in TS 3.8.1, LCO Action A3, from 72 Hours to 10 Days for Replacement of Transformer ST-20 Project stage: RAI ML0924300972009-08-31031 August 2009 Frn:General Notice, Notice of Withdrawal of Application for Amendment to Facility Operating License Project stage: Withdrawal ML0922300552009-08-31031 August 2009 Letter Regarding Withdrawal of an Amendment Request and FRN Project stage: Withdrawal NRC-2009-0389, Frn:General Notice, Notice of Withdrawal of Application for Amendment to Facility Operating License2009-08-31031 August 2009 Frn:General Notice, Notice of Withdrawal of Application for Amendment to Facility Operating License Project stage: Withdrawal 2009-06-17
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24155A0882024-05-30030 May 2024 Email Summary of Verbal Authorization 1RR06 ML24150A3342024-05-29029 May 2024 Official RCIs for Susquehanna Proposed Alternative 1RR06 ML24087A0672024-04-22022 April 2024 Email to Melisa Krick Regarding Exemption Decision for Susquehanna ML24087A0682024-04-17017 April 2024 Email to Melisa Krick Regarding Availability of Environmental Assessment for the Susquehanna Exemption ML24106A0672024-04-12012 April 2024 State of Pennsylvania Input Review of Draft EA for Exemption Request for Susquehanna, Units 1 and 2 ML24103A0012024-04-11011 April 2024 – Summary of Verbal Authorization of 4RR-11 ML24102A1252024-04-10010 April 2024 Request for Additional Information for Susquehanna, Unit 1 Alternative Request 4RR-11 ML24106A0662024-04-10010 April 2024 Request for State Review of Draft EA for an Exemption Request for Susquehanna, Units 1 and 2 ML24082A0922024-03-21021 March 2024 Confirmation Email 3-21-2024 Regarding Exemption Request for Future Loading Only at Susquehanna ML24047A1232024-02-14014 February 2024 NRC Consultation with Commonwealth of PA Proposed NSHC for Susquehanna LAR TSTF-568 and TSF-563 Email ML24029A2732024-01-29029 January 2024 NRC Consultation with Commonwealth of Pennsylvania Re Proposed NSHC for Susquehanna License Amendment Request ML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML23345A0542023-12-0808 December 2023 Email - NRC LIC-109 Acceptance Review Results for Susquehanna License Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML23334A1682023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-01 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23242A2832023-08-30030 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternatives RR01 and RR02 (EPIDs L-2023-LLR-0043 and -0044) ML23230A0712023-08-18018 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative for Valve 251130 ML23188A0802023-07-0707 July 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Control Rod Technical Specifications ML23171A4312023-06-20020 June 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative 5RR-02 ML23103A4702023-04-12012 April 2023 NRR E-mail Capture - Susquehanna Unit 2 - Verbal Authorization of Relief Request 4RR-10 ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23075A0492023-03-16016 March 2023 NRR E-mail Capture - Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 - Indirect License Transfer and Draft Conforming Amendments ML23073A1202023-03-14014 March 2023 NRR E-mail Capture - Evacuation Time Estimate Review ML23013A2082023-01-13013 January 2023 Request for Additional Information ML23012A0012023-01-11011 January 2023 NRC Notification to the State of Pennsylvania Re. Emergency Amendment Control Rod Technical Specifications ML22293A0882022-10-20020 October 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna License Transfer ML22257A1942022-09-14014 September 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Relocating Staff Qualification Requirements ML22213A2612022-08-0101 August 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Instrumentation and Control Technical Specifications ML22179A2902022-06-28028 June 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - TSTF-505, Risk Informed Completion Times ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22123A1112022-05-0303 May 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Relocate Staff Qualifications ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22084A0222022-03-25025 March 2022 NRR E-mail Capture - Susquehanna Atrium-11 LAR Audit Report ML22038A1062022-02-0404 February 2022 NRR E-mail Capture - Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML22005A0712021-12-21021 December 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna 1 & 2 ECCS TS LAR ML21190A1702021-06-11011 June 2021 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Regarding a Susquehanna Steam Electric Station, Unit 2 Amendment - Unit 1 Transformer Replacement ML21124A2022021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review for Susquehanna TSTF-505 ML20343A3712020-12-0808 December 2020 NRR E-mail Capture - Corrected - Acceptance Review of Susquehanna RR 4RR-02 ML20343A3702020-12-0808 December 2020 NRR E-mail Capture - Acceptance Review of Susquehanna RR 4RR-02 ML20335A5732020-11-30030 November 2020 NRR E-mail Capture - Susquehanna -Acceptance Review Replacement of Unit 1 Transformers ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20261H4272020-09-17017 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20261H4212020-09-16016 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20195B1282020-07-13013 