Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-04-084, Comment (5) of L. William Pearce on Behalf of Firstenergy Nuclear Operating Co Regarding Report on the Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants30 June 2004Comment (5) of L. William Pearce on Behalf of Firstenergy Nuclear Operating Co Regarding Report on the Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants
TAC:MC288828 June 2004
ML04197016628 June 2004RAI, Security Plan Sections 1-9 (TAC MC2888 and MC2889)
ML05262005722 June 2004E-mail from S. Barber of USNRC to S. Johnson of USNRC, Regarding Urgent - ARB Schedule for 3/23/04
L-04-083, Response to Request for Additional Information Regarding Bulletin 2003-0115 June 2004Response to Request for Additional Information Regarding Bulletin 2003-01Boric Acid
Severe Accident Management Guideline
Troxler
ML0411904658 June 2004Reassignments in Project Directorate I
L-04-080, Letter of Intent Regarding Conversion of Current Technical Specifications to Improved Technical Specifications7 June 2004Letter of Intent Regarding Conversion of Current Technical Specifications to Improved Technical Specifications
L-04-079, May 2004 Monthly Operating Report for Beaver Valley Power Station7 June 2004May 2004 Monthly Operating Report for Beaver Valley Power Station
L-04-073, License Amendment Request Nos. 317 and 190, Revising Technical Specifications to Permit Each Unit to Be Operated with an Atmospheric Containment Design2 June 2004License Amendment Request Nos. 317 and 190, Revising Technical Specifications to Permit Each Unit to Be Operated with an Atmospheric Containment DesignSafe Shutdown
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Probabilistic Risk Assessment
High Energy Line Break
Annual Radioactive Effluent Release Report
Flow Accelerated Corrosion
Process Control Program
Large early release frequency
Stress corrosion cracking
Integrated leak rate test
Exemption Request
GOTHIC
Power Uprate
Measurement Uncertainty Recapture
Manual Operator Action
L-04-077, License Amendment Request Nos. 309 and 1812 June 2004License Amendment Request Nos. 309 and 181
L-04-074, License Amendment Request Nos. 326 and 1771 June 2004License Amendment Request Nos. 326 and 177Boric Acid
Shutdown Margin
Loop seal
Stroke time
Pressure and Temperature Limits Report
L-04-069, Use of Encryption Software for Electronic Transmission of Safeguards Information1 June 2004Use of Encryption Software for Electronic Transmission of Safeguards Information
L-04-070, Beaver Vallev Power Station Discharge Monitoring Report for April 200428 May 2004Beaver Vallev Power Station Discharge Monitoring Report for April 2004Grab sample
ML04148051327 May 2004Requalification Program Inspection - Beaver Valley Power Station, Unit 1 Dtd 5/27/04
IR 05000334/200400927 May 2004IR 05000334-04-009, & IR 05000412-04-009, on 04/19/2004 Through 04/23/2004, for Beaver Valley Power Station, Physical Security Baseline Inspection
L-04-068, Response to Request for Additional Information in Support of LAR No. 322 Steam Generator Tube Repair Using Alloy 800 Leak Limiting Sleeves27 May 2004Response to Request for Additional Information in Support of LAR No. 322 Steam Generator Tube Repair Using Alloy 800 Leak Limiting SleevesNon-Destructive Examination
Operating Basis Earthquake
Nondestructive Examination
Stress corrosion cracking
Eddy Current Testing
Eddy-Current Testing
ML04197063126 May 2004FEMA Letter from Mr. Darrell Hammons to Mr. Hubert Miller Regarding Deficiency at Beaver Valley Power Station, 05/11/04 EP ExercisePotassium iodide
ML04147006026 May 2004Independent Survey of Power-Reactor Licensees
ML04188032326 May 2004FEMA Identification of Deficiency - Beaver ValleyPotassium iodide
L-04-072, License Amendment Request Nos. 306 and 176 Re Revision to Current 72 Hours Action Allowed Outage Time26 May 2004License Amendment Request Nos. 306 and 176 Re Revision to Current 72 Hours Action Allowed Outage TimeSafe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Recently irradiated fuel
Offsite Circuit
Hourly Fire Watch
Overspeed trip
Manual Operator Action
ML04146048225 May 2004Notice of Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Re.: Beaver Valley, Unit No. 1, One-cycle Approval of Steam Generator Tube Inspection and Repair Criteria Using W* Methodology
L-04-066, Inservice Testing Programs, Proposed Revisions 1K and 2I21 May 2004Inservice Testing Programs, Proposed Revisions 1K and 2I
