NRC 2009-0059, Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | 29 June 2009 | Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | |
L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 | 29 June 2009 | Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Fire Barrier Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Process Control Program Safeguards Contingency Plan Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
NRC 2009-0047, Periodic Update of the Final Safety Analysis Report | 26 June 2009 | Periodic Update of the Final Safety Analysis Report | Aging Management |
NRC 2009-0062, Technical Specification Bases Change Summary | 25 June 2009 | Technical Specification Bases Change Summary | |
NRC 2008-0063, Technical Requirements Manual Change Summary | 25 June 2009 | Technical Requirements Manual Change Summary | Boric Acid |
ML091810691 | 25 June 2009 | Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80 | |
IR 05000266/2009009 | 24 June 2009 | EA-09-012, Point Beach Nuclear Generating Plant, Units 1 and 2, NRC Inspection Report Nos. 05000266-09-009(DRS), 05000301-09-009(DRS) | |
ML091740670 | 21 June 2009 | Er 05000266-09-301 (Drs); 05000301-09-301 (DRS) on 05/11/09 - 05/26/09 for Point Beach, Units 1 and 2 | Job Performance Measure |
IR 05000266/2009301 | 21 June 2009 | Er 05000266/2009301(DRS); 05000301/2009301(DRS); on 05/11/09 - 05/26/09; NextEra Energy, LLC; Point Beach Nuclear Plant, Units 1 and 2; Initial License Examination Report | Job Performance Measure |
TAC:ME0532 | 18 June 2009 | | |
NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate | 17 June 2009 | License Amendment Request 261 Supplement 2 Extended Power Uprate | Safe Shutdown GOTHIC |
NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate | 17 June 2009 | License Amendment Request 261 Supplement 1 Extended Power Uprate | Safe Shutdown Boric Acid High winds Fire Barrier Stroke time Tornado Missile Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Earthquake |
NRC 2009-0053, Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) | 12 June 2009 | Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) | Mission time Probabilistic Risk Assessment Coatings VT-2 Foreign Material Exclusion Fuel cladding Through-Wall Leak Dissimilar Metal Weld |
ML091600729 | 9 June 2009 | Acceptance Review for Mururoa V4F1 Supplied Air Suits | Mururoa |
TAC:ME1156 | 9 June 2009 | | |
NRC 2009-0065, Submittal of Revision to Security Plan | 4 June 2009 | Submittal of Revision to Security Plan | |
NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term | 1 June 2009 | Response to Request for Additional Information License Amendment Request 241 Alternative Source Term | Unanalyzed Condition |
L-2009-131, Units 1 and 2 - Official Service List Change | 28 May 2009 | Units 1 and 2 - Official Service List Change | |
ML091490488 | 28 May 2009 | Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency | |
NRC 2009-0057, Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control | 22 May 2009 | Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control | |
ML091400193 | 20 May 2009 | Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to a Nuclear Safety Culture Survey in 2008 - Point Beach Nuclear Plant | |
NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term | 15 May 2009 | Response to Request for Additional Information License Amendment Request 241 Alternative Source Term | Safe Shutdown Earthquake |
L-2009-122, Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change | 14 May 2009 | Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change | |
ML091340289 | 14 May 2009 | Summary of Meeting Between NRC Region III Management and NextEra Energy Point Beach LLC Representatives to Discuss the Nrc'S Assessment | |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Administrative JPMs | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Administrative JPMs | Boric Acid Grab sample Nuclear Accident Reporting System Job Performance Measure Pressure Boundary Leakage |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios | Downpower |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Control Room JPMs | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Control Room JPMs | Job Performance Measure |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed In-Plant JPMs | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed In-Plant JPMs | Safe Shutdown Job Performance Measure |
ML100920278 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios | Power change Downpower |
NRC 2009-0022, 2009 Point Beach Initial License Examination ES-301-6 Forms | 11 May 2009 | 2009 Point Beach Initial License Examination ES-301-6 Forms | |
ML100920275 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed In-Plant JPMs | Safe Shutdown Job Performance Measure |
ML100920272 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Control Room JPMs | Job Performance Measure |
ML100920271 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Administrative JPMs | Boric Acid Grab sample Nuclear Accident Reporting System Job Performance Measure Pressure Boundary Leakage |
ML092590184 | 11 May 2009 | 2009 Point Beach Nuclear Plant Initial Examination Administrative Files | |
NRC 2009-0019, 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal | 11 May 2009 | 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal | |
ML100920294 | 11 May 2009 | 2009 Point Beach Initial License Examination ES-301-6 Forms | |
ML100920296 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Written Examination | Safe Shutdown Boric Acid Shutdown Margin Time to boil Fuel cladding |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Written Examination | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Written Examination | Safe Shutdown Boric Acid Shutdown Margin Time to boil Fuel cladding |
ML091690567 | 10 May 2009 | 2009 Point Beach Nuclear Plant Initial License Examination Administered RO and SRO Initial Examinations and Answer Keys | Safe Shutdown Boric Acid Shutdown Margin Time to boil Fuel cladding Downpower |
IR 05000266/2009006 | 8 May 2009 | IR 05000266-09-006; 05000301-09-006; NextEra Energy Point Beach, LLC; on 03/09/2009 - 03/27/2009; Point Beach Nuclear Power Plant, Unit 1 and Unit 2; Biennial Baseline Problem Identification and Resolution Inspection | Condition Adverse to Quality Significance Determination Process Operability Determination Power Uprate |
NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix | 8 May 2009 | Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix | Large early release frequency Deep Dose Equivalent Backfit |
L-2009-115, Response to Apparent Violations Inspection Report | 7 May 2009 | Response to Apparent Violations Inspection Report | |
NRC 2009-0041, Fall 2008 Unit 1 (U1R31), Steam Generator Tube Inspection Report | 7 May 2009 | Fall 2008 Unit 1 (U1R31), Steam Generator Tube Inspection Report | Nondestructive Examination |
ML091260577 | 5 May 2009 | Ltr. 05/05/09 Point Beach Re Operator Licensing Examination Approval | |
IR 05000266/2009002 | 1 May 2009 | IR 05000266-09-002, 05000301-09-002, on 01/01/2009-03/31/2009, Point Beach Nuclear Plant, Units 1 & 2; Equipment Alignment and Maintenance Effectiveness | Boric Acid High winds High Radiation Area Ultimate heat sink Mission time Tornado Missile Hydrostatic Past operability Temporary Modification Functionality Assessment Condition Adverse to Quality Tornado-Generated Missile Significance Determination Process Tornado Missile Protection Large early release frequency Operability Determination Fire Protection Program Power change Flow Induced Vibration |
L-2009-098, Units 1 and 2 - Official Service List Change | 1 May 2009 | Units 1 and 2 - Official Service List Change | |
NRC 2009-0052, Submittal of Cycle 32 (U1C32) Core Operating Limit Report | 30 April 2009 | Submittal of Cycle 32 (U1C32) Core Operating Limit Report | Shutdown Margin |
NRC 2009-0048, Submittal of Annual Individual Monitoring Report for Cy 2008 | 30 April 2009 | Submittal of Annual Individual Monitoring Report for Cy 2008 | |
NRC-2009-0046, Annual Monitoring Report, Cover Letter Through Part D, Groundwater Monitoring | 30 April 2009 | Annual Monitoring Report, Cover Letter Through Part D, Groundwater Monitoring | Grab sample Offsite Dose Calculation Manual Chernobyl |
NRC 2009-0046, Annual Monitoring Report, Appendix 1 Through End | 30 April 2009 | Annual Monitoring Report, Appendix 1 Through End | Grab sample |