July 2020 NRR E-mail Capture - Acceptance Review for Susquehanna- Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (EPID L-2020-Lla-0139) ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20028F6352020-01-28028 January 2020 NRR E-mail Capture - Acceptance Review of LAR to Revise the Dose Consequence Analysis for a Loss of Coolant Accident ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19234A0342019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for Advanced Framatome Methodologies for Atrium 11 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24150A3362024-05-29029 May 2024 Request for Confirmation of Information Relief Request 1RR06 (Proposed Alternative) Susquehanna Nuclear, LLC Susquehanna Steam Electric Station (Susquehanna), Unit 1 Docket No. 50-387 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24102A1252024-04-10010 April 2024 Request for Additional Information for Susquehanna, Unit 1 Alternative Request 4RR-11 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information ML23013A2082023-01-13013 January 2023 Request for Additional Information ML22146A1022022-05-26026 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404 ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22041A1562022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21316A1242021-11-18018 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Emergency Core Cooling Technical Specifications ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request ML20010D2012020-01-0909 January 2020 Request for Additional Information Related to Request to Allow Application of Framatome Analysis Methodologies Necessary to Support a Planned Transition to Atrium 11 Fuel Under Maximum ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19128A0232019-05-0707 May 2019 Request for Additional Information: Susquehanna Steam Electric Station, Units 1 and 2 License Amendment Request for ESW Piping Replacement ML18352B1832018-12-13013 December 2018 Enclosurequest for Additional Information (Letter to K. Cimorelli Request for Additional Information Regarding Susquehanna Nuclear, Llc'S Decommissioning Funding Plan Update for Susquehanna Steam Electric Station Independent Spent Fuel Stor ML17180A2002017-07-0707 July 2017 Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits ML17059D2142017-03-0606 March 2017 Susquehanna Steam Electric Station - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage Frequency Limits ML16251A0652016-09-0909 September 2016 Susquehanna Steam Electric Station, Unit 2 - RAI Regarding Temporary Change of Unit 2, Technical Specifications 3.7.1 & 3.8.7 to Allow Replacement of Unit 1, 480 Volt Engineered Safeguard System Load Center Transformers(CAC No. MF7298) ML16245A2052016-09-0101 September 2016 Draft Request for Additional Information Replacement of Load Center Transformers ML16243A0952016-08-30030 August 2016 Draft Request for Additional Information Application for Approval of Indirect Transfer of Control of Licenses ML16060A2302016-03-24024 March 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers ML15316A5632015-11-13013 November 2015 Request for Additional Information Regarding Proposed Relief Requests for the Third 10-Year Inservice Inspection Interval(Cac Nos. MF6302 Through MF6307) ML15292A1782015-10-15015 October 2015 TSTF-425 LAR Draft 3rd RAIs ML15230A0802015-08-26026 August 2015 Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, EAL Scheme Change ML15209A9742015-08-24024 August 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 ML15230A0462015-08-17017 August 2015 Draft RAIs SSES EAL Scheme Change LAR in Accordance with NEI 99-01 Rev 6 ML15229A2092015-08-17017 August 2015 SSES Draft Request for Additional Information Licensee Request to Adopt TSTF-425 ML15229A2002015-08-17017 August 2015 E-mail from J. Whited to J. Jennings SSES Draft TSTF-425 RAIs ML15183A3502015-07-0202 July 2015 SSES Relief Requests 3RR-19, 3RR-20, and 3RR-21 Draft Identified Information Insufficiencies (TAC Nos. MF6302 Through MF6307) ML15103A3962015-05-22022 May 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 (TAC Nos. MF5151 and MF5152) ML15128A5092015-05-0808 May 2015 E-mail from J. Whited to D. Filchner SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15128A5162015-05-0808 May 2015 SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15008A4702015-01-30030 January 2015 Request for Additional Information Request to Revise Technical Specification 3.4.10, RCS Pressure and Temperature (P/T) Limits. ML15016A2742015-01-16016 January 2015 Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML15016A2722015-01-16016 January 2015 E-mail from J. Whited to D. Filchner Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML14343A9842015-01-0808 January 2015 Request for Additional Information Relief Request 4RR-01 ML14345A2412014-12-16016 December 2014 Request for Additional Information Request for Order Approving Indirect Transfer of Control and Conforming License Amendments ML14346A4022014-12-12012 December 2014 Draft RAIs Relief Request 4RR-01 ML14346A4012014-12-12012 December 2014 E-mail from J. Whited to D. Filchner Susquehanna Steam Electric Station Draft RAIs Relief Request 4RR-01 ML14346A1022014-12-12012 December 2014 Draft License Transfer Revised 2nd RAIs ML14346A1002014-12-12012 December 2014 E-mail from J. Whited to