L-04-069, Use of Encryption Software for Electronic Transmission of Safeguards Information

From kanterella
Jump to navigation Jump to search
Use of Encryption Software for Electronic Transmission of Safeguards Information
ML041560440
Person / Time
Site: Beaver Valley
Issue date: 06/01/2004
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-04-069
Download: ML041560440 (3)


Text

Beaver Valley Power Station Route 168 P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077-0004 L. William Pearce 724-682-5234 Site Vice President Fax: 724-643-8069 June 1, 2004 L-04-069 U . S . Nuclear Regulatory Commission Attention : Document Control Desk Washington, DC 20555-0001 Subject : Beaver Valley Power Station, Unit No . 1 and No . 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Use of Encryption Software for Electronic Transmission of Safeguards Information Pursuant to the requirements of 10 CFR 73 .21(g)(3), FirstEnergy Nuclear Operating Company (FENOC) requests approval to process and transmit Safeguards Information (SGI) at the Beaver Valley Power Station (BVPS) using PGP Software (Enterprise, Corporate, or Personal) Desktop Version 8 .0 or the latest validated version, developed with PGP SDK 3 .0 .3 . National Institute of Standards and Technology Certificate 394 validates compliance ofthis SDK with FIPS 140-2 requirements .

An information protection system for SGI that meets the requirements of 10 CFR 73 .21 (b) through (i) has been established and is being maintained . Prior to the first use of encryption software for SGI material, written procedures shall be in place to describe, as a minimum : access controls ; where and when encrypted communications can be made; how encryption keys, codes and passwords will be protected from compromise ; actions to be taken if the encryption keys, codes or passwords are, or are suspected to have been, compromised (for example, notification of all authorized users) ; and how the identity and access authorization of the recipient will be verified.

FENOC intends to exchange SGI with the NRC, Nuclear Energy Institute (NEI), and other SGI holders who have received NRC approval to use PGP software . Mr. Richard W. Dibler, Access Authorization Supervisor is responsible for the overall implementation of the SGI encryption program at BVPS . Mr. Gary L . Garrett, FENOC IT Transition Manager - Business Unit Support is responsible for collecting, safeguarding, and disseminating the software tools needed for encryption and decryption of SGI for FENOC.

Pursuant to 10 CFR 73 .21(g)(3), the transmission of encrypted material to other authorized SGI holders, who have received NRC approval to use PGP software, would be

Beaver Valley Power Station, Unit No . 1 and No. 2 Use of Encryption Software for Electronic Transmission of Safeguards Information L-04-069 Page 2 considered a protected telecommunications system. The transmission and dissemination of unencrypted SGI is subject to the provisions of 10 CFR 73 .21(g)(1) and (2) .

Should you have any questions or require additional information, please contact Mr. Kenneth E. Halliday, Manager, Nuclear Security at 724-682-5072 .

Sincerely, L'. William Pearce References :

10 CFR 73 .21 NRC Regulatory Issue Summary 2002-15 Attachments :

A. List of Regulatory Commitments c: Mr. T . G. Colburn, NRR Senior Project Manager Mr. P . C. Cataldo, NRC Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. Scott Morris, NRC/NISR Mr. Lynn Silvious, NRC/NSIR Mr. Louis Grosman, NRC/OLIO Mr. James Davis, NEI

ATTACHMENT A Commitment List The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Beaver Valley Power Station (BVPS) Unit Nos. 1 and 2 in this document. Any other actions discussed in the submittal represent intended or planned actions by Beaver Valley. These other actions are described only as information and are not regulatory commitments. Please notify Mr. Larry R. Freeland, Manager, Regulatory Affairs/Performance Improvement, at Beaver Valley on (724) 682-5284 of any questions regarding this document or associated regulatory commitments.

Commitment Due Date Prior to the first use of encryption software for SGI Prior to the first use of material, written procedures shall be in place to encryption software for SGI describe, as a minimum: access controls; where and material.

when encrypted communications can be made; how encryption keys, codes and passwords will be protected from compromise; actions to be taken if the encryption keys, codes or passwords are, or are suspected to have been, compromised (for example, notification of all authorized users); and how the identity and access authorization of the recipient will be verified.