L-2009-131, Units 1 and 2 - Official Service List Change

From kanterella
Jump to navigation Jump to search

Units 1 and 2 - Official Service List Change
ML091520030
Person / Time
Site: Saint Lucie, Point Beach, Seabrook, Turkey Point, Duane Arnold  NextEra Energy icon.png
Issue date: 05/28/2009
From: Hughes R
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2009-131
Download: ML091520030 (2)


Text

Florida Power & Light Company, 700 Universe Boulevard, P.O. Box 14000, Juno Beach, FL 33408-0420 0

MAY 2 8 2009 F=PL L-2009-131 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re:

Florida Power and Light Company St. Lucie Units 1 and 2 Docket Nos. 50-335, 50-389 Turkey Point Units 3 and4 Docket Nos. 50-250, 50-251 NextEra Energy Seabrook, LLC Seabrook Station Docket No. 50-443 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center Docket No. 50-331 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2 Docket Nos. 50-266, 50-301 Official Service List Change The purpose of this letter is to request changes to the official service lists (NRR and Region) for Florida Power and Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4 (collectively referred to as FPL) and its affiliates, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) the licensee for Seabrook Station; NextEra Energy Duane Arnold, LLC (NextEra Energy Duane Arnold), the licensee for Duane Arnold Energy Center; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy).

Effective immediately,, please make the following title change only.

Change From Change To Mitch Ross Mitch Ross Managing Attorney Vice President and Associate Florida Power & Light Company General Counsel P.O. Box 14000 Florida Power & Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 M () -D 5 WXJ an FPL Group company

L-2009-131 Page 2 In addition, please remove Don E. Grissette from all correspondence relating to the subject docket numbers.

Remove Don E. Grissette Vice President, Nuclear Operations -

South Region Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Please contact Mr. Mark Dryden (561) 694-4430, if there are any questions.

V yoryours

/

Rober JHu es" DirecO, Li en:f'n nd Performance Improvement cc:

Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region III USNRC Project Manger, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USNRC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior-Resident Inspector, USNRC, Point Beach