May. 15, 2009 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2009-23314 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 05/15/2009 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/05/2009 ADD MANUAL TABLE OF CONTENTS DATE: 05/14/2009 CATEGORY: DOCUMENTS TYPE: TRM1 4oo/

May. 15, 2009 Page 2 of 2 ID: TEXT LOES REPLACE: REV:50 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANIA.L Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: C)5/14/2009 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 50 04/16/2009

Title:

LIST OF EF FECTIVE SECTIONS TEXT TOC 16

Title:

TABLE OF CONTENTS 16 04/16/2009/1^/- /

TEXT 1.1 0 11/18/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/'04/20<0^5

Title:

PLANT PROGRAMS AND SETPOINTS PLANT-,ýROGRAMS TEXT 2.2 7 05/Q2342008

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN 3920 jALDN 4502 LDCN 4414 TEXT 3.0 05/23/2008

Title:

TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION LDCN 3920 LDCN 4502 TEXT 3.1.4 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE Page 1 of 15 Report Date: 05/14/09

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.2.1 9 04/17/2008

Title:

CORE OPERATING LIMITS REPORT (COLR)

TEXT 3.3.1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5 05/23/2008

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3. 3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION LDCN 4502 TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION Report Date: 05/14/09 Page 2.

Page2 of 15 15 Report Date: 05/14/09

SSES MANUAL

. Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION D TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 1_5 Report Date: 05/14/09

SSES MANUAL Manual Name: TRM1 Manual.Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 6 11/09/2007

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION LDCN 3503 TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 05/14/09 Page 4 Page 4 of of 15 15 Report Date: 05/14/09

SSES- MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2 06/27/2008

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 4 06/21/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 0 04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 1 02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THER.MAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of 15 Report Date: 05/14/09

SSES MKANIAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 0 11/18/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 0 11/18/2002-

Title:

ELECTRICAL POWER DEGRADED VOLTAGE 'PROTECTION TEXT 3.8.6 0 11/18/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0 12/14-/2006

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM, TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006"

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08'/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1 04/26&/2006

Title:

,MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

Report Date: 05/14/09 Page 6.~. of of 15 15 Repbrt Date: 05/14/09

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 -04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

.*RADIOACTIVE EFFLUENTS. GASEOUS RADWASTE TREATMENT. SYSTEM TEXT 3.11.2.5 3 11/14/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 3 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11,3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE Report Date: 05/14/09 Page7.7~

Page Of 15 of .1_5 Report Date: 05/14/09

SSEs&MANUAL Manual Name: TRMI.

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT I TEXT 3.11.4.1 4 08/08/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19./2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS' REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT B3.0 4 05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1i 11/091/2007

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/191/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/311/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL- ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 '11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE-TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

Page 8 of 15 Report Date: 05/14/09

SSES MANTUA-L Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.1 0 11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09/2007

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 3 11/09/2007

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 1 12/18/2008

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Report Date: 05/14/09 Pages Page 9 of .15.

of .15 Report Date: 05/14/09

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/ýLOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION'POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Report Date: 05/14/09 Page j~

10 of of 15 15 Report Date: 05/14/09

SSES MANUAL

. Manual Name:

Manual

Title:

TRM1 TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07/2008

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR Report Date: 05/14/09 11 Page 11 of of 15 15 Report Date: 05/14/09

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUALUNIT 1 TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 2 06/27/2008

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3 06/21/2007

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 0 ý04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT B3-8.1 1 02/04/2005

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES Report Date: 05/14/09 Page iZ 12 of of 15 15 Report Date: 05/14/09

SSES MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 0 12/14/2006

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2008

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION Page 13 of 15 Report Date: 05/14/09

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT I TEXT B3.11.1.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2 01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM Report Date: 05/14/09

.14 Page 14 of of 15 15 Report Date: 05/14/09

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING Report Date: 05/14/09 Page 15 15 of of 15 15 Report Date: 05/14/09

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 04/07/2009 1.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM / 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/02/1999 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Page TRM / 2.0-8 03/27/2008 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Page TRM / 3.0-1 04/14/2008 Page TRM / 3.0-2 04/12/2007 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS PageTRM/3.1-1 10/31/2007 Pages TRM / 3.1-2 thrdugh TRM'/ 3.1-5 08/31/1998 Page TRM / 3. 1-61"/ 03/22/2006 Page TRMI/3.1-7",,, 04/07/2009 Page TRM /3 1-8 03/27/2008 Pages TRM /-3.1-9 and TRM / 3.1-9a 02/18/1999 Page ,TRM /3.1-10, 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM /-3.2-1 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-44 03/17/2008 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 08/31/1998 Page TRM / 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 Page TRM / 3.3-9 04/12/2007 Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11a 04/14/2008 SUSQUEHANNA - UNIT 1 TAM / LOES-1 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 Pages TRM / 3.3-27 and TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 TRM / LOES-2 EFFECTIVE DATE 04/07/2009 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 1 1 TRM / LOES-2 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM 3.7-26 08/02/1999 Page TRM 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 08/09/2005 Page TRM / 3.7-30 08/25/2005 Pages TRM / 3.7-31 and TRM / 3.7-32 11/16/2001 Page TRM / 3.7-33 01/09/2004 Page TRM / 3.7-34 11/16/2001 Page TRM / 3.7-34a 10/05/2002 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Pages 3.7-38 and 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 02/14/2005 Page TRM / 3.7-41a 06/20/2008 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Pages TRM / 3.7-44 through TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Page TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 through TRM / 3.8-4 01/28/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages 3.8-13 and 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Pages TRM / 3.8-26 through TRM / 3.8-29 11/29/2006 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 and 3.10-3 08/31/1998 Pages 3.10-2 and 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 03/31/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 and 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 through TRM / 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM /3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM /3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 through TRM / 3.11.32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 TRM / LOES-5 EFFECTIVE DATE 04/07/2009 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 1 1 TRM / LOES-5 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998

'B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B 3.3-2a 10/31/2007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM I B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Page TRM / B 3.3-18 12/11/2008 Page TRM / B 3.3-19 05/16/2008 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23 04/07/2009 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 and TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM/ B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-10a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-1 la 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a 08/02/1999 Page TRM / B 3.7-14b 01/09/2004 Pages TRM I B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Page TRM / B 3.7-22 and TRM I B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/200 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page. TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-40 04/01/2009 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 08/10/2004 Page TRM / B 3.8-4a 04/02/2002 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-24 11/29/2006 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11.23 11/14/2006 Page TRM / B 3.11.23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.7-31 through B 3.7-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 04/07/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 50 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM1 text LOES 3/16/09 TRM / LOES-9 EFFECTIVE DATE 04/07/2009 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 1 1 TRM / LOES-9 EFFECTIVE DATE 04/07/2009