TAC:MC186919 May 2004
ML04093013019 May 2004Unit, 1 and 2 - License Amendments 259 & 142 Elimination of Requirements for Hydrogen Recombiners and Hydrogen MonitorsProbabilistic Risk Assessment
Fuel cladding
ML04145011219 May 2004Unit, 1 and 2 - Tech Spec Pages for License Amendments 259 & 142 Elimination of Requirements for Hydrogen Recombiners and Hydrogen MonitorsUltimate heat sink
TAC:MC187019 May 2004
ML04145011619 May 2004Unit, 1 and 2, Tech Spec Pages for License Amendments 259 & 142 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors
ML04103008214 May 2004License Amendment, Extend Engineered Safeguards Features Actuation System (ESFAS) Slave Relay Surveillance Test IntervalProbabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Power Uprate
ML04138029214 May 2004Technical Specification, Extend Engineered Safeguards Features Actuation System (ESFAS) Slave Relay Surveillance Test Interval
ML04120078512 May 2004RAI, 60-Day Response to Nuclear Regulatory Commission Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
ML04127051311 May 2004(BVPS-1) - Request for Additional Information Concerning License Amendment Request No. 322 - Steam Generator Repair Using Alloy 800 Leak Limiting SleevesNondestructive Examination
Stress corrosion cracking
Eddy-Current Testing
IR 05000334/200400310 May 2004IR 05000334-04-003, IR 05000412-04-003, on 01/01/2004 - 03/31/2004, Beaver Valley Power Station Units 1 & 2; Routine Integrated Inspection ReportSafe Shutdown
Unanalyzed Condition
High Radiation Area
Mission time
Internal Flooding
Temporary Modification
Locked High Radiation Area
Operability Determination
Maintenance Rule Program
Scaffolding
Downpower
L-04-063, April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 27 May 2004April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2
L-04-065, No. 2, Change to Requested Implementation Period for License Amendment Request Nos. 316 and 1893 May 2004No. 2, Change to Requested Implementation Period for License Amendment Request Nos. 316 and 189
ML04125056730 April 20042003 Annual Radioactive Effluent Release Report (Annual RETS Report)Grab sample
Offsite Dose Calculation Manual
Temporary Modification
Annual Radioactive Effluent Release Report
ML04125057430 April 20042003 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML04125057130 April 20042003 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Stress corrosion cracking
Power change
L-04-062, Commitment Changes and Report of Facility Changes, Tests and Experiments30 April 2004Commitment Changes and Report of Facility Changes, Tests and ExperimentsGrace period
L-04-051, Annual Environmental Report, Non-Radiological30 April 2004Annual Environmental Report, Non-Radiological
L-04-057, Units I and 2 - Annual Radioactive Effluent Release Report for 2003, and Annual Radiological Environmental Operating Report for 200330 April 2004Units I and 2 - Annual Radioactive Effluent Release Report for 2003, and Annual Radiological Environmental Operating Report for 2003Offsite Dose Calculation Manual
Temporary Modification
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
L-04-043, (Bvps), Unit No. 1 and No. 2, Supplemental Response to the April 29, 2003 Orders to BVPS28 April 2004(Bvps), Unit No. 1 and No. 2, Supplemental Response to the April 29, 2003 Orders to BVPSEnforcement Discretion
L-04-059, NPDES Discharge Monitoring Report, Permit No. PA002561528 April 2004NPDES Discharge Monitoring Report, Permit No. PA0025615
L-04-039, Emergency Response Data System (ERDS)22 April 2004Emergency Response Data System (ERDS)Reactor Vessel Water Level
Feedwater Heater
L-04-054, Occupational Radiation Exposure Report21 April 2004Occupational Radiation Exposure Report
ML04114033521 April 2004Part 21 Notification Involving Voltage Monitoring Relays
ML05140031820 April 2004Summary of Annual Assessment Meeting with Firstenergy Nuclear Operating Company (FENOC) Regarding Beaver Valley Station
ML04078091719 April 2004Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit 1
L-04-037, Letter Forwarding 2003 Firstenergy Corp. Annual Report12 April 2004Letter Forwarding 2003 Firstenergy Corp. Annual Report
ML04078095512 April 2004Withholding from Public Disclosure, WCAP-16144-P, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetration to Support Continued Operation: Beaver Valley Unit 2 (Proprietary)
TAC:MC023712 April 2004