Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NRC 2009-0059, Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors29 June 2009Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 429 June 2009Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
NRC 2009-0047, Periodic Update of the Final Safety Analysis Report26 June 2009Periodic Update of the Final Safety Analysis ReportAging Management
NRC 2009-0062, Technical Specification Bases Change Summary25 June 2009Technical Specification Bases Change Summary
NRC 2008-0063, Technical Requirements Manual Change Summary25 June 2009Technical Requirements Manual Change SummaryBoric Acid
ML09181069125 June 2009Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80
IR 05000266/200900924 June 2009EA-09-012, Point Beach Nuclear Generating Plant, Units 1 and 2, NRC Inspection Report Nos. 05000266-09-009(DRS), 05000301-09-009(DRS)
ML09174067021 June 2009Er 05000266-09-301 (Drs); 05000301-09-301 (DRS) on 05/11/09 - 05/26/09 for Point Beach, Units 1 and 2Job Performance Measure
IR 05000266/200930121 June 2009Er 05000266/2009301(DRS); 05000301/2009301(DRS); on 05/11/09 - 05/26/09; NextEra Energy, LLC; Point Beach Nuclear Plant, Units 1 and 2; Initial License Examination ReportJob Performance Measure
TAC:ME053218 June 2009
NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate17 June 2009License Amendment Request 261 Supplement 2 Extended Power UprateSafe Shutdown
GOTHIC
NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate17 June 2009License Amendment Request 261 Supplement 1 Extended Power UprateSafe Shutdown
Boric Acid
High winds
Fire Barrier
Stroke time
Tornado Missile
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Earthquake
NRC 2009-0053, Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706)12 June 2009Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706)Mission time
Probabilistic Risk Assessment
Coatings
VT-2
Foreign Material Exclusion
Fuel cladding
Through-Wall Leak
Dissimilar Metal Weld
ML0916007299 June 2009Acceptance Review for Mururoa V4F1 Supplied Air SuitsMururoa
TAC:ME11569 June 2009
NRC 2009-0065, Submittal of Revision to Security Plan4 June 2009Submittal of Revision to Security Plan
NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term1 June 2009Response to Request for Additional Information License Amendment Request 241 Alternative Source TermUnanalyzed Condition
L-2009-131, Units 1 and 2 - Official Service List Change28 May 2009Units 1 and 2 - Official Service List Change
ML09149048828 May 2009Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency
NRC 2009-0057, Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control22 May 2009Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control
ML09140019320 May 2009Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to a Nuclear Safety Culture Survey in 2008 - Point Beach Nuclear Plant
NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term15 May 2009Response to Request for Additional Information License Amendment Request 241 Alternative Source TermSafe Shutdown Earthquake
L-2009-122, Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change14 May 2009Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change
ML09134028914 May 2009Summary of Meeting Between NRC Region III Management and NextEra Energy Point Beach LLC Representatives to Discuss the Nrc'S Assessment
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Administrative JPMs11 May 20092009 Point Beach Initial License Examination Proposed Administrative JPMsBoric Acid
Grab sample
Nuclear Accident Reporting System
Job Performance Measure
Pressure Boundary Leakage
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios11 May 20092009 Point Beach Initial License Examination Proposed Dynamic Simulator ScenariosDownpower
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Control Room JPMs11 May 20092009 Point Beach Initial License Examination Proposed Control Room JPMsJob Performance Measure
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed In-Plant JPMs11 May 20092009 Point Beach Initial License Examination Proposed In-Plant JPMsSafe Shutdown
Job Performance Measure
ML10092027811 May 20092009 Point Beach Initial License Examination Proposed Dynamic Simulator ScenariosPower change
Downpower
NRC 2009-0022, 2009 Point Beach Initial License Examination ES-301-6 Forms11 May 20092009 Point Beach Initial License Examination ES-301-6 Forms
ML10092027511 May 20092009 Point Beach Initial License Examination Proposed In-Plant JPMsSafe Shutdown
Job Performance Measure
ML10092027211 May 20092009 Point Beach Initial License Examination Proposed Control Room JPMsJob Performance Measure
ML10092027111 May 20092009 Point Beach Initial License Examination Proposed Administrative JPMsBoric Acid
Grab sample
Nuclear Accident Reporting System
Job Performance Measure
Pressure Boundary Leakage
ML09259018411 May 20092009 Point Beach Nuclear Plant Initial Examination Administrative Files
NRC 2009-0019, 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal11 May 20092009 Point Beach Nuclear Plant Initial Examination Outline Submittal
ML10092029411 May 20092009 Point Beach Initial License Examination ES-301-6 Forms
ML10092029611 May 20092009 Point Beach Initial License Examination Proposed Written ExaminationSafe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Fuel cladding
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Written Examination11 May 20092009 Point Beach Initial License Examination Proposed Written ExaminationSafe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Fuel cladding
ML09169056710 May 20092009 Point Beach Nuclear Plant Initial License Examination Administered RO and SRO Initial Examinations and Answer KeysSafe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Fuel cladding
Downpower
IR 05000266/20090068 May 2009IR 05000266-09-006; 05000301-09-006; NextEra Energy Point Beach, LLC; on 03/09/2009 - 03/27/2009; Point Beach Nuclear Power Plant, Unit 1 and Unit 2; Biennial Baseline Problem Identification and Resolution InspectionCondition Adverse to Quality
Significance Determination Process
Operability Determination
Power Uprate
NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix8 May 2009Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance MatrixLarge early release frequency
Deep Dose Equivalent
Backfit
L-2009-115, Response to Apparent Violations Inspection Report7 May 2009Response to Apparent Violations Inspection Report
NRC 2009-0041, Fall 2008 Unit 1 (U1R31), Steam Generator Tube Inspection Report7 May 2009Fall 2008 Unit 1 (U1R31), Steam Generator Tube Inspection ReportNondestructive Examination
ML0912605775 May 2009Ltr. 05/05/09 Point Beach Re Operator Licensing Examination Approval
IR 05000266/20090021 May 2009IR 05000266-09-002, 05000301-09-002, on 01/01/2009-03/31/2009, Point Beach Nuclear Plant, Units 1 & 2; Equipment Alignment and Maintenance EffectivenessBoric Acid
High winds
High Radiation Area
Ultimate heat sink
Mission time
Tornado Missile
Hydrostatic
Past operability
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Tornado-Generated Missile
Significance Determination Process
Tornado Missile Protection
Large early release frequency
Operability Determination
Fire Protection Program
Power change
Flow Induced Vibration
L-2009-098, Units 1 and 2 - Official Service List Change1 May 2009Units 1 and 2 - Official Service List Change
NRC 2009-0052, Submittal of Cycle 32 (U1C32) Core Operating Limit Report30 April 2009Submittal of Cycle 32 (U1C32) Core Operating Limit ReportShutdown Margin
NRC 2009-0048, Submittal of Annual Individual Monitoring Report for Cy 200830 April 2009Submittal of Annual Individual Monitoring Report for Cy 2008
NRC-2009-0046, Annual Monitoring Report, Cover Letter Through Part D, Groundwater Monitoring30 April 2009Annual Monitoring Report, Cover Letter Through Part D, Groundwater MonitoringGrab sample
Offsite Dose Calculation Manual
Chernobyl
NRC 2009-0046, Annual Monitoring Report, Appendix 1 Through End30 April 2009Annual Monitoring Report, Appendix 1 Through EndGrab sample