NRC 2009-0047, Periodic Update of the Final Safety Analysis Report

From kanterella
Jump to navigation Jump to search
Periodic Update of the Final Safety Analysis Report
ML091820400
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/26/2009
From: Meyer L
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2009-0047
Download: ML091820400 (2)


Text

NEXTera ENERGYC POINT BEACH June 26, 2009 NRC 2009-0047 10 CFR 50.71 (e) 10 CFR 54.37(b)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Periodic Update of the Final Safety Analysis Report In accordance with the requirements of 10 CFR 50.71(e) and 10 CFR 54.37(b), this letter submits a periodic update to the PBNP Final Safety Analysis Report (FSAR).

No systems, structures or components have been identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CFR 54.21.

The enclosures contain page change instructions, a list of effective pages, a description of changes, and replacement FSAR pages. The package reflects changes since the last submittal of June 25, 2008.

This letter contains no new commitments and no revisions to existing commitments.

I certify that the information in this submittal accurately presents changes made since the previous submittal necessary to reflect information and analyses submitted to the NRC or prepare pursuant to NRC requirements, and changes made under the provisions of 10 CFR 50.59.

Very truly yours, NextEra 4Erg Point Beach, LLC arMeyer Site Vice President Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW (less enclosures)

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

June 2009 Document'. Control Desk U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08H 4A 11555 Rockville Pike Rockville, MD 20852-2738 Manual: -FI*s1*

Manual No.: 80 Issue Date: June 2009 The following changes have been made to the FSAR. Please remove the previous revision(s) and replace them IMMEDIATELY with the current revision(s) that are attached.

See page Change Instructions and Description of Changes.

AFTER UPDATING YOUR MANUAL, PLEASE SIGN AND RETURN THIS RECEIPT ACKNOWLEDGMENT WITHIN 10 DAYS TO: POINT BEACH NUCLEAR PLANT, DISTRIBUTION CENTER, 6590 NUCLEAR ROAD, TWO RIVERS, WI 54241.

Submit PBF-0095 for any controlled manual changes or cancellations. If you have any questions, please call Document Control at ext. 7638.

                • Special Distribution Notes********

Distribution Centeýr - PBNP Date