ML041450116

From kanterella
Jump to navigation Jump to search

Unit, 1 and 2, Tech Spec Pages for License Amendments 259 & 142 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors
ML041450116
Person / Time
Site: Beaver Valley
Issue date: 05/19/2004
From:
NRC/NRR/DLPM
To:
Colburn T, NRR/DLPM, 415-1402
Shared Package
ML040930138 List:
References
TAC MC1869, TAC MC1970
Download: ML041450116 (2)


Text

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3/4.5.1 ACCUMULATORS .............................. 3/4 5-1 3/4.5.2 ECCS SUBSYSTEMS - Tavg 2 3500 F .............. 3/4 5-3 3/4.5.3 ECCS SUBSYSTEMS - Tavg < 3500 F .... ......... 3/4 5-6 3/4.5.4 BORON INJECTION SYSTEM 3/4.5.4.1.1 Boron Injection Tank 2 350'F ............... 3/4 5-7 3/4.5.4.1.2 Boron Injection Tank < 350'F ............... 3/4 5-7a 3/4.5.5 SEAL INJECTION FLOW ....................... 3/4 5-8 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 Containment Integrity ..................... 3/4 6-1 3/4. 6.1.2 Containment Leakage ....................... 3/4 6-2 3/4. 6.1.3 Containment Air Locks ..................... 3/4 6-5 3/4. 6.1.4 Internal Pressure ......................... 3/4 6-6 3/4.6.1.5 Air Temperature ........................... 3/4 6-8 3/4 .6.1.6 Containment Structural Integrity .......... 3/4 6-10 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4 . 6.2 . 1 Containment Quench Spray System ........... 3/4 6-11 3/4. 6.2.2 Containment Recirculation Spray System .... 3/4 6-13 3/4.6.2.3 Chemical Addition System .................. 3/4 6-15 3/4 .6.3 CONTAINMENT ISOLATION VALVES .............. 3/4 6-17 BEAVER VALLEY - UNIT 1 VI Amendment No. 259

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

2. Cycling each weight or spring loaded check valve testable during plant operation, through one complete cycle of full travel and verifying that each check valve remains closed when the differential pressure in the direction of flow is < 1.2 psid and opens, when the differential pressure in the direction of flow is

> 1.2 psid but less than 6.0 psid.

b. Immediately prior to returning the valve to service after maintenance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance of the applicable cycling test, above, and verification of isolation time.

4.6.3.1.2 Each containment isolation valve shall be demonstrated OPERABLE* during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:

a. Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.
b. Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.
c. Deleted.
d. Cycling each power operated or automatic valve through at least one complete cycle of full travel and measuring the isolation time.
e. Cycling each weight or spring loaded check valve not testable during plant operation, through one complete cycle of full travel and verifying that each check valve remains closed when the differential pressure in the direction of flow is < 1.2 psid and opens when the differential pressure in the direction of flow is 2 1.2 psid but less than 6.0 psid.
f. Cycling each manual valve not locked, sealed or otherwise secured in the closed position through at least one complete cycle of full travel.
  • Locked or sealed closed valves may be opened on an intermittent basis under administrative control.

BEAVER VALLEY - UNIT 1 3/4 6-18 Amendment No. 259 I