ML091810691

From kanterella
Jump to navigation Jump to search
Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80
ML091810691
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/25/2009
From:
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML091810691 (2)


Text

June 25, 2009 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08H 4A 11555 Rockville Pike Rockville, MD 20852-2738 Manual: FSAR Manual No.: 80 Issue Date: June 25, 2009 An error was found on the following page after issuance. Please replace it with the attached page and add the Appendix D tab.

Figure 7.6-3 on page 7.6-23 of 25.

AFTER UPDATING YOUR MANUAL, PLEASE SIGN AND RETURN THIS RECEIPT ACKNOWLEDGMENT WITHIN 10 DAYS TO: POINT BEACH NUCLEAR PLANT, DISTRIBUTION CENTER, 6590 NUCLEAR ROAD, TWO RIVERS, WI 54241.

Submit PBF-0095 for any controlled manual changes or cancellations. If you have any questions, please call Document Control at ext. 7638.

                • Special Distribution Notes********

Distribution Center - PBNP Date

&J~S

Instrumentation Systems FSAR Section 7.6 Figure 7.6-3 EX-CORE DETECTOR LOCATIONS RELATIVE TO CORE 2 3 4 5 6 7 8 9 10 11. 12 13 C

2700

- LoopB PR

.Hot Leg PDR Loop A N-43 Cold Leg

/

- -I-I-- t - -I--I ~-I*-~~

/

F-G - 3 1800 006 H-t -

IIIIIIII~IIIL11 K-

/ I -I - 1.-S I-II I NPR Loop A LoopB PRN-41 44 Hot Leg Cold Leg 90.

NOTES:

PR: Power Range - Uncompensated Ion Chamber IR: Intermediate Range - Compensated Ion Chamber SR: Source Range - Proportional Counter WR: Wide Range - High Sensitivity Fission Chamber UFSAR 2008 Page 7.6-23 of 25