June 25,2009 NRC 2008-0063 10 CFR 50.71(e)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units Iand 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM).

Enclosure 1 contains the TRM change summary for the period July I, 2008, through December 31,2008. NextEra previously submitted the TRM change summary for January I, 2008, through June 30,2008, on June 30,2008 (ML081830355).

This letter contains no new commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC flJames Costedio Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE I NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS IAND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE

SUMMARY

Date of Affected Affected Summary Change Section Page($)

08/05/08 TRM 3.9.4 3.4.9-2 Replaced containment "isolation" valves with containment "closure" valves and added specific valve numbers in Section Iof Table 3.9.4-1, per Amendments 2311236.

08/15/08 TRM 3.4.1 3.4.1-1 Removed reference to "radiochemical E-Bar" in TLCO 3.4.1 and in the CONDITION and REQUIRED ACTION sections. Removed TSR 3.4.1.2.

3.4.1-2 Removed reference to "radiochemical E-Bar" and TSR 3.4.1.2 in the TLCO and APPLICABILITY section, and the ACTIONS section. Removed TSR 3.4.1.2 in SURVEILLANCE REQUIREMENTS section. Added reference to Amendments 2331238.

10/03/08 TRM 3.5. I 3.5.1-4 Changed the minimum boric acid storage tank (BAST) temperatures for each boric acid solution concentration listed in Table 3.5.1-1. Changed Reference (4) to state that the BAST temperature limits include instrument uncertainty based upon new parametric value calculation.

Removed Reference (5).

3.5.1-7 Removed last two sentences in TSR 3.5.1 .Iof SURVEILLANCE REQUIRMENTS section, based upon new parametric value calculation.

10115/08 TRM 4.3 4.3-1 Removed References 3.5, 3.6, 3.7, 3.8, 3.9, and 3.10, and renumbered remaining sections, based upon cancelations and revisions to plant procedures.

4.3-2 Removed References to NP 10.2.1, NP 10.2.2, NP 10.2.4, TRPR 34.0, TRPR 11.0 and TRQM 34.3.86, in Section 5.0, based upon cancelations and revisions to plant procedures.

4.3-3 Removed Reference to NQAP in section 9.0. Changed reference from manager-Chemistryto Chemistry group manager in Section 10.0.

Page Iof 2

ENCLOSURE I NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE

SUMMARY

Date of Affected Affected Summary Change Section Page(s) 10/23/08 TRM 2.1 1 of 16 Revision 9 of the Unit 1 Core Operating Limits UI through Report (COLR) (ML083010231). Changes reflect the 16of16 UnitICycleZcorereload.

12/15/08 TRM 3.9.3 3.9.3-5 Correct NRC letter number in REFERENCES section.