R. Sgarro Susquehanna Steam Electric Station Draft License Transfer Revised 2nd RAIs ML14342A8132014-12-0808 December 2014 SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14342A8082014-12-0808 December 2014 E-mail from J. Whited to R. Sgarro (PPL) SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14233A2772014-08-27027 August 2014 Request for Additional Information License Amendment Request to Change the Low Pressure Safety Limit ML14233A3392014-08-21021 August 2014 Draft RAIs for Susquehanna Steam Electric Station Units 1 and 2 License Amendment Request for Changes to the Low Pressure Safety Limits ML13298A7582014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC ME9607 and ME960) ML13298A7812014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator Minimum Steady State Frequency (TACs ME9609. ML14013A1502014-01-31031 January 2014 Request for Additional Information Regarding Relief Requests for the Fourth 10-Year Inservice Testing Interval 2024-05-07
[Table view] |
Text
From: Vaidya, Bhalchandra Sent: Tuesday, June 23, 2009 3:22 PM To: 'dlfilchner@pplweb.com'; 'Coddington, Cornelius T';
'ckhoffman@pplweb.com'; 'O'Rourke, Brenda W' Cc: Salgado, Nancy; Guzman, Richard; Boska, John; Pickett, Douglas; Wilson, George; Miller, Kenn
Subject:
Susquehanna Units 1 and 2, TAC Nos. ME0969 & ME0970- RAIs from Electrical Engineering Branch (EEEB)
SUBJECT:
PPL Susquehanna, Units 1 and 2. - REQUEST FOR ADDITIONAL INFORMATION (RAIs) RE: License Amendment Request for One-time extension of Allowable Outage Time in TS 3.8.1, LCO ACTION A3, from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 10 days for replacement of Transformer ST-20 (TAC NOS. ME0969 and ME0970)
By letter dated March 24, 2009, supplemented by letters dated April 30 and May 12, you submitted a license amendment request for One-time extension of Allowable Outage Time in TS 3.8.1, LCO ACTION A3, from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 10 days for replacement of Transformer ST-20.
The Electrical Engineering Branch (EEEB) needs the following additional information to complete its review of the license amendment request mentioned above:
===========================
REQUEST FOR ADDITIONAL INFORMATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
- 1) Provide a discussion regarding the lack of compensatory measures to replace the capability of the offsite circuit that will be out of service during this Completion Time (CT) given the length of the time requested (10 days vs. the 3 days allowed by Technical Specification [TS] 3.8.1) and considering the changes in electric grid performance postderegulation (NUREG-1784, Operating Experience Assessment - Effects of Grid Events on Nuclear Power Plant Performance). Specifically, the duration of loss of offsite power (LOOP) events has increased and the probability of a LOOP as a consequence of a reactor trip has increased. In addition, the evaluation completed as part of this NUREG was done before the August 14, 2003 Blackout in the Northeast which would further indicate that post-deregulation conditions challenge grid reliability.
The staff believes that these compensatory measures are needed during the extended offsite circuit CT to reduce the risk associated with loss of offsite power. In the past, other licensees have provided the following compensatory measures in their offsite circuit CT extension requests:
An alternate power source was specified with at least the capability as a delayed access circuit (per General Design Criterion (GDC) 17, Electric power systems, of Title 10 to the Code of Federal Regulations (10 CFR) Part 50, Appendix A) capable of supplying safe-shutdown loads on that unit. After entering the extended CT, this source was to be verified available every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and treated as protected equipment.
=======================
Please let me know ASAP, if you require a phone call discussion for the clarification of the NRC staff concerns and requirements. The call could be arranged as early as tomorrow, Wednesday, June 24, 2009, in the afternoon.
Please respond to these and othe RAIs from ITSB and APLA (PRA) promptly, hopefully, by July 7, 2009, so that the NRC staff can attempt to support the timely completion of its review.
Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Susquehanna Units 1 and 2, TAC Nos. ME0969 & ME0970- RAIs from Electrical Engineering Branch (EEEB)
Sent Date: 06/23/2009 2:46:53 PM Received Date: 06/23/2009 3:22:00 PM From: Vaidya, Bhalchandra Created By: Bhalchandra.Vaidya@nrc.gov Recipients:
dlfilchner@pplweb.com ('dlfilchner@pplweb.com')
Tracking Status: None ctcoddington@pplweb.com ('Coddington, Cornelius T')
Tracking Status: None ckhoffman@pplweb.com ('ckhoffman@pplweb.com')
Tracking Status: None BWORourke@pplweb.com ('O'Rourke, Brenda W')
Tracking Status: None Nancy.Salgado@nrc.gov (Salgado, Nancy)
Tracking Status: None Richard.Guzman@nrc.gov (Guzman, Richard)
Tracking Status: None John.Boska@nrc.gov (Boska, John)
Tracking Status: None Douglas.Pickett@nrc.gov (Pickett, Douglas)
Tracking Status: None George.Wilson@nrc.gov (Wilson, George)
Tracking Status: None Kenneth.Miller2@nrc.gov (Miller, Kenn)
Tracking Status: None
Post Office:
Files Size Date & Time MESSAGE 20022 06/23/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: